Loading
Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.8 LAdmitted-Finance | ₹8.8 L | L1 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Apex construction L1 |
|---|---|---|---|---|
| 1.00 | Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. | 600 | Sq. meter | 39,000 ₹46,020 |
| 2.00 | CEMENT PLASTER (IN FINE SAND) : 20 mm cement plaster :
1:4 (1 cement : 4 fine sand) | 600 | Sq. meter | 3,18,000 ₹3.8 L |
| 3.00Chipping of unsound/weak concrete material from slabs, beams, columns etc. with manual Chisel and/ or by standard power driven percussion type or of approved make including tapering of all edges, making square shoulders of cavities including cleaning the exposed concrete surface and reinforcement with wire brushes etc. and disposal of debris for all lead and lifts all complete as per direction of Engineer-In-Charge : | ||||
| 3.10 | 50.0 mm average thickness | 30 | Sq. meter | 8,640 ₹10,195.20 |
| 3.20 | 25.0 mm averag thk. | 15 | Sq. meter | 2,130 ₹2,513.40 |
| 4.00 | Cleaning of reinforcement from rust from the reinforcing bars to give it a total rust free steel surface by using alkaline chemical rust remover of approved make with paint brush and removing loose particles after 24 hours of its application with wire brush and thoroughly washing with water and allowing it to dry, all complete as per direction of Engineer-In-Charge. : Bars upto 12 mm diameter | 150 | Rmt | 1,395 ₹1,646.10 |
| 5.00 | Drilling suitable holes in reinforced or plain cement concrete with power driven drill machine to a minimum depth of 100mm upto 200mm in RCC beams, lintels, columns and slabs to introduce steel bars for sunshades/balconies including fixing the steel bars in position using epoxy resin anchor grout of approved make but excluding the cost of
reinforcement, all complete as per direction of Engineer-In-Charge. : Upto and including 12mm dia. | 30 | each | 4,800 ₹5,664 |
| 6.00 | Providing, mixing and applying bonding coat of approved adhesive on chipped portion of RCC as per specifications and direction of Engineer-In-charge complete in all respect. :
SBR Polymer (@10% of cement weight) modified
cementitious bond coat @ 2.2 kg cement per sqm of
surface area mixed with specified proportion of approved
polymer | 15 | Sq. meter | 2,400 ₹2,832 |
| 7.00Providing, mixing and applying SBR polymer (of approved make) modified Cement mortar in proportion of 1:4 (1 cement: 4 graded coarse sand with polymer minimum 2% by wt. of cement used) as per specifications and directions of Engineer-in-charge. Note: Measurement and payment: The pre-measurement of thickness shall be done just after the surface preparation is completed and Payment under this item shall be made only after proper wet curing has been done and surface has been satisfactorily evaluated by sounding / tapping with a blunt metal instrument and/or the 75mm size cube crushing strength at the end of 28 days to be not less than 30 N/Sqmm2). : | ||||
| 7.10 | 25 mm average thickness in 2 layers. | 15 | Sq. meter | 9,929.1 ₹11,716.34 |
Tender Value
₹7.7 L
EMD Value
₹15,497
Closing Date
18 Dec 2025, 3:00 pmClosed
Director
TIFR Mumbai
Repairs to two nos. of lift shafts in Meghnad Building at TIFR, Residential complex, Colaba.
2025_DAE_872247_4
TIFR/PD/CF25-29/250834
Open Tender
Civil Works
330 days
TIFR Mumbai
as per attached document
5 documents required · 5 mandatory
₹0
₹15,497
9 Feb 2026
3 Dec 2025
19 Dec 2025
4 Dec 2025
18 Dec 2025
4 Dec 2025
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Document
1.86 MB
Tender Documents
Tender Documents • 1.88 MB
BOQ
BOQ • 0.35 MB
Download all tender documents and submit your bid