Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance 1B 35 JAWAHAR NAGAR PO BERMO DIST BOKARO PIN 825104 JHARKHAND | BERMO | BOKARO | JHARKHAND | 825104 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance 496665 | RAIGARH | CHHATTISGARH | 496665 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance TETULMURI DHANBAD 00 00 TETULMURI SIJUA DHANBAD TETULMURI DHANBAD 00 00 TETULMURI SIJUA DHANBAD DHANBAD 828121 JHARKHAND INDIA | DHANBAD | DHANBAD | JHARKHAND | 828121 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹5.3 L
EMD Value
₹6,700
Closing Date
26 Jul 2022, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
PE EnM , KOCP
PE EnM Office, KOCP
Frequent extension and dismentalling of 02 range 8 inch dia pipeline and shifting of 02 nos 2000gpm pump motor set as per requirement at Patch A of KOCP for a period of six months (180 days) or till the exhausting of estimated quantity at KOCP , BnK
2022_CCL_250631_1
PE(EnM)/KOCP/etender/22-23/08
Open Tender
Miscellaneous Works
Item Rate
180 days
Karo OCP
Please refer Tender documents.
10 documents required · 10 mandatory
₹6,700
27 Jul 2022
20 Jul 2022
27 Jul 2022
20 Jul 2022
26 Jul 2022
21 Jul 2022
20 Jul 2022 - 26 Jul 2022
120 days
Amount
Frequent extension and dismentalling of 02 range 8 inch dia pipeline and shifting of 02 nos 2000gpm pump motor set as per requirement at Patch A of KOCP for a period of six months (180 days) or till the exhausting of estimated quantity at KOCP , BnK Area
Dismantalling of existing 8" dia pipeline
Laying of 8" dia GI Pipeline
Fitting and fixing of 8" dia GI Sluice valve / Non return valve , Bend and nipple
Supply of 8" GI Flange
Cutting of 8" dia GI Pipe for smooth surface making and degree requirement of flange and bend as required
Double layer welding of 8" dia pipeline and flange
Supply of MS Nut and Bolt
Making and cutting of rubber joint for fixing of pipe
Transporting of 8" dia GI pipe
Making of place for 2000gpm pump motor set to be installed during shifting time . Approx 28 time in six month period
Dismantalling of pump motor set its transportation to new place to be installed and its installation and testing
Supply and fixing of test valve 1 inch dia
Total impact of GST for the purpose of CTC
SUNRISE ENTERPRISES
SANTOSH KUMAR SINGH
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .