| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.3 LAdmitted-Finance | ₹7.3 L | L1 | Admitted-Finance |
| 2 | L2₹8.2 LAdmitted-Finance | ₹8.2 L | L2 | Admitted-Finance |
| 3 | L3₹8.3 LAdmitted-Finance | ₹8.3 L | L3 | Admitted-Finance |
| 4 | L4₹8.5 LAdmitted-Finance | ₹8.5 L | L4 | Admitted-Finance |
| 5 | L5₹8.6 LAdmitted-Finance | ₹8.6 L | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | The Trikuta Engineer L12 | M/S HI-TECH ELECTRICAL CONSTRUCTIONS AND SUPPLIERS L14 | R V GROUP L20 | M/S SIGMA CONSTRUCTION L17 | M/S RAJ ELECTRICAL CONTRACTOR L1 | JASMEET SINGH L8 | M/S R. V ENTERPRISES L7 | ASHISH SINGH L6 | M/S PIONEER ENGINEERS L15 | M/S SINGH ELECTRICALS L13 | M/S NEW TRIKUTA TECHNOCRATES L5 | NEW ALLIED TRADERS L3 | M/S SWASTIC ELECTRICAL CONTRACTOR AND SUPPLIERS L9 | M/s MAHASHAKTI ELECTRICAL WORKS L11 | PADMA CONSTRUCTIONS L21 | M/S PARAS ELECTRICAL L23 | M/S APR CONSTRUCTIONS L19 | RAGHBIR SINGH L22 | M/S DAYAL BUILD TECH L16 | VINAYAK ENGINEERS L10 | JAMWAL ELECTRICALS L4 | M/S A A ENTERPRISES L2 | M/S TRANS TECH ENGINEERS L18 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Creation of 11/0.433kV, 25 KVA, 3-phase Distribution Substation | ||||||||||||||||||||||||||
| 1.01 | Supply, Installation & commissioning of 11/0.433kV, 25 KVA, 3-phase Distribution Transformers with Bimetallic Terminal Connectors Energy Level-2, (Aluminium wound) with LV Cable Box having detachable Aluminium Gland plate. ( As per Latest Ammendment upto date) | 1 | No | 1,00,000 ₹1 L | 1,10,000 ₹1.1 L | 1,05,000 ₹1.1 L | 97,000 ₹97,000 | 75,000 ₹75,000 | 1,59,720 ₹1.6 L | 1,05,000 ₹1.1 L | 97,000 ₹97,000 | 1,50,000 ₹1.5 L | 1,00,000 ₹1 L | 90,000 ₹90,000 | 90,000 ₹90,000 | 1,40,000 ₹1.4 L | 97,000 ₹97,000 | 1,06,000 ₹1.1 L | 1,50,000 ₹1.5 L | 1,05,000 ₹1.1 L | 1,20,000 ₹1.2 L | 95,000 ₹95,000 | 1,10,000 ₹1.1 L | 1,15,000 ₹1.1 L | 1,00,000 ₹1 L | 95,000 ₹95,000 |
| 1.02 | Supply, Transportation, Erection of 9 Mtr Long ST Pole (ST-410 SP33) including excavation of pit and back filling of soil & consolidating by ramming, watering etc. Including painting with two coats of Red Oxide and Al. Paint for smooth surface. | 2 | No | 18,000 ₹36,000 | 16,000 ₹32,000 | 18,000 ₹36,000 | 19,500 ₹39,000 | 15,000 ₹30,000 | 15,000 ₹30,000 | 14,000 ₹28,000 | 16,500 ₹33,000 | 18,000 ₹36,000 | 18,000 ₹36,000 | 18,000 ₹36,000 | 18,500 ₹37,000 | 15,000 ₹30,000 | 19,000 ₹38,000 | 18,000 ₹36,000 | 25,000 ₹50,000 | 18,000 ₹36,000 | 18,500 ₹37,000 | 19,500 ₹39,000 | 16,000 ₹32,000 | 19,500 ₹39,000 | 15,000 ₹30,000 | 18,000 ₹36,000 |
| 1.03 | Supply, Transportation, Fabrication & Fixing of G.I Channel Iron, Cross arms, Angle Iron Braces, Clamps etc. duly fabricated including all necessary G.I Nut & Bolts & Washers etc. | 250 | Kg | 140 ₹35,000 | 130 ₹32,500 | 160 ₹40,000 | 150 ₹37,500 | 122 ₹30,500 | 130 ₹32,500 | 122 ₹30,500 | 105 ₹26,250 | 155 ₹38,750 | 150 ₹37,500 | 140 ₹35,000 | 135 ₹33,750 | 150 ₹37,500 | 150 ₹37,500 | 160 ₹40,000 | 160 ₹40,000 | 160 ₹40,000 | 150 ₹37,500 | 150 ₹37,500 | 135 ₹33,750 | 130 ₹32,500 | 125 ₹31,250 | 210 ₹52,500 |
| 1.04 | Supply, Installation, Testing & Commissioning of 11kV GO, AB Switch 3-Phase, 3-Pole, 200 Amp, Vertical Type | 1 | Set | 10,000 ₹10,000 | 11,000 ₹11,000 | 10,000 ₹10,000 | 15,000 ₹15,000 | 8,800 ₹8,800 | 9,000 ₹9,000 | 9,000 ₹9,000 | 10,800 ₹10,800 | 9,900 ₹9,900 | 9,000 ₹9,000 | 10,000 ₹10,000 | 8,500 ₹8,500 | 5,000 ₹5,000 | 9,000 ₹9,000 | 10,000 ₹10,000 | 12,000 ₹12,000 | 10,000 ₹10,000 | 12,000 ₹12,000 | 15,000 ₹15,000 | 10,500 ₹10,500 | 10,600 ₹10,600 | 10,000 ₹10,000 | 14,500 ₹14,500 |
| 1.05 | Supply, Installation, Testing & Commissioning of 11 kV Horn Gap Fuse Set 3 Phase 200A | 1 | Set | 4,000 ₹4,000 | 9,000 ₹9,000 | 6,000 ₹6,000 | 8,000 ₹8,000 | 4,000 ₹4,000 | 3,000 ₹3,000 | 6,500 ₹6,500 | 7,200 ₹7,200 | 6,000 ₹6,000 | 5,000 ₹5,000 | 4,000 ₹4,000 | 4,500 ₹4,500 | 4,500 ₹4,500 | 6,000 ₹6,000 | 6,000 ₹6,000 | 9,000 ₹9,000 | 6,000 ₹6,000 | 7,500 ₹7,500 | 8,000 ₹8,000 | 6,000 ₹6,000 | 4,500 ₹4,500 | 4,000 ₹4,000 | 8,500 ₹8,500 |
| 1.06 | Supply & Fixing of Gapless Surge Arrestor,9 kV ,10 kA, LA with polymer housing, Stn. Type | 1 | Set | 4,000 ₹4,000 | 7,000 ₹7,000 | 6,000 ₹6,000 | 8,000 ₹8,000 | 3,700 ₹3,700 | 6,000 ₹6,000 | 7,500 ₹7,500 | 7,200 ₹7,200 | 5,500 ₹5,500 | 5,000 ₹5,000 | 4,200 ₹4,200 | 4,000 ₹4,000 | 3,500 ₹3,500 | 7,000 ₹7,000 | 6,000 ₹6,000 | 6,500 ₹6,500 | 6,000 ₹6,000 | 10,000 ₹10,000 | 8,000 ₹8,000 | 6,500 ₹6,500 | 7,200 ₹7,200 | 4,000 ₹4,000 | 12,000 ₹12,000 |
| 1.07 | Providing & fixing of 50 mm² Single-Core Cable,1.1kV Grade, PVC Insulated Stranded Conductor FRLS type along with 12 Nos Al. Thimble of size | 44 | Mtr | 100 ₹4,400 | 250 ₹11,000 | 250 ₹11,000 | 300 ₹13,200 | 245 ₹10,780 | 130 ₹5,720 | 185 ₹8,140 | 115 ₹5,060 | 250 ₹11,000 | 350 ₹15,400 | 250 ₹11,000 | 200 ₹8,800 | 100 ₹4,400 | 190 ₹8,360 | 250 ₹11,000 | 200 ₹8,800 | 250 ₹11,000 | 340 ₹14,960 | 300 ₹13,200 | 160 ₹7,040 | 150 ₹6,600 | 100 ₹4,400 | 345 ₹15,180 |
| 1.08 | LT Fuse Switch with Aluminium Strip and Bus Bar insulators | 1 | No | 10,000 ₹10,000 | 25,000 ₹25,000 | 15,000 ₹15,000 | 8,000 ₹8,000 | 6,500 ₹6,500 | 5,000 ₹5,000 | 8,000 ₹8,000 | 18,000 ₹18,000 | 5,000 ₹5,000 | 6,000 ₹6,000 | 5,000 ₹5,000 | 6,350 ₹6,350 | 2,500 ₹2,500 | 9,000 ₹9,000 | 15,000 ₹15,000 | 7,500 ₹7,500 | 15,000 ₹15,000 | 12,000 ₹12,000 | 8,000 ₹8,000 | 6,000 ₹6,000 | 6,500 ₹6,500 | 5,000 ₹5,000 | 6,000 ₹6,000 |
| 1.09 | Providing of Earthing of substation --Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 Mtr long as Per IS 1239.GI Strip for neutral earthing of size 25 mm x 3 mm for connection of transformer body, G.O Set & lightening arrestor as per IS 2629/85, GI nuts & bolts, refilled with earth enhancement materials and earth Chamber made of brick masonary with RCC slab cover. | 3 | No. | 2,500 ₹7,500 | 4,000 ₹12,000 | 3,000 ₹9,000 | 2,000 ₹6,000 | 1,499 ₹4,497 | 1,500 ₹4,500 | 2,500 ₹7,500 | 4,496 ₹13,488 | 1,500 ₹4,500 | 2,800 ₹8,400 | 1,500 ₹4,500 | 2,500 ₹7,500 | 1,500 ₹4,500 | 3,500 ₹10,500 | 3,000 ₹9,000 | 5,000 ₹15,000 | 3,000 ₹9,000 | 7,500 ₹22,500 | 2,000 ₹6,000 | 3,000 ₹9,000 | 1,800 ₹5,400 | 2,500 ₹7,500 | 5,000 ₹15,000 |
Tender Value
Refer Docs
EMD Value
₹50,000
Closing Date
20 May 2026, 2:00 pmClosed
Executive Engineer Electric Division-II JPDCL
Executive Engineer Electric Division-II JPDCL
Rate contract for Creation of 25 KVA, 63 KVA and 100KVA Distribution Substations at different locations within the jurisdiction of Electric Division-II Jammu on turnkey basis during the Financial Year 2026-27
2026_PDD_308866_1
e NIT 11 of 2026-27
Open Tender
Electrical Works
15 days
Jammu
Please refer Tender documents.
8 documents required · 8 mandatory
₹1,000
Yes
Executive Engineer Electric Division-II JPDCL
₹50,000
Yes
11 Jun 2026
28 Apr 2026
21 May 2026
28 Apr 2026
20 May 2026
28 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1Creation of 11/0.433kV, 25 KVA, 3-phase Distribution Substation | ||||||
| 1.01 | Supply, Installation & commissioning of 11/0.433kV, 25 KVA, 3-phase Distribution Transformers with Bimetallic Terminal Connectors Energy Level-2, (Aluminium wound) with LV Cable Box having detachable Aluminium Gland plate. ( As per Latest Ammendment upto date) | 1 | No | 100 | ₹100 | BI01010001010000000000000515BI0100001120 |
| 1.02 | Supply, Transportation, Erection of 9 Mtr Long ST Pole (ST-410 SP33) including excavation of pit and back filling of soil & consolidating by ramming, watering etc. Including painting with two coats of Red Oxide and Al. Paint for smooth surface. | 2 | No | 100 | ₹200 | BI01010001010000000000000515BI0100001125 |
| 1.03 | Supply, Transportation, Fabrication & Fixing of G.I Channel Iron, Cross arms, Angle Iron Braces, Clamps etc. duly fabricated including all necessary G.I Nut & Bolts & Washers etc. | 250 | Kg | 100 | ₹25,000 | BI01010001010000000000000515BI0100001121 |
| 1.04 | Supply, Installation, Testing & Commissioning of 11kV GO, AB Switch 3-Phase, 3-Pole, 200 Amp, Vertical Type | 1 | Set | 100 | ₹100 | BI01010001010000000000000515BI0100001122 |
| 1.05 | Supply, Installation, Testing & Commissioning of 11 kV Horn Gap Fuse Set 3 Phase 200A | 1 | Set | 100 | ₹100 | BI01010001010000000000000515BI0100001123 |
| 1.06 | Supply & Fixing of Gapless Surge Arrestor,9 kV ,10 kA, LA with polymer housing, Stn. Type | 1 | Set | 100 | ₹100 | BI01010001010000000000000515BI0100001124 |
| 1.07 | Providing & fixing of 50 mm² Single-Core Cable,1.1kV Grade, PVC Insulated Stranded Conductor FRLS type along with 12 Nos Al. Thimble of size | 44 | Mtr | 100 | ₹4,400 | BI01010001010000000000000515BI0100001126 |
| 1.08 | LT Fuse Switch with Aluminium Strip and Bus Bar insulators | 1 | No | 100 | ₹100 | BI01010001010000000000000515BI0100001127 |
| 1.09 | Providing of Earthing of substation --Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 Mtr long as Per IS 1239.GI Strip for neutral earthing of size 25 mm x 3 mm for connection of transformer body, G.O Set & lightening arrestor as per IS 2629/85, GI nuts & bolts, refilled with earth enhancement materials and earth Chamber made of brick masonary with RCC slab cover. | 3 | No. | 100 | ₹300 | BI01010001010000000000000515BI0100001128 |
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.30 MB
sbd11.pdf
Tender Documents • 1.21 MB
BOQ_1000445.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid