| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.0 LAccepted-AOC FLAT NO 7 MHAMBRE BLDG DR FRANCISCO LUIS GOMES ROAD VASCO DA GAMA GOA 403 802 | SOUTH GOA | GOA | 403802 | L1 | Accepted-AOC LOWEST BIDDER | |
| 2 | L2₹31.1 L+₹12.1 L (63.6%)Rejected-Finance | L2 | Rejected-Finance HIGHER BIDDER | |
| 3 | L3₹40.7 L+₹21.7 L (114.4%)Rejected-Finance | L3 | Rejected-Finance HIGHER BIDDER | |
| 4 | L4₹43.6 L+₹24.6 L (129.3%)Rejected-Finance | L4 | Rejected-Finance HIGHER BIDDER | |
| 5 | Rejected-Technical | - | Rejected-Technical Does not meet enlistment Criteria of required category |
Tender Value
₹45 L
EMD Value
₹90,000
Closing Date
11 Aug 2020, 6:00 pmClosed
SHRI JANAK RAJ EE GARRISON ENGINEER NW
GARRISON ENGINEER (NW) VASCO Opposite KV No.2, School, Shantinagar, Vasco-Da-Gama, Goa-403802.
8283/E8
2020_MES_349948_1
8283/E8
Open Tender
Civil Works
Item Rate
364 days
VASCO
Class D Category a i
8 documents required · 8 mandatory
₹500
Yes
GE NW VASCO
₹90,000
Yes
22 Sept 2020
4 Jun 2020
13 Aug 2020
4 Jun 2020
11 Aug 2020
18 Jun 2020
5 Jun 2020 - 17 Jun 2020
Amount
M & L preperation of old painted bituminous / concrete, flexible or rigid surfaces over 10 cm width and applying one coat of runway marking paint water based (white/golden yellow) to lines, dashes arrows, letters etc with necessary painting rollers, all as specified and directed. (Make - Asian, Shalimar, Johnson & Nicolson or equivalent) Note : (a) Painting will be carried out twice in a year (5-6 months interval) or and when required basis (b) Runway full center line painting will be regularly carried out by monthly or and as when required basis as relevent schedule given below. (c) Painting will be carried out by using water base road marking painting machine.
All as per item No.1.00 above, Second time painting for the same location above for centre line touch down area only, 14 days gap after first time painting or as and when required basis.
All as per item No.1.00 above, Third time painting for the same location above for full centre line only, 14 days gap after second time painting or as and when required basis.
All as per item No.1.00 above, Fourth time painting for the same location above for centre line touch down area only, 14 days gap after third time painting or as and when required basis.
All as per item No.1.00 above, Fifth time painting for the same location above for full centre line only, 14 days after fourth time painting or as and when required basis.
All as per item No.1.00 above, Sixth time painting for the same location above for centre line touch down area only, 14 days gap after fifth time painting or as and when required basis.
All as per item No.1.00 above, Seventh time painting for the same location above for full centre line only, 14 days gap after sixth time painting or as and when required basis.
All as per item No.1.00 above, Eighth time painting for the same location above for centre line touch down area only, 14 days gap after seventh time painting or as and when required basis.
All as per item No.1.00 above, Nineth time painting for the same location above for full centre line only, 14 days after eighth time painting or as and when required basis.
All as per item No.1.00 above, Tenth time painting for the same location above for centre line touch down area only, 14 days after nineth time painting or as and when required basis.
All as per item No.1.00 above, Eleventh time painting for the same location above for full centre line only, 14 days after tenth time painting or as and when required basis.
All as per item No.1.00 above, Twelveth time painting for the same location above for centre line touch down area only, 14 days after eleventh time painting or as and when required basis.
All as per item No. 1.00 above, Thirteenth time painting for the same location above for full centre line only, 14 days after Twelveth time painting or as and when required basis.
All as per item No. 1.00 above, Fourteenth time painting for the same location above for centre line touch down area only, 14 days after Thirteenth time painting or as and when required basis.
All as per item No.1.00 above, Fifteenth time painting for the same location above for full centre line only, 14 days after Fourteenth time painting or as and when required basis.
All as per item No.1.00 above, Sixteenth time painting for the same location above for centre line touch down area only, 14 days after Fifteenth time painting or as and when required basis.
All as per item No.1.00 above, Seventeenth time painting for the same location above for full centre line only, 14 days after Sixteenth time painting or as and when required basis.
All as per item No.1.00 above, Eighteenth time painting for the same location above for centre line touch down area only, 14 days after Seventeenth time painting or as and when required basis.
All as per item No.1.00 above, nineteenth time painting for the same location above for full centre line only, 14 days after Eighteenth time painting or as and when required basis.
All as per item No.1.00 above, Twentieth time painting for the same location above for centre line touch down area only, 14 days after nineteenth time painting or as and when required basis.
All as per item No.1.00 above, Twenty-first time painting for the same location above for full centre line only, 14 days after twentieth time painting or as and when required basis.
All as per item No.1.00 above, Twenty-second time painting for the same location above for centre line touch down area only, 14 days after Twenty-first time painting or as and when required basis.
Preparation of old painted concrete flexible or rigid surface exc 10 cm width and applying one coat of synthetic enamel paint First quality including side black strip 1 inch wide on both sides where required and as per user requirement all as specified and as directed
S S Engineering Works
greenstone construction
M/S. M M S ENTERPRISES
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .