| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹30.7 CrAccepted-AOC H NO 30 SECTOR 17 PANCHKULA 2022R6473 | PANCHKULA | PANCHKULA | HARYANA | 2022 | ₹30.7 Cr Quoted ₹31.7 Cr | L-1 | Accepted-AOC L-1 |
| 2 | L-2₹36.7 Cr+₹5.0 Cr (15.9%)Rejected-AOC RG METRO ARCADE SECTOR 11 ROHINI DELHI 110085 | DELHI | NORTH WEST DELHI | DELHI | 110085 | ₹36.7 Cr+₹5.0 Cr (15.9%) | L-2 | Rejected-AOC L-2 |
| Sl No | Description | Qty | Unit | HL HANDA AND CO L1 | ENVIRO INFRA ENGINEERS LIMITED L2 |
|---|---|---|---|---|---|
| 1.00 | Design, upgradation, construction, erection, testing and commissioning of existing 67.5 MLD capacity Main Pumping Station including renovation and upgradation of existing 15MLD Capacity Sewage Treatment Plant based on Extended Aeration Process to 30MLD STP with Tertiary Treatment to 30MLD capacity Activated Sludge Process with Tertiary Treatment complete in all respect including, Primary clarifiers, Combined/ Primary sludge sump, providing of Anoxic chamber with Mechanical Mixers, Repair and Upgradation of existing Aeration basins with replacement of diffused aeration system with Air blowers or Aspirators, existing clarifiers repair and mechanical equipment`s replacement, providing of another additional clarifier, Anaerobic Sludge Digesters, Organic scrubber, Biological Scrubber for removal of H2S, Gas Holding Tanks with tertiary treatment including Equalization tank, Flash mixer, Coagulation, Flocculator, Inclined Tube Settlers, Deep bed Rapid gravity filtration and Gaseous chlorination, including Transformer, CCTV Cameras including Civil works with Buildings at Sewage Treatment Plan Sec-28, Panchkula. | 1 | Complete Job | 12,50,00,000 ₹12,50,00,000 Lowest | 14,90,00,000 ₹14,90,00,000 |
| 2.00 | Design, upgradation, construction, erection, testing and commissioning of existing 67.5 MLD capacity Main Pumping Station including renovation and upgradation of existing 15MLD Capacity Sewage Treatment Plant based on Extended Aeration Process to 30MLD STP with Tertiary Treatment to 30MLD capacity Activated Sludge Process with Tertiary Treatment complete in all respect including, Primary clarifiers, Combined/ Primary sludge sump, providing of Anoxic chamber with Mechanical Mixers, Repair and Upgradation of existing Aeration basins with replacement of diffused aeration system with Air blowers or Aspirators, existing clarifiers repair and mechanical equipment`s replacement, providing of another additional clarifier, Anaerobic Sludge Digesters, Organic scrubber, Biological Scrubber for removal of H2S, Gas Holding Tanks with tertiary treatment including Equalization tank, Flash mixer, Coagulation, Flocculator, Inclined Tube Settlers, Deep bed Rapid gravity filtration and Gaseous chlorination, including Transformer, CCTV Cameras, Electrical, Mechanical, Piping and Instrumentation Works at Sector - 28, Panchkula`. | 1 | Complete Job | 18,70,00,000 ₹18,70,00,000 Lowest | 21,10,00,000 ₹21,10,00,000 |
| 3.00 | Road, 3.75M wide (M2) – 1905mtr. | 1 | Complete Job | 45,00,000 ₹45,00,000 Lowest | 70,00,000 ₹70,00,000 |
| 4.00 | Operation and Maintenance for 5 years including 12 months defect liability period and 3 months trial run period. | 1 | Complete Job | 1,50,000 ₹1,50,000 Lowest | 1,50,000 ₹1,50,000 Lowest |
Tender Value
₹31.8 Cr
EMD Value
₹63.5 L
Closing Date
23 Dec 2025, 12:00 pmClosed
Narender Kumar Payal
Construction Division-II
Design, upgradation, construction, erection, testing and commissioning of existing 67.5 MLD capacity Main Pumping Station including renovation and upgradation of existing 15MLD Capacity Sewage Treatment Plant based on Extended Aeration Process to 30M
2025_HRY_485511_1
2025AF2AA1F7 4CE4 4C65 94B2 2BD18F188D812239003
Open Tender
Civil Works
Works
920 days
Panchkula
2 documents required · 2 mandatory
₹10,000
₹63.5 L
Yes
Chief Engineer, PMDA Panchkula
29 Jul 2026
26 Nov 2025
23 Dec 2025
26 Nov 2025
23 Dec 2025
26 Nov 2025
10 Dec 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Design, upgradation, construction, erection, testing and commissioning of existing 67.5 MLD capacity Main Pumping Station including renovation and upgradation of existing 15MLD Capacity Sewage Treatment Plant based on Extended Aeration Process to 30MLD STP with Tertiary Treatment to 30MLD capacity Activated Sludge Process with Tertiary Treatment complete in all respect including, Primary clarifiers, Combined/ Primary sludge sump, providing of Anoxic chamber with Mechanical Mixers, Repair and Upgradation of existing Aeration basins with replacement of diffused aeration system with Air blowers or Aspirators, existing clarifiers repair and mechanical equipment`s replacement, providing of another additional clarifier, Anaerobic Sludge Digesters, Organic scrubber, Biological Scrubber for removal of H2S, Gas Holding Tanks with tertiary treatment including Equalization tank, Flash mixer, Coagulation, Flocculator, Inclined Tube Settlers, Deep bed Rapid gravity filtration and Gaseous chlorination, including Transformer, CCTV Cameras including Civil works with Buildings at Sewage Treatment Plan Sec-28, Panchkula. | - | Complete Job | 1.25 | - |
| 2 | Design, upgradation, construction, erection, testing and commissioning of existing 67.5 MLD capacity Main Pumping Station including renovation and upgradation of existing 15MLD Capacity Sewage Treatment Plant based on Extended Aeration Process to 30MLD STP with Tertiary Treatment to 30MLD capacity Activated Sludge Process with Tertiary Treatment complete in all respect including, Primary clarifiers, Combined/ Primary sludge sump, providing of Anoxic chamber with Mechanical Mixers, Repair and Upgradation of existing Aeration basins with replacement of diffused aeration system with Air blowers or Aspirators, existing clarifiers repair and mechanical equipment`s replacement, providing of another additional clarifier, Anaerobic Sludge Digesters, Organic scrubber, Biological Scrubber for removal of H2S, Gas Holding Tanks with tertiary treatment including Equalization tank, Flash mixer, Coagulation, Flocculator, Inclined Tube Settlers, Deep bed Rapid gravity filtration and Gaseous chlorination, including Transformer, CCTV Cameras, Electrical, Mechanical, Piping and Instrumentation Works at Sector - 28, Panchkula`. | - | Complete Job | - | - |
| 3 | Road, 3.75M wide (M2) – 1905mtr. | - | Complete Job | 100 | - |
| 4 | Operation and Maintenance for 5 years including 12 months defect liability period and 3 months trial run period. | - | Complete Job | 53 | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 9.57 MB
BOQ_563545.xls
BOQ • 0.29 MB
485511.pdf
PDF • 0.55 MB
485511.pdf
PDF • 0.46 MB
2025_HRY_485511_1.pdf
PDF • 2.21 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .