Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 LAccepted-Finance 7TH FLOOR FLAT NO 02 UNITY ENCLAVE BLOCK C MEDAVAKKAM ROAD MAMBAKKAM 600 127 | CHENGALPATTU | TAMIL NADU | 600127 | L1 | Accepted-Finance price bid opened |
Tender Value
Refer Docs
EMD Value
₹1,250
Closing Date
6 Feb 2020, 2:30 pmClosed
SE KGTPS
SE KGTPS maruthur
ST Overhauling of Vacuum Pump 2 in the condensate system of STG at KGTPS Maruthur
2020_EB_155333_1
W.C.No.43/2019 - 20 of SE/KGTPS/MTR
Open Tender
Miscellaneous Works
Works
20 days
Maruthur, Kuttalam Tk
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1,250
Yes
13 Feb 2020
23 Jan 2020
7 Feb 2020
23 Jan 2020
6 Feb 2020
23 Jan 2020
Amount
DECOUPLING THE PUMP FROM THE MOTOR, DISCONNECTING AND REMOVAL OF SEAL WATER LINE: Charges for Decoupling the pump from the motor, disconnecting and removal of seal water line,suction & discharge manifold, disconnection of air line, providing dummy in suction line ejector, disconnection of pump drain line and removal,lifting of total pump assembly from the foundation and placing on a suitable support in the repair bay.
DISMANTLING THE VACUUM PUMP AND ITS COMPONENTS : Charges for Dismantle the Vacuum pump & its components such as removal of fixed and floating end bearings,fixed and floating end bearing head assembly, removal of impeller, shaft, shaft bushings, sleeves,'O' rings & gaskets,etc. through cleaning of released parts.
INSPECTION OF SHAFT IN FIXED AND FLOATING END: Charges for Inspection the fixed and floating end cone surfaces, shaft condition in fixed bearing & floating end bearing seating area, Renewal of bearings in fixed end & floating endRenewal of wornout spares, 'O' rings, gaskets, sleeves, etc.if nescessary. Assembling of impeller with shaft assembling of all parts of vaccum pump. after checking of clearance and fixing the parts as per procedure. Necessary spares will be supplied by TANGEDCO at free of cost.
ASSEMBLING THE VACUUM PUMP: Charges for Placing the vacuum pump assembly into its bed. Coupling of vacuum pump with motor after the alignment correction. Reassembling of disconnected suction & discharge manifolds, seal water line. air line, connecting drain line with pump and connecting all the disconnected lines to its position.
OVERHAULING OF HEAT EXCHANGER OF VACUUM PUMP : Charges for Disconnecting and removal of cooling water line in heat exchanger, disconnecting the seperator. lifting the heat exchanger assembly and placing in a-support, cleaning of cooling coils of heat exchanger; cleaning of seperator inside, Inspection of gaskets in heat exchanger, replace the gasket i frequired, Reassemble the heat exchanger, connecting of cooling water lines, connecting the seperator lines and commisioning complete.
MACHINING OF VACUUM PUMP SPARES: Charges for machining of Vacuum pumps spare parts or sleeves to the need, including transporting charges
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .