Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Accepted |
| 2 | Accepted-Technical | Accepted-Technical Accepted |
| 3 | Accepted-Technical 25 PRATAP COMPLEX GULAB SINGH MARG JAMMU | Accepted-Technical Accepted |
| 4 | Accepted-Technical BHAGWATI NAGAR JAMMU | Accepted-Technical Accepted |
| 5 | Accepted-Technical 0 0 0 NEAR DAK BUNGLOW NH 1 A NH 1A UDHAMPUR UDHAMPUR JAMMU KASHMIR 182101 | UDHAMPUR | JAMMU AND KASHMIR | 182101 | Accepted-Technical Accepted |
Tender Value
₹1.2 L
Closing Date
20 Feb 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Ex Engineer JSD PHE M Div South Jmu
Office of the Ex Engineer JSD PHE M Div South Jmu
Providing and Fitting of components to 100 KVA and 63 KVA voltage stabilizer installed at Tubewell No 19 Police Line and 14 Boria respectively under 8448 GIA
2026_PHE_303119_1
e-NIT PHEJ/MS/113 of 2025-26 Dated 13-02-2026
Open Tender
Repair and Maintenance Works
Item Wise
7 days
Jammu
As per NIT
7 documents required · 7 mandatory
₹200
Ex Engineer JSD PHE M Div South Jmu
Exempted
28 Feb 2026
14 Feb 2026
21 Feb 2026
14 Feb 2026
20 Feb 2026
14 Feb 2026
Select, Excess (+), Less (-) Less (-)
Tender Inviting Authority: Executive Engineer PHE MECHANICAL DIVISION SOUTH JAMMU
Name of Work: Providing and Fitting of components to 100 KVA and 63 KVA voltage stabilizer installed at Tubewell No 19 Police Line and 14 Boria respectively under 8448 GIA
Contract No: e-NIT No.PHEJ/MS/113 of 2025-26 Dated 13-02-2026
Name of the Bidder/ Bidding Firm / Company :
Sl. No. Item Description Item Code / Make Quantity Units Estimated Rate in Rs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency RATE Inclusive of all Taxes In Figures To be entered by the Bidder Rs. P SGST in Rs Rs. P CGST in Rs Rs. P Rebate On Old Parts In Rs Rs. P Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category
1 Providing and Fitting of components to 100 KVA Voltage Stabilizer of Tubewell 19 Police Line by way of disconnecting input and output electric supply connections of the Voltage Stabilizer and making connections of main switch directly with the LT Control Panel. Dragging the voltage stabilizer from its position manually/manpower and sent to workshop for repairs. Dismantling of top cover and extraction of the transformer assembly from the oil tank with the help of chain pulley block. Complete replacement of 2 no main copper coil by providing and fitting of new coils made out of superior quality copper wire as per the original design and reconditioning of 1 no coils and varnishing of all the three coil sets. Dismantling and extraction of rotary switch assemblies, Providing and Fitting of 2 No. rotary switch assemblies. The job further involves draining out all the transformer oil from the oil tank, cleaning the oil tank, dehydrating the Transformer-Oil by heating with the heating coils. Again refilling the same T- Oil after dehydration, filtration and adding fresh T-Oil 70 litres to top up the level. Assembling the stabilizer transformer and lowering in the oil tank with the help of chain pulley block. Repairs to internal control wiring of the panel of the stabilizer, the job also includes providing and replacement of damaged voltmeters, selector switches and RYB indicators. Fitting the panel board and top cover. Shifting back the stabilizer to site and positioning inside the pump room manually. Making connections by providing and fitting new thimbles after cutting heated ends and testing on full load. The Job inclusive rebate on account of old copper scrap. Complete job includes the cost of material and labour charges 0.000 Job Excess(+) Full Conversion INR
2 Providing and Fitting of components to 63 KVA Voltage Stabilizer of Tubewell 14 Boria by way of disconnecting input and output electric supply connections of the Voltage Stabilizer and making connections of main switch directly with the LT Control Panel. Dragging the voltage stabilizer from its position manually/manpower and sent to workshop for repairs. Dismantling of top cover and extraction of the transformer assembly from the oil tank with the help of chain pulley block. Complete replacement of 1 no main copper coil by providing and fitting of new coils made out of superior quality copper wire as per the original design and reconditioning of 2 no coils and varnishing of all the three coil sets. Dismantling and extraction of rotary switch assemblies, Providing and Fitting of 1 No. rotary switch assemblies. The job further involves draining out all the transformer oil from the oil tank, cleaning the oil tank, dehydrating the Transformer-Oil by heating with the heating coils. Again refilling the same T- Oil after dehydration, filtration and adding fresh T-Oil 45 litres to top up the level. Assembling the stabilizer transformer and lowering in the oil tank with the help of chain pulley block. Repairs to internal control wiring of the panel of the stabilizer, the job also includes providing and replacement of damaged voltmeters, selector switches and RYB indicators. Providing and fitting of MCCB 125 Amp of reputed make. Fitting the panel board and top cover. Shifting back the stabilizer to site and positioning inside the pump room manually. Making connections by providing and fitting new thimbles after cutting heated ends and testing on full load. The Job inclusive rebate on account of old copper scrap. Complete job includes the cost of material and labour charges 0.000 Job Excess(+) Full Conversion INR
Total in Figures
Quoted Rate in Figures Upkeepment of 6000 GPH x 80 mtr x 12.5 HP Submersible Pumpset of T/well Sec-14 Nanak Nagar by way of disconnection of power supply and extraction of Submersible Pumpset using skilled labour with allied tools and tackles. Dismantling and shifting of pumpset to workshop by Mech. Transport. Repairing by Providing, fabrication and fitting of S.S pump shaft as per sample, 8no. impellers, 6 no. pump bodies, 8no. neck rings, 8no. body bushes, SS coupling pulley and nut bolts and assembling of punp atworkshop. The Job includes dismantling and repairing of 12.5 HP Submersible motor by providing, fabrication and fitting of thrust pad set and rotor bushes. Assembling of the motor, coupling with pump and testing the pumpset in the test pit then shifting of pumpset to the site of installation. Making electrical connections of motor with sub cable by making leak proof joint and lowering of pump set along with providing and replacing rubber gaskets and nut bolts. Making connections of submersible cable with panel and then testing on full load Select
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.48 MB
BOQ_983767.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .