Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.9 LAccepted-AOC | ₹15.9 L | L1 | Accepted-AOC Qualified in AOC |
| 2 | L2₹16.2 LRejected-AOC | ₹16.2 L | L2 | Rejected-AOC Not Qualified in AOC |
| 3 | L3₹16.3 LRejected-AOC CHENNAI | CHENNAI | TAMIL NADU | 600001 | ₹16.3 L | L3 | Rejected-AOC Not Qualified in AOC |
| 4 | L4₹16.6 LRejected-AOC | ₹16.6 L | L4 | Rejected-AOC Not Qualified in AOC |
| 5 | L5₹16.7 LRejected-AOC | ₹16.7 L | L5 | Rejected-AOC Not Qualified in AOC |
| Sl No | Description | Qty | Unit | sriramulu L1 | S.Muralikumar L2 | Veerajaconstructions L8 | N.Sriramulu L11 | KRISHNAPRIYA L9 | Mageshkumar L6 | V.DHEENATHAYALAN L13 | T.SEEMAN L5 | SSM INFRA CONSTRUCTION L12 | SATHEESH CONSTRUCTIONS L4 | GP Enterprises L7 | SUDHA L3 | KALAIMANI VIJAYAGOPAL L10 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation in all soils and sub - soils to full depth etc. complete as per SS 20B | 59.76 | m3 | 106 ₹6,334.56 | 120 ₹7,171.20 | 116 ₹6,932.16 | 130 ₹7,768.80 | 121 ₹7,230.96 | 113 ₹6,752.88 | 130 ₹7,768.80 | 111.3 ₹6,651.29 | 110 ₹6,573.60 | 110 ₹6,573.60 | 112 ₹6,693.12 | 109 ₹6,513.84 | 100 ₹5,976 |
| 2.00 | Cement concrete 1:4:8 for foundation using 40mm HBG metal etc. complete. | 100.85 | m3 | 4,295 ₹4.3 L | 4,500 ₹4.5 L | 4,703 ₹4.7 L | 5,251 ₹5.3 L | 4,930 ₹5.0 L | 4,557 ₹4.6 L | 5,340 ₹5.4 L | 4,516.35 ₹4.6 L | 5,340 ₹5.4 L | 4,542 ₹4.6 L | 4,542.4 ₹4.6 L | 4,409 ₹4.4 L | 5,200 ₹5.2 L |
| 3.00 | Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method including all etc., | 80.93 | m3 | 1,856 ₹1.5 L | 1,800 ₹1.5 L | 2,033 ₹1.6 L | 2,270 ₹1.8 L | 2,125 ₹1.7 L | 1,985 ₹1.6 L | 2,328 ₹1.9 L | 1,967.75 ₹1.6 L | 2,300 ₹1.9 L | 1,940 ₹1.6 L | 1,990.44 ₹1.6 L | 1,906 ₹1.5 L | 2,200 ₹1.8 L |
| 4.00 | Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle | 435.75 | m2 | 265 ₹1.2 L | 250 ₹1.1 L | 290 ₹1.3 L | 324 ₹1.4 L | 300 ₹1.3 L | 281 ₹1.2 L | 329 ₹1.4 L | 278.85 ₹1.2 L | 324 ₹1.4 L | 277 ₹1.2 L | 282.15 ₹1.2 L | 272 ₹1.2 L | 300 ₹1.3 L |
| 5.00 | Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed | 119.83 | m3 | 5,332 ₹6.4 L | 5,470 ₹6.6 L | 5,840 ₹7.0 L | 6,520 ₹7.8 L | 6,300 ₹7.5 L | 5,657 ₹6.8 L | 6,630 ₹7.9 L | 5,607.25 ₹6.7 L | 6,630 ₹7.9 L | 5,507.77 ₹6.6 L | 5,672.93 ₹6.8 L | 5,475 ₹6.6 L | 6,400 ₹7.7 L |
| 6.00 | Supply and fixing for Bitumen Pad including watering including all labour charges etc.complete. | 13.5 | m2 | 177 ₹2,389.50 | 180 ₹2,430 | 194 ₹2,619 | 216 ₹2,916 | 220 ₹2,970 | 188 ₹2,538 | 220 ₹2,970 | 220 ₹2,970 | 215 ₹2,902.50 | 184.8 ₹2,494.80 | 187 ₹2,524.50 | 182 ₹2,457 | 200 ₹2,700 |
| 7.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works.{ GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount | 2,42,367.88 ₹2.4 L | 2,47,231.4 ₹2.5 L | 2,65,419.74 ₹2.7 L | 2,96,358.09 ₹3.0 L | 2,81,703.91 ₹2.8 L | 2,57,370.2 ₹2.6 L | 3,01,593.15 ₹3.0 L | 2,55,198.75 ₹2.6 L | 3,00,565.8 ₹3.0 L | 2,52,869.78 ₹2.5 L | 2,57,604.92 ₹2.6 L | 2,48,843.58 ₹2.5 L | 2,89,580.22 ₹2.9 L |
Tender Value
₹20 L
EMD Value
₹20,000
Closing Date
10 Feb 2026, 3:00 pmClosed
The Block Development Officer VP.
Panchayat union office Building Lathur at Pavunjur
Providing Cement Concrete Pavement in Periya Colonyt at Iraniyasithi Panchayat Lathur Panchayat Union.PMAGY/2025-2026 Estimate.20.00 Lakhs
2026_RDTN_651434_1
Tender ref no . 2597/2025/A9 Date.28.01.2026
Open Tender
Civil Works
Providing Cement Concrete Pavement in Periya Colon
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹20,000
Yes
23 Feb 2026
5 Feb 2026
10 Feb 2026
5 Feb 2026
10 Feb 2026
5 Feb 2026
Earth work excavation for foundation in all soils and sub - soils to full depth etc. complete as per SS 20B
Cement concrete 1:4:8 for foundation using 40mm HBG metal etc. complete.
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method including all etc.,
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed
Supply and fixing for Bitumen Pad including watering including all labour charges etc.complete.
GST Amount for providing Service to Government Contract Works for the above Construction Works.{ GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.07 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.53 MB
Technical.pdf
Tender Documents • 0.77 MB
BOQ_781160.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid