Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹6.7 LAdmitted-Finance JANTA COLONY BASNI FIRST PHASE JODHPUR JODHPUR RAJASTHAN 342001 | JODHPUR | RAJASTHAN | 342001 | -2.21% | ₹6.7 L | L1 | Admitted-Finance |
Tender Value
₹6.8 L
EMD Value
₹13,680
Closing Date
18 Feb 2026, 6:00 pmClosed
SPD RCScE, Jaipur
Rajasthan Council of school education Jaipur
(115) Major repair work State Budget Head GUPS Indra Colony Block Pali
2026_RCSCE_536280_58
Nit 15 civil 2025-26
Open Tender
Civil Works - Buildings
Pali
Please refer bid document
7 documents required · 7 mandatory
₹1,000
ADPC SMSA PALI/ MD RISL JAIPUR/ EGrass PD A/C 6429
₹13,680
25 Mar 2026
9 Feb 2026
19 Feb 2026
9 Feb 2026
18 Feb 2026
9 Feb 2026
Dismantling stone slab/ terrazo chip flooring laid in cement mortar including stacking of serviceable material and disposal of unserviceable material within 50 meters lead.
Grading roof water proofing treatment with : Cement concrete 1:2:4 (1-Cement:2-coarse sand :4-graded stone aggregate 20mm nominal size).
Providing batta (gola) 75mm x 75mm in cement concrete (1:2:4) including finished with cement mortar 1:3 as per standard design.
Providing and laying in position cement concrete including curing compaction etc. of specified grade excluding the cost of centering and shuttering =All up to plinth level 1:3:6 (1Cement :3 Course Sand :6 Graded stone aggregate 40 mm nominal size
Polished Blue Kota Stone flooring skirting, laid over 20 mm thick base of C.M. 1:4 and jointed with grey cement slurry to match the shade of the slab including rubbing and polishing complete : For area of each slab up to 2001 to 5000 Sq. Cm : 25 mm thick slab.
Polished Blue Kota Stone flooring skirting, laid over 20 mm thick base of C.M. 1:4 and jointed with grey cement slurry to match the shade of the slab including rubbing and polishing complete : For area of each slab up to 901 to 2000 Sq. Cm : 25 mm thick slab.
Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade including all scaffolding: New work (two or more coats) over and including scrapping and priming coat with cement primer.
Painting with enamel paint of approved brand and manufacture to give an even shade: Two or more coats on new work.
Proving & laying broken glazed tiles on roof ( broken glazed tiles not less than 9 kg/sqm) on top of hot bitumen @ 1.7 kg/sqm. (1.40 kg of VG-40 (30/40) grade and 0.30 kg/sqm of VG-10 (80/100) grade) and joints filled with cement mortar 1 : 2 (1 cement : 2 marble dust mixed with water proofing compund all complete as per direction of engineerin-charge.
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
technical_955578.pdf
techsummary_955578.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 13.97 MB
Tendernotice_2.pdf
PDF • 0.53 MB
Tendernotice_3.pdf
PDF • 0.15 MB
Tendernotice_4.pdf
PDF • 0.42 MB
Tendernotice_5.pdf
PDF • 9.64 MB
BOQ_955578.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid