Tender Value
₹53.4 Cr
EMD Value
₹1.1 Cr
Closing Date
22 Aug 2026, 2:00 pm
Yes (up to 3 members)
No
Two Packet System
Two Stage Reverse Auction
Yes
12/08/2026 11:00
Lowest to Highest
90 days
Expenditure
Station Development
DEN W
29 conditions · 3 needing a document upload
The tenderer must have minimum average annual contractual turnover of 'V/N' or 'V'; whichever is less, where 'V'= Advertised value of the tender in crores of Rupees and 'N'= Number of years prescribed for completion of work for which bids have been invited.
The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover.
The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
The JV shall satisfy the requirement of "Financial Eligibility" mentioned above. The "financial capacity" of the lead member of JV shall not be less than 51% of the financial eligibility criteria mentioned above. The arithmetic sum of individual "financial capacity" of all the members shall be taken as JV's "financial capacity" to satisfy this requirement. Note: Contractual payment received by a Member in an earlier JV shall be reckoned only to the extent of the concerned member's share in that JV for the purpose of satisfying compliance of the above mentioned financial eligibility criteria in the tender under consideration.
The balance sheet and all other financial documents attested/certified by CAs to substantiate fulfilment of Financial Eligibility Criteria should be with UDIN, failing which the offer is likely to be rejected without any further notice.
The tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i) Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or (ii) Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or (iii) One similar work costing not less than the amount equal to 60% of advertised value of the tender.
In case of tenders for composite works (e.g. worksinvolving more than one distinct component, such as CivilEngineering works, S&T works, Electrical works, OHE worksetc. and in the case of major bridges - substructure,superstructure etc.), tenderer must have successfullycompleted or substantially completed any one of thefollowing categories of work(s) during last 07 (seven)years, ending last day of month previous to the one inwhich tender is invited: (i) Three similar works each costingnot less than the amount equal to 30% of advertised valueof each component of tender, or (ii) Two similar works eachcosting not less than the amount equal to 40% ofadvertised value of each component of tender, or (iii) Onesimilar work each costing not less than the amount equal to60% of advertised value of each component of tender. Notefor : Separate completed works of minimum requiredvalues shall also be considered for fulfillment of technicaleligibility criteria for different components. In such cases,what constitutes a component in a composite work shall beclearly pre-defined with estimated tender cost of it, as partof the tender documents without any ambiguity.
To evaluate the technical eligibility of tenderer, only components of work as stipulated in tender documents for evaluation of technical eligibility, shall be considered. The scope of work covered in other remaining components shall be either executed by tenderer himself if he has work experience as mentioned in clause 7 of the Standard General Conditions of Contractor through subcontractor fulfilling the requirements as per clause 7 of the Standard General Conditions of Contract or jointly i.e., partly himself and remaining through subcontractor, with prior approval of Chief Engineer in writing. However, if required in tender documents by way of Special Conditions, a formal agreement duly notarised, legally enforceable in the court of law, shall be executed by the main contractor with the subcontractor for the component(s) of work proposed to be executed by the subcontractor(s), and shall be submitted along with the 1.1.1 offer for considering subletting of that scope of work towards fulfilment of technical eligibility. Such subcontractor must fulfill technical eligibility criteria as follows: The subcontractor shall have successfully completed at least one work similar to work proposed for subcontract, costing not less than 35% value of work to be subletted, in last 5 years, ending last day of month previous to the one in which tender is invited through a works contract. Note: for subletting of work costing up to Rs 50 lakh, no previous work experience of subcontractor shall be asked for by the Railway. In case after award of contract or during execution of work it becomes necessary for contractor to change subcontractor, the same shall be done with subcontractor(s) fulfilling the requirements as per clause 7 of the Standard General Conditions of Contract, with prior approval of Chief Engineer in writing.
Note : Work experience certificate from private individualshall not be considered. However, in addition to workexperience certificates issued by any Govt. Organisation,work experience certificate issued by Public listed companyhaving average annual turnover of Rs 500 crore and abovein last 3 financial years excluding the current financial year,listed on National Stock Exchange or Bombay StockExchange, incorporated/registered at least 5 years prior tothe date of closing of tender, shall also be consideredprovided the work experience certificate 1.1.2 has been issued bya person authorized by the Public listed company to issue such certificates. In case tenderer submits work experiencecertificate issued by public listed company, the tenderershall also submit along with work experience certificate,the relevant copy of work order, bill of quantities, bill wisedetails of payment received duly certified by CharteredAccountant, TDS certificates for all payments received andcopy of final/last bill paid by company in support of abovework experience certificate.
Explanation for Eligibility criteria:
1] Substantially Completed Work means an ongoing work in which payment equal to or more than 90% of the present contract value (excluding the payment made for adjustment of Price variation (PVC), if any) has been made to the contractor in that ongoing contract and no proceedings of termination of contract on Contractor's default has been initiated. The credential certificate in this regard should have been issued not prior to 60 days of date of invitation of present tender. [2] In case a work is started prior to 07 (seven) years, ending last day of month previous to the one in which tender is invited, but completed in last 07 (seven) years, ending last day of month previous to the one in which tender is invited, the completed work shall be considered for fulfillment of credentials. [3] If a work is physically completed and completion certificate to this extent is issued by the concerned organization but final bill is pending, such work shall be considered for fulfillment of credentials. [4] In case of completed work, the value of final bill (gross amount) including the PVC amount (if paid) shall be considered 1.2.1 as the completion cost of work. In case final bill is pending, only the total gross amount already paid including the PVC amount (if paid) shall be considered as the completion cost of work. In case of substantially completed work, the total gross amount already paid including the PVC amount (if paid), as mentioned in the certificate, shall be considered as the cost of substantially completed work. [5] If a bidder has successfully completed a work as subcontractor and the work experience certificate has been issued for such work to the subcontractor by a Govt. Organization or public listed company as defined in Note for Item 10.1 Para 10 of the Tender Form (Second Sheet), the same shall be considered for the purpose of fulfillment of credentials. [6] In case a work is considered similar in nature for fulfillment of technical credentials, the overall cost including the PVC amount (if paid) of that completed work or substantially completed work, shall be considered and no separate evaluation for each component of that work shall be made to decide eligibility.
[7] In case of newly formed partnership firm, the credentials of individual partners from previous propriety firm(s) or dissolved previous partnership firm(s) or split previous partnership firm(s), shall be considered only to the extent of their share in previous entity on the date of dissolution / split and their share in newly formed partnership firm. For example, a partner A had 30% share in previous entity and his share in present partnership firm is 20%. In the present tender under consideration, the credentials of partner A will be considered to the extent of 0.3*0.2*value of the work done in the previous entity. For this purpose, the tenderer shall submit along with his bid all the relevant documents which include copy of previous partnership deed(s), dissolution deed(s) and proof of surrender of PAN No.(s) in case of dissolution of partnership firm(s) etc. [8] In case of existing partnership firm, if any one or more partners quit the partnership firm, the credentials of remaining partnership firm shall be re-worked out i.e., the quitting partner(s) shall take away his credentials to the extent of his share on 1.2.2 the date of quitting the partnership firm (e.g. in a partnership firm of partners A, B & C having share 30%, 30% & 40% respectively and credentials of Rs 10 crore; in case partner C quits the firm, the credentials of this partnership firm shall remain as Rs 6 crore). For this purpose, the tenderer shall submit along with his bid all the relevant documents which include copy of previous partnership deed(s), dissolution deed(s) and proof of surrender of PAN No.(s) in case of dissolution of partnership firm(s) etc. [9] In case of existing partnership firm if any new partner(s) joins the firm without any modification in the name and PAN/TAN no. of the firm, the credentials of partnership firm shall get enhanced to the extent of credentials of newly added partner(s) on the same principles as mentioned in item 6 above. For this purpose, the tenderer shall submit along with his bid all the relevant documents which include copy of previous partnership deeds, dissolution/splitting deeds and proof of surrender of PAN No.(s) in case of dissolution of partnership firm etc.
[10] Any partner in a partnership firm cannot use or claim his credentials in any other firm without leaving the partnership firm i.e., In a partnership firm of A&B partners, A or B partner cannot use credentials of partnership firm of A&B partners in any other partnership firm or propriety firm without leaving partnership firm of A&B partners. [11] In case a partner in a partnership firm is replaced due to succession as per succession law, the proportion of credentials of the previous partner will be passed on to the successor. [12] If the percentage share among partners of a partnership firm is changed, but the partners remain the same, the credentials of the firm before such modification in the share will continue to be considered for the firm as it is without any change in 1.2.3 their value. Further, in case a partner of partnership firm retires without taking away any credentials from the firm, the credentials of partnership firm shall remain the same as it is without any change in their value. [13] In a partnership firm "AB" of A&B partners, in case A also works as propriety firm "P" or partner in some other partnership firm "AX", credentials of A in propriety firm "P" or in other partnership firm "AX" earned after the date of becoming a partner of the firm AB shall not be added in partnership firm AB. [14] In case a tenderer is LLP, the credentials of tenderer shall be worked out on above lines similar to a partnership firm. [15] In case company A is merged with company B, then company B would get the credentials of company A also.]
Technical Eligibility Criteria of JV ('a' or 'b' mentioned hereunder):
(a) For Works without composite components : The technical eligibility for the work as per para 10.1 above, shall be satisfied by either the 'JV in its own name & style' or 'Lead member of the JV'. Each other (non-lead) member(s) of JV, who is/ are not satisfying the technical eligibility for the work as per para 10.1 above, shall have technical capacity of minimum 1.3.1 10% of the cost of work i.e., each non-lead member of JV member must have satisfactorily completed or substantially completed during the last 07 (seven) years, ending last day of month previous to the one in which tender is invited, one similar single work for a minimum of 10% of advertised value of the tender.
(b) For works with composite components : The technical eligibility for major component of work as per para 10.1 above, shall be satisfied by either the 'JV in its own name & style' or 'Lead member of the JV' and technical eligibility for other component(s) of work as per para 10.1 above, shall be satisfied by either the 'JV in its own name & style' or 'any member of the JV'. Each other (non-lead)member(s) of JV, who is/ are not satisfying the technical eligibility for any component of the work as per 1.3.2 para 10.1 above, shall have technical capacity of minimum 10% of the cost of any component of work mentioned in technical eligibility criteria. i.e., each other (nonlead) member of must have satisfactorily completed or substantially completed during the last 07 (seven) years, ending last day of month previous to the one in which tender is invited, one similar single work for a minimum of 10% of cost of any component of work mentioned in technical eligibility criteria.
Note : a) The Major component of the work for this purpose shall be the component of work having highest value. In cases where value of two or more component of work is same, any one work can be classified as Major component of work. b) Value of a completed work done by a 1.3.3 Member in an earlier JV shall be reckoned only to the extent of the concerned member's share in that JV for the purpose of satisfying his/her compliance to the above mentioned technical eligibility criteria in the tender under consideration.
Defination of Similar Work :- Execution of P.Way works on running line.
54 conditions · 1 needing a document upload
Compliance with the GST Act, 2017 - Change in para (a) of clause 6, part I of Indian Railway Standard General Conditions of Contract, April'2022.
Before submitting a tender, the tenderer will be deemed to have satisfied himself by actual inspection of the site and locality of the works, that all conditions liable to be encountered during the execution of the works are taken into account and that the rates he enters in the tender forms are adequate and all inclusive to accord with the provisions in Clause-37 of the Standard General Conditions of Contract for the completion of works to the entire satisfaction of the Engineer.
Tenderers will examine the various provisions of The Central Goods and Services Tax Act, 2017(CGST)/ Integrated Goods and Services Tax Act, 2017(IGST)/ Union Territory Goods and Services Tax Act, 2017(UTGST)/ respective state's State Goods and Services Tax Act (SGST) also, as notified by Central/State Govt.& as amended from time to time and applicable taxes before bidding. Tenderers will ensure that full benefit of Input Tax Credit (ITC) likely to be availed by them is duly considered while quoting rates.
The successful tenderer who is liable to be registered under CGST/IGST/UTGST/SGST Act shall submit GSTIN along with other details required under CGST/IGST/UTGST/SGST Act to railway immediately after the award of contract, without which no payment shall be released to the Contractor. The Contractor shall be responsible for deposition of applicable GST to the concerned authority.
In case the successful tenderer is not liable to be registered under CGST/IGST/UTGST/ SGST Act, the railway shall deduct the applicable GST from his/their bills under reverse charge mechanism (RCM) and deposit the same to the concerned authority.
Contractor shall be liable to pay/refund the amount collected as GST to the Indian Railways along with interest and penalties, if any imposed by the authorities, in case GST input tax credit of Indian Railways is denied/rejected by the tax authortties due to reasons mentioned below but not limited to: Wrong/incorrect invoices issued by Contractor ; No-filing of GST returns; Non- payment of GST collected from Indian Railways to the authorities; Any other non-compliance done by Contractor; General Indemnity: Contractor hereby agrees to indemnify and hold harmless the Indian Railways from and against any and all losses, including loss on account of Input Tax Credit and all losses incurred by the Indian Railways relating to or arising out of or in connection with any actual or threatened claim, legal action, proceedings, prosecution or inquiry by or against the Indian Railways arising out, directly or indirectly, of failure by the contractor to comply with the provisions of GST and related laws, or based upon or arising from any failure by the Contractor. Retention Money: Any payment liable to be paid by Indian Railways to contractor against the goods or services or both supplied by such contractor to Indian Railways shall be kept on hold in case supplier makes any non-compliance of any of the GST law provisions including non-reporting of invoices in GST returns. Such payment shall be released after proper verification of records and availability of ITC to Indian Railways as per provisions of GST Law.
Expenditure will be chargeable to Estimate No. (1)49/W/KGP/2026, Allocation-CAP, PH-16, Project ID- 12.03.16.25.3.52.006 (RS. 7,13,01,354.00) (2)128/W/KGP/2026, Allocation-CAP, PH-16, Project ID- 12.03.16.25.3.52.008 (RS. 8,61,58,585.78) and (3)196/W/KGP/2026, Allocation-CAP, PH-16, Project ID- 12.03.16.26.3.52.001 (Remaining amount).
All the bidders / tenderers should ensure that they are GST compliant and their quoted rates are as per GST law.
Tender value is inclusive of GST. Agencies must quote their rates including GST.
In the instant tender GST is applicable at rate of Eighteen percent (18%) in Schedule A to E & G and Five percent (5%) in Schedule F.
However, inter se ranking will be done on the quoted value including GST applicable on the date of opening.
In case of increase or decrease in GST rate, same will be either paid by railway or recovered from the agency as the case may be.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
In case damage is caused to OFC / Quad cable / signaling cable during execution of the work, the contractor is liable to pay a penalty for damaging the cable. Penalty shall not be levied in case of the following: (i) Detailed cable route plan not provided by concerned department or cable is not protected as per laid down procedures, (ii) The alignment of the cable does not tally with the information provided to the contractor, (iii) The cable depth is found to be less than 800 mm from normal ground level, (iv) No representative of S&T department / Rail Tel was available at site guarding the cables on the fixed pre determined date and time. Penalty to be imposed for damages to cable shall be as under: (a) Only Quad cable or Signaling cable ----- Rs.1.00 Lakh per location, (b) Only OFC ----- Rs.1.25 Lakh per location, (c) Both OFC & Quad ----- Rs.1.50 Lakh per location, (d) Electrical Cable ----- Rs.1.00 Lakh per location. (Telecom Circular No. 09/2023 issued by Railway Board vide No. 2024/CE-I/CAO(C) Workshop/part-2 dated 03.06.2024 is binding to this contract and should be followed in spirit).
One Graduate Engineer and One qualified surveyor must be deputed exclusively for this contract and they must not be engaged to supervise any other work.
If necessary, the contractor has to make the detail drawing of the work and has to made it approved by a Govt. College/University/Institution. No extra payment will be admissible on this account.
The items covered under CPWD DSR-2021 / 2023, CPWD Horticulture-2020 and SER-IR-USSOR-2021 are tentative and approximate and these are considered for evaluation of DV only. However the items covered under CPWD DSR-2021 / 2023, CPWD Horticulture-2020 and SER-IR-USSOR-2021 may be altered within the scope of work as per instruction of Engineer- in Charge according to site requirement if required. Decision of Engineer in Charge in this regard will be final and binding to all.
All P.Way and Civil contractors that all labours engaged on any work on track and civil construction site must be equipped with all necessary safety equipment like green retro reflective safety jacket, safety helmet and safety shoe, harness etc. as per direction of Engineer-in-charge or his authorize representative at site all the times without fail.
No compensation towards any accident what - so - ever will be paid by the Railway.
EXTRA SPECIAL CONDITION FOR ROAD WORKS
The road works shall have to be done with hard stone ballast or chips of approved quality of chandil/pakur/nilgiri variety only.
The work is to be done with all contractors labour and materials including tar, bitumen, boulders, ballast, chips, power driven road roller of 10 tonne capacity and other equipments.
The maintenance period of the above work for a period of Thirty six months from the date of completion and security deposit will only be released after successful completion of the maintenance period.
The road that will be repaired against this contract shall have to be maintenance for a period of Thirty six months from the certified date of completion by the contractors free of cost.Rectification works if any are to be attended within 15 days from the date of issue of notice in this regard. In the event of failure on the part of contractor to comply with the stipulation mentioned above,the damaged portion of the road will be repaired by the Railway and cost of the same will be deducted from the contractors dues without any further notice.
Stone materials of different categories shall have to be stack separately and the mixing of the proportioning of the same is to be done in the presence of Railways representative at site.
No mixing of hot iron plate will be allowed and variation of the same will lead to overall rejection of the concerned item of the work.
Strict Implementation of Labour Law Provisions for Employees and Contract Labour will be as per Railway Board's letter No. .2026/E(LL)/AT/CNRIS dated 11.05.2026.
In terms of the Railway Board's letter No. 2025/Stn.Dev.-I/08/18 dated 08.03.2025, checklists for safety and quality measures at work sites across Indian Railways will be strictly implemented. (Copy Attached)
IF required, contractor should mobillse to do night working for which they will be required to have their own sufficient lighting arrangement. No extra payment will be admissible on this account.
The Contractor with the help of his Engineer or Diploma holder , as the case be , shall make necessary Drawings, sketches, plotting, peg markings etc. as desired by the Engineer-in-charge. No extra cost shall be claimed on this account.
The quantities specified in the tender schedule are only approximate and liable to vary.
Execution of the work:- (1) Nimpura Yard - Additional line between line No. 18 of NMP Reception Yard and New Clinker siding, (2) Construction of 4 numbers of lines between line No. 6 and 7 of NMP Classification Yard and (3) Kharagpur-Tatanagar: Provision of 06 Nos. of stabling lines at NMP R.Yard of KGP Division, under the jurisdiction of ADEN/West/KGP.
E-KGP-WEST-33-2026
E-KGP-WEST-33-2026
Open
Works - General
12 Months
Paschim Medinipur, West Bengal
₹0
₹1.1 Cr
31 Jul 2026
31 Jul 2026
8 Aug 2026
12 Aug 2026
299 items across 7 schedules · ₹39,34,78,548.9 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| EARTH WORK | — | — | — | — | |
| General | — | — | — | — | |
| Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. | — | — | — | — | |
| 1 | All kinds of soil | cum | 13155 | 177.5 | 23,35,012.5 |
| 2 | Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. | cum | 5864 | 700.5 | 41,07,732 |
| 3 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | cum | 1395 | 2,123.75 | 29,62,631.25 |
| Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m. | — | — | — | — | |
| 4 | All kinds of soil | Sqm | 150 | 34.15 | 5,122.5 |
| CONCRETE WORK | — | — | — | — | |
| CEMENT CONCRETE (CAST IN SITU) | — | — | — | — | |
| Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : | — | — | — | — | |
| 5 | 1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources: 4 graded stone aggregate 40 mm nominal size derived from natural sources) | cum | 970 | 7,780.3 | 75,46,891 |
| 6 | 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | cum | 700 | 7,294.7 | 51,06,290 |
| Centering and shuttering including strutting, propping etc. and removal of form work for : | — | — | — | — | |
| 7 | Foundations, footings, bases for columns | Sqm | 1760 | 392.15 | 6,90,184 |
| REINFORCEMENT CEMENT CONCRETE | — | — | — | — | |
| CAST IN SITU | — | — | — | — | |
| Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : | — | — | — | — | |
| 8 | 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | cum | 3798 | 9,045.75 | 3,43,55,758.5 |
| Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : | — | — | — | — | |
| 9 | 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | cum | 446 | 10,852.95 | 48,40,415.7 |
| 10 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15 degree landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). | cum | 55 | 11,505.5 | 6,32,802.5 |
| FORM WORK | — | — | — | — | |
| Centering and shuttering including strutting, propping etc. and removal of form for | — | — | — | — | |
| 11 | Foundations, footings, bases of columns, etc. for mass concrete | Sqm | 13030 | 392.15 | 51,09,714.5 |
| 12 | Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. | Sqm | 3300 | 842.5 | 27,80,250 |
| 13 | Lintels, beams, plinth beams, girders, bressummers and cantilevers | Sqm | 600 | 736.4 | 4,41,840 |
| 14 | Columns, Pillars, Piers, Abutments, Posts and Struts | Sqm | 510 | 961.3 | 4,90,263 |
| PRE-CAST RCC | — | — | — | — | |
| 15 | Providing, hoisting and fixing above plinth level up to floor five level precast reinforced cement concrete work in string courses, bands, copings, bed plates, anchor blocks, plain window sills and the like, including the cost of required centering, shuttering but , excluding cost of reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). | cum | 1180 | 10,585.9 | 1,24,91,362 |
| DESIGN MIX CONCRETE | — | — | — | — | |
| Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and w o r k a b i l i t y without impairing s t r e n g t h ; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge, for the following grades of concrete.: | — | — | — | — | |
| All works upto plinth level | — | — | — | — | |
| 16 | Concrete of M25 grade with minimum cement content of 330 kg /cum | cum | 1600 | 9,504.75 | 1,52,07,600 |
| MASONRY WORK | — | — | — | — | |
| General | — | — | — | — | |
| Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: | — | — | — | — | |
| 17 | Cement mortar 1:4 (1 cement : 4 coarse sand) | cum | 50 | 7,370.65 | 3,68,532.5 |
| 18 | Cement mortar 1:6 (1 cement : 6 coarse sand) | cum | 25 | 7,132.25 | 1,78,306.25 |
| Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in : | — | — | — | — | |
| 19 | Cement mortar 1:6 (1 cement : 6 coarse sand) | cum | 115 | 9,105.95 | 10,47,184.25 |
| WOOD AND P.V.C. WORK | — | — | — | — | |
| MISCELLANEOUS-WOOD WORK | — | — | — | — | |
| Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. | — | — | — | — | |
| 20 | Fixed to openings /wooden frames with rawl plugs screws etc. | Kg | 350 | 238.35 | 83,422.5 |
| STEEL WORK | — | — | — | — | |
| General | — | — | — | — | |
| 21 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | Kg | 1170 | 133.7 | 1,56,429 |
| Supplying and fixing rolling shutters of approved make, made of required size M.S. laths, interlocked together through their entire length and jointed together at the end by end locks, mounted on specially designed pipe shaft with brackets, side guides and arrangements for inside and outside locking with push and pull operation complete, including the cost of providing and fixing necessary 27.5 cm long wire springs manufactured from high tensile steel wire of adequate strength conforming to IS: 4454 - part1 and M.S. top cover of required thickness for rolling shutters. | — | — | — | — | |
| 22 | 80x1.25 mm M.S. laths with 1.25 mm thick top cover | Sqm | 45 | 3,653.2 | 1,64,394 |
| FLOORING | — | — | — | — | |
| General | — | — | — | — | |
| 23 | Dry brick on edge flooring in required pattern with bricks of class designation 7.5 on a bed of 12 mm mud mortar, including filling joints with Jamuna sand, with common burnt clay non modular bricks. | Sqm | 120 | 792.05 | 95,046 |
| Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate) finished with a floating coat of neat cement, including cement slurry, but excluding the cost of nosing of steps etc. complete. | — | — | — | — | |
| 24 | 40 mm thick with 20 mm nominal size stone aggregate | Sqm | 130 | 614.2 | 79,846 |
| VITRIFIED FLOOR TILES | — | — | — | — | |
| Providing and laying vitrified floor tiles in different sizes (thickness to be specified by the manufacturer) with water absorption less than 0.08% and conforming to IS: 15622, of approved make, in all colours and shades, laid on 20mm thick cement mortar 1:4 (1 cement : 4 coarse sand), jointing with grey cement slurry @ 3.3 kg/ sqm including grouting the joints with white cement and matching pigments etc., complete. | — | — | — | — | |
| 25 | Size of Tile 500x500 mm | Sqm | 90 | 1,524.3 | 1,37,187 |
| ROOFING | — | — | — | — | |
| RAIN WATER SPOUT AND PIPE | — | — | — | — | |
| Providing and fixing on wall face unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion, (i) Single socketed pipes. | — | — | — | — | |
| 26 | 110 mm diameter | Metre | 70 | 377.4 | 26,418 |
| 27 | Providing and fixing precoated galvanised iron profile sheets (size, shape and pitch of corrugation as approved by Engineer-in-charge) of total coated thickness 0.50 mm (base metal of minimum 0.45 mm thickness with total coating thickness of 0.05 mm) with zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns. Sheet should have protective guard film of 25 microns minimum to avoid scratches during transportation and should be supplied in single length upto 12 metre or as desired by Engineer-in- charge. The sheet shall be fixed using self drilling /self tapping screws of size (5.5x 55 mm) with EPDM seal, complete upto any pitch in horizontal/ vertical or curved surfaces, excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required. | Sqm | 170 | 738.65 | 1,25,570.5 |
| FINISHING | — | — | — | — | |
| CEMENT PLASTER (IN COARSE SAND) | — | — | — | — | |
| 15 mm cement plaster on rough side of single or half brick wall of mix: | — | — | — | — | |
| 28 | 1:6 (1 cement: 6 coarse sand) | Sqm | 670 | 395.35 | 2,64,884.5 |
| CEMENT PLASTER WITH A FLOATING COAT OF NEAT CEMENT | — | — | — | — | |
| 12 mm cement plaster finished with a floating coat of neat cement of mix : | — | — | — | — | |
| 29 | 1:3 (1 cement: 3 fine sand) | Sqm | 145 | 439.25 | 63,691.25 |
| EXTERIOR FINISHING | — | — | — | — | |
| Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications : | — | — | — | — | |
| 30 | Two or more coats applied on walls @ 1.25 ltr/10 sqm over and including one coat of Special primer applied @ 0.75 ltr /10 sqm | Sqm | 678 | 193.7 | 1,31,328.6 |
| 31 | Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two or more coat applied @ 0.90 ltr/10 sqm over an under coat of primer applied @ 0.80 ltr/10 sqm of approved brand and manufacture | Sqm | 142 | 170.7 | 24,239.4 |
| DISMANTLING AND DEMOLISHING | — | — | — | — | |
| General | — | — | — | — | |
| Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. | — | — | — | — | |
| 32 | Nominal concrete 1:3:6 or richer mix (including equivalent design mix) | cum | 235 | 2,434.25 | 5,72,048.75 |
| 33 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. | cum | 930 | 3,551.25 | 33,02,662.5 |
| Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. | — | — | — | — | |
| 34 | In cement mortar | cum | 210 | 2,060.2 | 4,32,642 |
| 35 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. | cum | 250 | 263.95 | 65,987.5 |
| ROAD WORK | — | — | — | — | |
| ROADS | — | — | — | — | |
| 36 | Preparation and consolidation of sub grade with power road roller of 8 to 12 tonne capacity after excavating earth to an average of 22.5 cm depth, dressing to camber and consolidating with road roller including making good the undulations etc. and re-rolling the sub grade and disposal of surplus earth with lead upto 50 metres. | Sqm | 2980 | 218.9 | 6,52,322 |
| Supplying and stacking at site. | — | — | — | — | |
| 37 | 63 mm to 45 mm size stone aggregate | cum | 80 | 1,636.05 | 1,30,884 |
| 38 | 53 mm to 22.4 mm size stone aggregate | cum | 90 | 1,842.3 | 1,65,807 |
| 39 | Stone screening 13.2 mm nominal size (Type A) | cum | 90 | 2,034.35 | 1,83,091.5 |
| 40 | Stone screening 11.2 mm nominal size (Type B) | cum | 320 | 2,247.75 | 7,19,280 |
| 41 | Moorum | cum | 450 | 768.25 | 3,45,712.5 |
| 42 | Laying, spreading and compacting stone aggregate of specified sizes to WBM specifications in uniform thickness, hand picking, rolling with 3 wheeled road/vibratory roller 8-10 tonne capacity in stages to proper grade and camber, applying and brooming requisite type of screening / binding material to fill up interstices of coarse aggregate, watering and compacting to the required density . | cum | 200 | 1,046.95 | 2,09,390 |
| SURFACE DRESSING | — | — | — | — | |
| 43 | Surface dressing on old surface with hot bitumen of grade VG - 10 of approved quality using 1.95 kg of bitumen per sqm with 1.50 cum of stone chippings 11.2 mm nominal size per 100 sqm of road surface, including consolidation with road roller of 6 to 8 tonne capacity, etc. complete. | Sqm | 1800 | 175.1 | 3,15,180 |
| PREMIX CARPET | — | — | — | — | |
| Providing and applying tack coat using bitumen emulsion conforming to IS:8887, using emulsion pressure distributer including preparing the surface & cleaning with mechanical broom. | — | — | — | — | |
| With rapid setting bitumen emulsion | — | — | — | — | |
| 44 | On W.B.M / W.M.M. @ 0.4kg/sqm | Sqm | 1800 | 13.45 | 24,210 |
| 45 | On bituminous surface @ 0.25kg/sqm | Sqm | 1800 | 9.2 | 16,560 |
| 2 cm premix carpet surfacing with 1.8 cum and 0.90 cum of stone chippings of 13.2 mm size and 11.2 mm size respectively per 100sqm and 52 kg and 56 kg of hot bitumen per cum of stone chippings of 13.2 mm and 11.2 mm size respectively, including a tack coat with hot straight run bitumen, including consolidation with road roller of 6 to 9 tonne capacity etc. complete (tack coat to be paid for separately). | — | — | — | — | |
| 46 | With paving Asphalt grade VG - 30 with no solvent | Sqm | 1800 | 245.15 | 4,41,270 |
| Providing and laying Bitumen Penetration Macadam with hard stone aggregate of quality, size and grading as specified, with bitumen of suitable penetration grade, including required key aggregate as specified, spreading coarse aggregate with the help of self propelled/ tipper tail mounted aggregate spreader and applying bitumen by a pressure distributor and then spreading key aggregate with the help of aggregate spreader complete, including consolidation with road roller of minimum 8 to 10 tonne capacity to achieve specified values of compaction and surface accuracy : | — | — | — | — | |
| 47 | For 50 mm compacted thickness using coarse aggregate of size 50- 20 mm graded @ 0.60 cum per 10 sqm key aggregate of size 12.5 mm graded @ 0.15 cum per 10 sqm. With paving asphalt grade VG - 10 @ 50 kg/ 10 sqm. | Sqm | 1800 | 505.65 | 9,10,170 |
| Providing and laying bitumen mastic wearing course (as per specifications) with industrial bitumen of grade 85/25 conforming to IS : 702, prepared by using mastic cooker and laid to required level and slope, including providing antiskid surface with bitumen precoated fine grained hard stone chipping of approved size at the rate of 0.005 cum per 10 sqm and at approximate spacing of10 cm centre to centre in both directions, pressed into surface protruding 1 mm to 4 mm over mastic surface, including cleaning the surface, removal of debris etc. all complete. (Considering bitumen using 10.2% as per MORTH specification). | — | — | — | — | |
| 48 | 25 mm thick | Sqm | 1800 | 854.15 | 15,37,470 |
| CONCRETE PAVEMENTS | — | — | — | — | |
| 49 | Cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size) in pavements, laid to required slope and camber in panels as required including consolidation finishing and tamping complete. | cum | 150 | 7,993.8 | 11,99,070 |
| Providing and laying design mix cement concrete of M-30 grade, in roads/taxi tracks/ runways, using cement content as per design mix, using coarse sand and graded stone aggregate of 40 mm nominal size in appropriate proportions as per approved and specified design criteria, providing dowel bars with sleeve/ tie bars wherever required, laying at site, spreading and compacting mechanically by using needle and surface vibrators, levelling to required slope/ camber, finishing with required texture, including steel form work with sturdy M.S. channel sections, curing, making provision for contraction/ expansion, construction and longitudinal joints (10 mm wide x 50 mm deep) by groove cutting machine, providing and filling joints with approved joint filler and sealants, complete all as per direction of Engineer-in-charge (Item of joint fillers, sealants, dowel bars with sleeve/ tie bars to be paid separately). | — | — | — | — | |
| 50 | Cement concrete manufactured in automatic batching plant (RMC plant) including transportation to site in transit mixer | cum | 300 | 11,098.45 | 33,29,535 |
| 51 | Extra for providing and mixing hardening compound of approved quality as per manufacturer's specification in cement concrete. | Litre | 50 | 55.5 | 2,775 |
| ALUMINIUM WORK | — | — | — | — | |
| General | — | — | — | — | |
| Providing and fixing aluminium work for doors, windows, ventilators and partitions with extruded built up standard tubular sections/ appropriate Z sections and other sections of approved make conforming to IS: 733 and IS: 1285, fixing with dash fasteners of required dia and size, including necessary filling up the gaps at junctions, i.e. at top, bottom and sides with required EPDM rubber/ neoprene gasket etc. Aluminium sections shall be smooth, rust free, straight, mitred and jointed mechanically wherever required including cleat angle, Aluminium snap beading for glazing / panelling, C.P. brass / stainless steel screws, all complete as per architectural drawings and the directions of Engineer-in-charge. (Glazing, panelling and dash fasteners to be paid for separately) : | — | — | — | — | |
| For fixed portion | — | — | — | — | |
| 52 | Anodised aluminium (anodised transparent or dyed to required shade according to IS: 1868, Minimum anodic coating of grade AC 15) | Kg | 138 | 495.05 | 68,316.9 |
| For shutters of doors, windows & ventilators including providing and fixing hinges/ pivots and making provision for fixing of fittings wherever required including the cost of EPDM rubber / neoprene gasket required (Fittings shall be paid for separately) | — | — | — | — | |
| 53 | Anodised aluminium (anodised transparent or dyed to required shade according to IS: 1868, Minimum anodic coating of grade AC 15) | Kg | 88 | 598.6 | 52,676.8 |
| Providing and fixing glazing in aluminium door, window, ventilator shutters and partitions etc. with EPDM rubber / neoprene gasket etc. complete as per the architectural drawings and the directions of engineer-in-charge . (Cost of aluminium snap beading shall be paid in basic item): | — | — | — | — | |
| 54 | With float glass panes of 4.0 mm thickness (weight not less than 10kg/sqm) | Sqm | 55 | 1,176.8 | 64,724 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
AnnexureVIA.pdf
ATTACHMENT
AnnexureVIB.pdf
ATTACHMENT
VENDERMANDATEFORM.pdf
ATTACHMENT
MinimumwagesPFESIShramikKalyanPortal.pdf
ATTACHMENT
Annexure-II.pdf
ATTACHMENT
CertificateofInformationregardingEmployment_1.pdf
ATTACHMENT
2018_CE-I_CT_9Date04_06_2018.pdf
ATTACHMENT
CablecuttingPenaltyCirculardated12.06.2023.pdf
ATTACHMENT
BidCapacity.pdf
ATTACHMENT
SPECIALCONDITIONSOFCONTRACTFORALLCONTRACTS14042026.pdf
ATTACHMENT
SPECIALCONDITIONSFORP.WAYWORKS14042026.pdf
ATTACHMENT
GCC_April-2022.pdf
ATTACHMENT
GCCACSNo.1-11_1.pdf
ATTACHMENT
CivilSpecialCondition18052026.pdf
ATTACHMENT
SPECIFICATIONFORWELDING07052026.pdf
ATTACHMENT
ChecklistforSafetyandQualityMeasuresatWorksitesDt_08_03_2025.pdf
ATTACHMENT
BallastSpecification.pdf
ATTACHMENT
DepotBallastSpecialConditions02072026.pdf
ATTACHMENT
SpecialConditionofTrackRenewal07072026.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].