Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹34.9 LAccepted-Finance 00 AGRA AGRA UTTAR PRADESH 282001 | AGRA | UTTAR PRADESH | 282001 | ₹34.9 L | L1 | Accepted-Finance L1 |
| 2 | L2₹49.1 LRejected-Finance | ₹49.1 L | L2 | Rejected-Finance L2 |
| 3 | L3₹52.4 LRejected-Finance | ₹52.4 L | L3 | Rejected-Finance L3 |
| 4 | Rejected-Technical | - | - | Rejected-Technical DISQUALIFIED |
| 5 | Rejected-Technical | - | - | Rejected-Technical DISQUALIFIED |
Tender Value
₹52.9 L
EMD Value
₹1.1 L
Closing Date
17 Apr 2026, 5:00 pmClosed
GM(P)
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
M/O trees shrubs on 60 mtr wide road central verge and both side patri from ch.13.60 km to 22.30 km along with 50 mtr wide green belt ch.20.10km to 21.10km for two years yeida . WC-H
2026_YEIDA_1134071_13
YEA/GM(PROJECT)/2026/488 DT-01/04/2026
Open Tender
Civil Works
Fixed-rate
730 days
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
Please refer Tender documents.
5 documents required · 5 mandatory
₹1,630
₹1.1 L
6 Aug 2026
9 Apr 2026
21 Apr 2026
9 Apr 2026
17 Apr 2026
9 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Complete maintenance of trees on road side plantation (RSP) belt ( Out side garden features ), jobs like making of basin at regular interval i/c watering, weeding, pruning & application of fertilizer etc, (excluding the cost of material which shall be supplied by the department and other T & P material/ articles shall be provided by the contractor )and as per direction of officer in charge. | - | - | - | - |
| 1.01 | trees ( beyond 8 years slow & beyond 6 years Fast growing group) 60mtr road 13.60km to 22.30 km=3289 | - | Per plant per month | - | - |
| - | Complete maintenance of trees in green belt (Out side garden features) jobs like making of basin at regular interval i/c watering , weeding pruning & application of fertilizer etc, (excluding the cost of material which shall be supplied by the department and other T& P material / articles shall be provided by the contractor ) and as per diection of officer in charge. Complete maintenance in green belt (out side garden ) | - | - | - | - |
| 2.01 | trees ( beyond 8 years slow & beyond 6 years Fast growing group) 20.10 km to 21.10km =2425 nos | - | Per plant per month | - | - |
| - | Complete maintenance of shrubs on RSP (Out side garden features) jobs like making of basin at regular interval i/c watering , weeding pruning & application of fertilizer etc, (excluding the cost of material which shall be supplied by the department and other T& P material / articles shall be provided by the contractor ) and as per diection of officer in charge. ( up to (5-8 & 4-63 year slow & Fast growing group) | - | - | - | - |
| 3.01 | Shurbs on RSP and central verge ch. 13.60km to 22.30km=11861nos | 0.29 | Per plant per month | - | - |
| - | Providing and watering for irrigation water through water tanker of Horticulture features i.e. lawn, tree, shrubs, hedge/edge, ground cover etc. at the site of work . Water tanker having 5000 lit. capacity with one labour for watering i/c cost of water, filling of tanker, watering at site with all leads and lifts as per direction of officer in charge. (Rate analysed as per DSR-18 on actual observation ) | - | - | - | - |
| - | trees ( beyond 8 years slow & beyond 6 years Fast growing group) 60mtr road 13.60km to 22.30 km=3289 | - | Per plant per month | 1 | - |
| - | Shurbs on RSP and central verge ch. 13.60km to 22.30km=11861nos | 0.29 | Per plant per month | - | - |
| - | Providing and watering for irrigation water through boring and RH pipe in gren belt of horticulture features ie.e lawn trees shrubs hedge ground cover etc at the site of work including supply water and RH pipe for watering each plant and complete arrrangement of watering with DG set boring pump and labour for watering at site with all leada and lifts as per direction in charge. | - | - | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.20 MB
BOQ_2118801.xls
BOQ • 0.27 MB
13.pdf
Tender Documents • 2.09 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].