Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.2 LAdmitted-Finance | -9.99% | ₹4.2 L | L1 | Admitted-Finance |
| 2 | L2₹4.6 LAdmitted-Finance | -2.00% | ₹4.6 L | L2 | Admitted-Finance |
| 3 | L3₹4.6 LAdmitted-Finance | -1.00% | ₹4.6 L | L3 | Admitted-Finance |
Tender Value
₹5.6 L
EMD Value
₹11,300
Closing Date
16 May 2026, 12:00 pmClosed
EE RED Ayodhya, Vikas Bhawan, Ayodhya
EE RED Ayodhya, Vikas Bhawan, Ayodhya
Under District Ayodhya, Development of basic facilities of toilets and drinking water at Edward Tirth Discussion Site - 113 Vibhishan Kund under Chaurasi Kosi Parikrama area, Lot No 2
2026_REDUP_1147015_2
199/EE RED Ayodhya/26-27 Dt 13/04/2026
Open Tender
Civil Works
AYODHYA
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
₹11,300
EE RED Ayodhya, Vikas Bhawan, Ayodhya
1 Jun 2026
9 May 2026
16 May 2026
9 May 2026
16 May 2026
9 May 2026
11 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Work | - | - | - | - |
DSR2023-2.8, Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | - | - | - | - | |
DSR2023-2.8.1, All kinds of soil For soak pit. | 18.92 | cum | 181.75 | ₹3,438.71 | |
4.1.8 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 2.48 | cum | 4,756.48 | ₹11,796.07 | |
6.1 Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: | - | - | - | - | |
6.1.2 Cement mortar 1:6 (1 cement : 6 coarse sand) | 19.28 | cum | 4,980.09 | ₹96,016.14 | |
6.4 Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level inall shapes and sizes in : 6.4.2 Cement mortar 1:6 (1 cement : 6 coarse sand) cum 9105.95 | 12.68 | cum | 6,358.23 | ₹80,622.36 | |
6.13 Half brick masonry with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level 6.13.2 Cement mortar 1:4 (1 cement :4 coarse sand) sqm 1123.80 | 10.2 | sqm | 784.69 | ₹8,003.84 | |
5.2 Reinforced cement concrete work in walls (any thickness), includingattached pilasters, buttresses, plinth and string courses, fillets, columns,pillars, piers, abutments, posts and struts etc. above plinth level up tofloor five level, excluding cost of centering, shuttering, finishing andreinforcement :5.2.2 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived fromnatural sources : 3 graded stone aggregate 20 mm nominalsize derived from natural sources) | 3.11 | cum | 7,578.07 | ₹23,567.8 | |
5.22 Steel reinforcement for R.C.C. work including straightening, cutting,bending, placing in position and binding all complete upto plinth level. | - | - | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.99 MB
Tendernotice_2.pdf
PDF • 4.54 MB
BOQ_2145072.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid