| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.8 LAccepted-Finance | L1 | Accepted-Finance Accepted | |
| 2 | L2₹10.8 L+₹87.83 (<0.01%)Rejected-Finance | L2 | Rejected-Finance Rejected |
Tender Value
₹11.6 L
EMD Value
₹11,630
Closing Date
10 Jul 2025, 3:00 pmClosed
BDO (BP)
BDO Office, Sattur
Renovation of School Building in PU Middle School (Tiled Roof) at K.Chockalingapuram Village of Kundalakuthur Panchayat
2025_RDTN_573453_1
A7/3427/2024
Open Tender
Civil Works
Works
Sattur
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹11,630
Yes
11 Jul 2025
25 Jun 2025
10 Jul 2025
25 Jun 2025
10 Jul 2025
25 Jun 2025
Renovation School Building
Earth work excavation for foundation (for narrow excavation) in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2 mts. and clearing and levelling the site, etc., complete complying with standard specification.
Cement Concrete 1:4:8 (One Cement, Four sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification
Brick work in cement mortar 1:5 mix using country bricks 83/4"x41/4"x21/4"and conveyance of all materials to site and all labour charges etc complete for 100 cft (2.832 cum) - Above base
Providing granolithic floor finish of the following thickness with plain cement concrete 1:2:4 (One Cement, Two Sand and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers) 40mm thick
Plastering with Cement Mortar 1:5 (One cement and Five sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
Distempering the old wall and ceiling two coats with best oil bound distember of approved quality including preparation of surface, the rate includes cost of brushes, high scaffolding arrangements, neat finishes, etc., complete complying with standard specification and as directed by the departmental officers
Providing Blockboard in two layers with first layer in cement mortar 1:5 (one cement and five crushed stone sand)20mm thick and the second layer in Combination mortar 1:1:6(one cement one lime and six crushed stone sand) 20mm thick and providing band all round the block board in c.m 1:5 (one cement and five crushed stone sand) for 20mm thick and 50mm width including cost of one coat of block oxide paint of approved quality complying with standard specification.
Providing and Fixing of polyurethane foam for Sloped roofs thermal insulation panels or Sandwich insulated panels with external 0.50mm total coated thickness pre painted Galvalume sheet with trapezoidal roofing profile having crest height of 38mm at every 333mm span , whereas internal 0.50mm total coated thickness pre painted galvanized iron sheet with micro ribbed profile and the insulation material will be chlorofluoro carbon and hydro chlorofluoro carbon free , high performance rigid polyurethane foam (PUF) conforming to IS 12436 having density not less than 40±2Kg/M3, Thermal conductivity (K-Value) 0.024 W/m.K measured at 10 degree C mean temperature along with necessary flashings such as L flashing, C flashing etc& accessories such as screws ,fastners ,sealants etc for fixing the panel etc., complete complying with standard specification. 50mm ( 38mm) thick PUF roof panel
Painting the old iron works two coats with syntactic enamel paint of approved quality and colour including ordinary scraping using brushes and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer (the colour and quality should be got approved by the Executive Engineer before use)
Providing Students Cubboard arrangements
Brick work in cement mortar 1:5 mix using country bricks 83/4"x41/4"x21/4"and conveyance of all materials to site and all labour charges etc complete for 100 cft (2.832 cum) - Above base
Plastering with Cement Mortar 1:5 (One cement and Five sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Supplying and fixing following thickness of cuddapah slab for cupboard 20-30mm thick
Distempering the old wall and ceiling two coats with best oil bound distember of approved quality including preparation of surface, the rate includes cost of brushes, high scaffolding arrangements, neat finishes, etc., complete complying with standard specification and as directed by the departmental officers.
Providing Cheppal Rack arrangements
Brick work in cement mortar 1:5 mix using country bricks 83/4"x41/4"x21/4"and conveyance of all materials to site and all labour charges etc complete for 100 cft (2.832 cum) - Above base
Plastering with Cement Mortar 1:5 (One cement and Five sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Supplying and fixing following thickness of cuddapah slab for cupboard 20-30mm thick
Distempering the old wall and ceiling two coats with best oil bound distember of approved quality including preparation of surface, the rate includes cost of brushes, high scaffolding arrangements, neat finishes, etc., complete complying with standard specification and as directed by the departmental officers.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .