Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹2.0 LAccepted-AOC KOHRAUL PO YOGICHIOURA DISTT SONEBHADRA UP | L-1 | Accepted-AOC Technically acceptable and quoted rate lowest. | |
| 2 | Rejected-Technical | - | Rejected-Technical Not evaluated as per NIT | |
| 3 | Rejected-Technical KOTA BASTI SHAKTINAGAR P O SHAKTINAGAR DISTT SONBHADRA U P 231222 | SONBHADRA | UTTAR PRADESH | 231222 | - | Rejected-Technical Not evaluated as per NIT |
| Sl No | Description | Qty | Unit | MEENA ENGINEERING L3 | MOTI ENGINEERING WORKS L2 | SHASHI ENGINEERING WORKS L1 |
|---|---|---|---|---|---|---|
| 2.00 | Making of platform for welding and fitting for machine coaxial boring | 1 | job | 11,900 ₹11,900 | 13,000 ₹13,000 | 5,000 ₹5,000 Lowest |
| 3.00 | Welding of crowd transmission of boom bush housing | 1 | job | 6,400 ₹6,400 | 5,000 ₹5,000 Lowest | 13,371.2 ₹13,371.2 |
| 4.00 | Machinist for grinding before welding | 1 | job | 4,200 ₹4,200 | 2,000 ₹2,000 Lowest | 2,000 ₹2,000 Lowest |
| 5.00 | Coaxial boring housing size 336mm ID X 460mm length | 4,780.96 | cubic centimeter | 46 ₹2,19,924.16 | 45 ₹2,15,143.2 | 30 ₹1,43,428.8 Lowest |
| 6.00 | Charges of bush fitting by special type of bush press arrangement, plate etc with manpower | 1 | lumsum | 7,000 ₹7,000 | 5,000 ₹5,000 | 4,000 ₹4,000 Lowest |
| 7.00 | Welding machine charge | 8 | days | 200 ₹1,600 | 200 ₹1,600 | 150 ₹1,200 Lowest |
| 8.00 | Contractor profit
Note:
1.New bushing Part No- 5T288 will be given departmentally
2.EPF/CMPF on labour charges is not included in the Estimated cost and will be reimbursed only after producing of documentary evidence of EPF/CMPF payment. | 1 | percent | - | 2,500 ₹2,500 Lowest | - |
| 9.00 | Total impact of GST for the purpose of CTC | 1 | Nos | - | - | - |
Tender Value
₹4.2 L
EMD Value
₹5,300
Closing Date
3 Nov 2025, 11:00 amClosed
Staff Officer (Excavation)
Office of the General Manager, Kakri Project, NCL.
Repairing or rebuilding and coaxial boring of crowd transmission of boom bush housing and fitting of new P.B bushing for PandH-I shovel (EXC-1282) at Kakri Project.
2025_NCL_346029_1
KKR/GM(Excv)/E-27/25-26/248
Open Tender
Excavation Department Work
Item Rate
12 days
NCL Kakri Project
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,300
24 Jan 2026
22 Oct 2025
4 Nov 2025
22 Oct 2025
3 Nov 2025
23 Oct 2025
22 Oct 2025 - 26 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_358705.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Document
1.20 MB
Tender Documents
Tender Documents • 1.49 MB
Tender Documents
Tender Documents • 0.56 MB
BOQ
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .