| 1 | L1₹7.3 LAdmitted-Finance | ₹7.3 L | L1 | Admitted-Finance |
| 2 | L2₹8.2 L+₹92,109 (12.6%)Admitted-Finance | ₹8.2 L+₹92,109 (12.6%) | L2 | Admitted-Finance |
| 3 | L3₹8.3 L+₹94,424 (12.9%)Admitted-Finance | ₹8.3 L+₹94,424 (12.9%) | L3 | Admitted-Finance |
| 4 | L4₹8.5 L+₹1.2 L (16.7%)Admitted-Finance | ₹8.5 L+₹1.2 L (16.7%) | L4 | Admitted-Finance |
| 5 | L5₹8.6 L+₹1.3 L (17.2%)Admitted-Finance | ₹8.6 L+₹1.3 L (17.2%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | The Trikuta Engineer L12 | M/S HI-TECH ELECTRICAL CONSTRUCTIONS AND SUPPLIERS L14 | R V GROUP L20 | M/S SIGMA CONSTRUCTION L17 | M/S RAJ ELECTRICAL CONTRACTOR L1 | JASMEET SINGH L8 | M/S R. V ENTERPRISES L7 | ASHISH SINGH L6 | M/S PIONEER ENGINEERS L15 | M/S SINGH ELECTRICALS L13 | M/S NEW TRIKUTA TECHNOCRATES L5 | NEW ALLIED TRADERS L3 | M/S SWASTIC ELECTRICAL CONTRACTOR AND SUPPLIERS L9 | M/s MAHASHAKTI ELECTRICAL WORKS L11 | PADMA CONSTRUCTIONS L21 | M/S PARAS ELECTRICAL L23 | M/S APR CONSTRUCTIONS L19 | RAGHBIR SINGH L22 | M/S DAYAL BUILD TECH L16 | VINAYAK ENGINEERS L10 | JAMWAL ELECTRICALS L4 | M/S A A ENTERPRISES L2 | M/S TRANS TECH ENGINEERS L18 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Creation of 11/0.433kV, 25 KVA, 3-phase Distribution Substation | ||||||||||||||||||||||||||
| 1.01 | Supply, Installation & commissioning of 11/0.433kV, 25 KVA, 3-phase Distribution Transformers with Bimetallic Terminal Connectors Energy Level-2, (Aluminium wound) with LV Cable Box having detachable Aluminium Gland plate. ( As per Latest Ammendment upto date) | 1 | No | 1,00,000 ₹1,00,000 | 1,10,000 ₹1,10,000 | 1,05,000 ₹1,05,000 | 97,000 ₹97,000 | 75,000 ₹75,000 Lowest | 1,59,720 ₹1,59,720 | 1,05,000 ₹1,05,000 | 97,000 ₹97,000 | 1,50,000 ₹1,50,000 | 1,00,000 ₹1,00,000 | 90,000 ₹90,000 | 90,000 ₹90,000 | 1,40,000 ₹1,40,000 | 97,000 ₹97,000 | 1,06,000 ₹1,06,000 | 1,50,000 ₹1,50,000 | 1,05,000 ₹1,05,000 | 1,20,000 ₹1,20,000 | 95,000 ₹95,000 | 1,10,000 ₹1,10,000 | 1,15,000 ₹1,15,000 | 1,00,000 ₹1,00,000 | 95,000 ₹95,000 |
| 1.02 | Supply, Transportation, Erection of 9 Mtr Long ST Pole (ST-410 SP33) including excavation of pit and back filling of soil & consolidating by ramming, watering etc. Including painting with two coats of Red Oxide and Al. Paint for smooth surface. | 2 | No | 18,000 ₹36,000 | 16,000 ₹32,000 | 18,000 ₹36,000 | 19,500 ₹39,000 | 15,000 ₹30,000 | 15,000 ₹30,000 | 14,000 ₹28,000 Lowest | 16,500 ₹33,000 | 18,000 ₹36,000 | 18,000 ₹36,000 | 18,000 ₹36,000 | 18,500 ₹37,000 | 15,000 ₹30,000 | 19,000 ₹38,000 | 18,000 ₹36,000 | 25,000 ₹50,000 | 18,000 ₹36,000 | 18,500 ₹37,000 | 19,500 ₹39,000 | 16,000 ₹32,000 | 19,500 ₹39,000 | 15,000 ₹30,000 | 18,000 ₹36,000 |
| 1.03 | Supply, Transportation, Fabrication & Fixing of G.I Channel Iron, Cross arms, Angle Iron Braces, Clamps etc. duly fabricated including all necessary G.I Nut & Bolts & Washers etc. | 250 | Kg | 140 ₹35,000 | 130 ₹32,500 | 160 ₹40,000 | 150 ₹37,500 | 122 ₹30,500 | 130 ₹32,500 | 122 ₹30,500 | 105 ₹26,250 Lowest | 155 ₹38,750 | 150 ₹37,500 | 140 ₹35,000 | 135 ₹33,750 | 150 ₹37,500 | 150 ₹37,500 | 160 ₹40,000 | 160 ₹40,000 | 160 ₹40,000 | 150 ₹37,500 | 150 ₹37,500 | 135 ₹33,750 | 130 ₹32,500 | 125 ₹31,250 | 210 ₹52,500 |
| 1.04 | Supply, Installation, Testing & Commissioning of 11kV GO, AB Switch 3-Phase, 3-Pole, 200 Amp, Vertical Type | 1 | Set | 10,000 ₹10,000 | 11,000 ₹11,000 | 10,000 ₹10,000 | 15,000 ₹15,000 | 8,800 ₹8,800 | 9,000 ₹9,000 | 9,000 ₹9,000 | 10,800 ₹10,800 | 9,900 ₹9,900 | 9,000 ₹9,000 | 10,000 ₹10,000 | 8,500 ₹8,500 | 5,000 ₹5,000 Lowest | 9,000 ₹9,000 | 10,000 ₹10,000 | 12,000 ₹12,000 | 10,000 ₹10,000 | 12,000 ₹12,000 | 15,000 ₹15,000 | 10,500 ₹10,500 | 10,600 ₹10,600 | 10,000 ₹10,000 | 14,500 ₹14,500 |
| 1.05 | Supply, Installation, Testing & Commissioning of 11 kV Horn Gap Fuse Set 3 Phase 200A | 1 | Set | 4,000 ₹4,000 | 9,000 ₹9,000 | 6,000 ₹6,000 | 8,000 ₹8,000 | 4,000 ₹4,000 | 3,000 ₹3,000 Lowest | 6,500 ₹6,500 | 7,200 ₹7,200 | 6,000 ₹6,000 | 5,000 ₹5,000 | 4,000 ₹4,000 | 4,500 ₹4,500 | 4,500 ₹4,500 | 6,000 ₹6,000 | 6,000 ₹6,000 | 9,000 ₹9,000 | 6,000 ₹6,000 | 7,500 ₹7,500 | 8,000 ₹8,000 | 6,000 ₹6,000 | 4,500 ₹4,500 | 4,000 ₹4,000 | 8,500 ₹8,500 |
| 1.06 | Supply & Fixing of Gapless Surge Arrestor,9 kV ,10 kA, LA with polymer housing, Stn. Type | 1 | Set | 4,000 ₹4,000 | 7,000 ₹7,000 | 6,000 ₹6,000 | 8,000 ₹8,000 | 3,700 ₹3,700 | 6,000 ₹6,000 | 7,500 ₹7,500 | 7,200 ₹7,200 | 5,500 ₹5,500 | 5,000 ₹5,000 | 4,200 ₹4,200 | 4,000 ₹4,000 | 3,500 ₹3,500 Lowest | 7,000 ₹7,000 | 6,000 ₹6,000 | 6,500 ₹6,500 | 6,000 ₹6,000 | 10,000 ₹10,000 | 8,000 ₹8,000 | 6,500 ₹6,500 | 7,200 ₹7,200 | 4,000 ₹4,000 | 12,000 ₹12,000 |
| 1.07 | Providing & fixing of 50 mm² Single-Core Cable,1.1kV Grade, PVC Insulated Stranded Conductor FRLS type along with 12 Nos Al. Thimble of size | 44 | Mtr | 100 ₹4,400 Lowest | 250 ₹11,000 | 250 ₹11,000 | 300 ₹13,200 | 245 ₹10,780 | 130 ₹5,720 | 185 ₹8,140 | 115 ₹5,060 | 250 ₹11,000 | 350 ₹15,400 | 250 ₹11,000 | 200 ₹8,800 | 100 ₹4,400 Lowest | 190 ₹8,360 | 250 ₹11,000 | 200 ₹8,800 | 250 ₹11,000 | 340 ₹14,960 | 300 ₹13,200 | 160 ₹7,040 | 150 ₹6,600 | 100 ₹4,400 Lowest | 345 ₹15,180 |
| 1.08 | LT Fuse Switch with Aluminium Strip and Bus Bar insulators | 1 | No | 10,000 ₹10,000 | 25,000 ₹25,000 | 15,000 ₹15,000 | 8,000 ₹8,000 | 6,500 ₹6,500 | 5,000 ₹5,000 | 8,000 ₹8,000 | 18,000 ₹18,000 | 5,000 ₹5,000 | 6,000 ₹6,000 | 5,000 ₹5,000 | 6,350 ₹6,350 | 2,500 ₹2,500 Lowest | 9,000 ₹9,000 | 15,000 ₹15,000 | 7,500 ₹7,500 | 15,000 ₹15,000 | 12,000 ₹12,000 | 8,000 ₹8,000 | 6,000 ₹6,000 | 6,500 ₹6,500 | 5,000 ₹5,000 | 6,000 ₹6,000 |
| 1.09 | Providing of Earthing of substation --Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 Mtr long as Per IS 1239.GI Strip for neutral earthing of size 25 mm x 3 mm for connection of transformer body, G.O Set & lightening arrestor as per IS 2629/85, GI nuts & bolts, refilled with earth enhancement materials and earth Chamber made of brick masonary with RCC slab cover. | 3 | No. | 2,500 ₹7,500 | 4,000 ₹12,000 | 3,000 ₹9,000 | 2,000 ₹6,000 | 1,499 ₹4,497 Lowest | 1,500 ₹4,500 | 2,500 ₹7,500 | 4,496 ₹13,488 | 1,500 ₹4,500 | 2,800 ₹8,400 | 1,500 ₹4,500 | 2,500 ₹7,500 | 1,500 ₹4,500 | 3,500 ₹10,500 | 3,000 ₹9,000 | 5,000 ₹15,000 | 3,000 ₹9,000 | 7,500 ₹22,500 | 2,000 ₹6,000 | 3,000 ₹9,000 | 1,800 ₹5,400 | 2,500 ₹7,500 | 5,000 ₹15,000 |
Tender Value
Refer Docs
EMD Value
₹50,000
Closing Date
20 May 2026, 2:00 pmClosed
Executive Engineer Electric Division-II JPDCL
Executive Engineer Electric Division-II JPDCL
Rate contract for Creation of 25 KVA, 63 KVA and 100KVA Distribution Substations at different locations within the jurisdiction of Electric Division-II Jammu on turnkey basis during the Financial Year 2026-27
2026_PDD_308866_1
e NIT 11 of 2026-27
Open Tender
Electrical Works
Turn-key
15 days
Jammu
Please refer Tender documents.
8 documents required · 8 mandatory
₹1,000
Yes
Executive Engineer Electric Division-II JPDCL
₹50,000
Yes
11 Jun 2026
28 Apr 2026
21 May 2026
28 Apr 2026
20 May 2026
28 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Creation of 11/0.433kV, 25 KVA, 3-phase Distribution Substation | |||||
| 1.01 | Supply, Installation & commissioning of 11/0.433kV, 25 KVA, 3-phase Distribution Transformers with Bimetallic Terminal Connectors Energy Level-2, (Aluminium wound) with LV Cable Box having detachable Aluminium Gland plate. ( As per Latest Ammendment upto date) | 1 | No | 100 | ₹100 |
| 1.02 | Supply, Transportation, Erection of 9 Mtr Long ST Pole (ST-410 SP33) including excavation of pit and back filling of soil & consolidating by ramming, watering etc. Including painting with two coats of Red Oxide and Al. Paint for smooth surface. | 2 | No | 100 | ₹200 |
| 1.03 | Supply, Transportation, Fabrication & Fixing of G.I Channel Iron, Cross arms, Angle Iron Braces, Clamps etc. duly fabricated including all necessary G.I Nut & Bolts & Washers etc. | 250 | Kg | 100 | ₹25,000 |
| 1.04 | Supply, Installation, Testing & Commissioning of 11kV GO, AB Switch 3-Phase, 3-Pole, 200 Amp, Vertical Type | 1 | Set | 100 | ₹100 |
| 1.05 | Supply, Installation, Testing & Commissioning of 11 kV Horn Gap Fuse Set 3 Phase 200A | 1 | Set | 100 | ₹100 |
| 1.06 | Supply & Fixing of Gapless Surge Arrestor,9 kV ,10 kA, LA with polymer housing, Stn. Type | 1 | Set | 100 | ₹100 |
| 1.07 | Providing & fixing of 50 mm² Single-Core Cable,1.1kV Grade, PVC Insulated Stranded Conductor FRLS type along with 12 Nos Al. Thimble of size | 44 | Mtr | 100 | ₹4,400 |
| 1.08 | LT Fuse Switch with Aluminium Strip and Bus Bar insulators | 1 | No | 100 | ₹100 |
| 1.09 | Providing of Earthing of substation --Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 Mtr long as Per IS 1239.GI Strip for neutral earthing of size 25 mm x 3 mm for connection of transformer body, G.O Set & lightening arrestor as per IS 2629/85, GI nuts & bolts, refilled with earth enhancement materials and earth Chamber made of brick masonary with RCC slab cover. | 3 | No. | 100 | ₹300 |
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.30 MB
sbd11.pdf
Tender Documents • 1.21 MB
BOQ_1000445.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .