| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.0 CrAccepted-AOC | ₹3.0 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹3.2 Cr+₹21.7 L (7.26%)Rejected-AOC | ₹3.2 Cr+₹21.7 L (7.26%) | L2 | Rejected-AOC L2 |
Tender Value
₹3.0 Cr
EMD Value
₹5.9 L
Closing Date
31 Jul 2024, 3:00 pmClosed
Additional Collector (Development)
DRDA, Salem
Salem District - P.N.Palayam Block - MRL42-Vellimalai BT Road Maniyarkundam to Poondikadu Road (Via) VV.Sellankurichi, Palayavalavu sellankurichi, Vilapatty at PMGSY III 2023-2024 - Batch - I TN15-238.
2024_RDTN_134369_1
TN15238
Open Tender
Civil Works - Roads
Item Rate
270 days
DRDA
As per tender Document
3 documents required · 3 mandatory
₹0
₹5.9 L
DRDA, Salem
14 Sept 2024
18 May 2024
31 Jul 2024
18 May 2024
31 Jul 2024
18 May 2024
29 May 2024
Amount
1) MRL-42 -Vellimalai BT Road to Poondikadu Road (Via) VV.Sellankurichi, Palayavalavu sellankurichi, Vilapatty Km 0/0- 2/100 & 3/23-7/09
Clearing and grubbing road land including uprooting wild vegetation,grass ,bushes, shrubs, saplings and trees of girth upto 300mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MORD Technical Specification Clause 201.
Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4.
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 (Gravel shoulder)
Construction of embankment using tractor with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 (Gravel shoulder)
Picking the Existing Bituminous Surface to a Depth of 100 mm by Mechanical Means and addition of deficit aggrgate @ 50% for Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with Vibratory roller to achieve the desired density (Recycle GSB50%)
Providing layer spreading and compacting graded stone aggregate to wet mix macadam specifaction inculding premixing the material with water at OMC in mechanical mixer Pug mill carring of mixed material by tipper to site, laying in uniform layers in sub base/base course on a well prepared sub -base and compacting with smooth wheel roller of 80 to 100 KN weight to achieve the desired density inculding lighting.
Providing and applying Primer Coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per MORD Technical Specification Clause 502
Providing and applying Tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 - 0.25 kg per sqm on the prepared granular surface treated with Primer cleaned with Hydraulic broom as per Technical Specification Clause 502.
Mix Seal Surfacing with Plastic waste Providing, laying and rolling of close-graded premix surfacing material of 25 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509
Provision of 15 nos rumble strips with covered with premix bituminous carpet, 15-20mm high at centre, 250mm wide placed at 1m centre to centre approved locations to control speed, marked with w hile strips of road making paint.
Painting lines, dashes, arrows, etc. on roads in two coats on new work with ready mixed road marking paint conforming to IS:164 on bituminous/concrete surface, including cleaning the surface of all dirt, dust and other foreign matter, demarcation at site and traffic control as per drawing and Technical Specification Clause 1702
Providing and fixing of Logo Board as per standard drawings
Reinforced cement concrete M15 grade Kilometre stone of standard design as per IRC:8 fixing in position including painting and printing etc., as per drawing and Technical Specification Clause
Reinforced cement concrete M15 grade Hecta metre stone of standard design as per IRC:8 fixing in position including painting and printing etc., as per drawing and Technical Specification Clause
60 cm Equilateral triangle cautionary sign board
90cm Equilateral Triangle Cautionary Sign Board
Information Board
Maintenance Board
Name Board
1.A) Construction of 1.50m span RCC Slab Culvert at Ch 615m
Earth work Excavation for Foundation of structres upto 3m depth as per drawing and techincal specification Clause 1104 including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and back filling with approved material.
Providing and laying concrete for plain/ Reinforeced concrete in open foundations complete as per drawings and MORD technical specification Cuauses 802,803,1202 & 1203 M20 M15
Providing and laying concrete for plain /Rainforced Concrete in open foundations complte as per drawings and MORD technical specification clauses 802,803,1202, & 1203 M20
Below Sill
Above Sill
Supplying, fitting and placing HYSD bar reinforcement in superstructure complete as per drawing and MORD technical specification Clauses 1002, 1010 and 1202
Providing and laying concrete for Reinforced concrete in super structure complete as per drawings and MORD technical specification Clauses 800, 1205.4 & 1205.5 (RCC M25)
Providing weepholes in abutment, wing wall, return wall with 100mm dia AC pipe extending through the full widht of strucures with slope of 1(V) : 2(H) towards drawing face complete as per drawing and techinical specification
Providing and fixing 20mm thick compressible fibre board in expansion joint complete as per dreeing and technical specifications
Providing and fixing tar paper for bearing
Backfilling behaind abutment, wing wall and return wall complete as per drawing & MORD
1.b) Construction of 1.50m span RCC Slab Culvert at Ch 960m
Earth work Excavation for Foundation of structres upto 3m depth as per drawing and techincal specification Clause 1104 including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and back filling with approved material.
Providing and laying concrete for plain/ Reinforeced concrete in open foundations complete as per drawings and MORD technical specification Cuauses 802,803,1202 & 1203 M20 M15
Providing and laying concrete for plain /Rainforced Concrete in open foundations complte as per drawings and MORD technical specification clauses 802,803,1202, & 1203 M20
Below Sill
Above Sill
Supplying, fitting and placing HYSD bar reinforcement in superstructure complete as per drawing and MORD technical specification Clauses 1002, 1010 and 1202
Providing and laying concrete for Reinforced concrete in super structure complete as per drawings and MORD technical specification Clauses 800, 1205.4 & 1205.5 (RCC M25)
Providing weepholes in abutment, wing wall, return wall with 100mm dia AC pipe extending through the full widht of strucures with slope of 1(V) : 2(H) towards drawing face complete as per drawing and techinical specification
Providing and fixing 20mm thick compressible fibre board in expansion joint complete as per dreeing and technical specifications
Providing and fixing tar paper for bearing
Backfilling behaind abutment, wing wall and return wall complete as per drawing & MORD
1.C) Construction of Hard Bed @ Ch 1410m
Earth work excavation for foundation of structures up to 3m depth as per drawing and technical specification Clause 1104 including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and back filling with approved
Providing and laying Concrete for Plain / Reinforced Concrete in Open foundations complete as per drawings and MORD technical specification Clauses 802,803,1202
Providing and laying Concrete for Plain / Reinforced Concrete in Open foundations complete as per drawings and MORD technical specification Clauses 802,803,1202 & 1203 M 20 ( 1:2:4)
Construction of un-reinforced,dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design over a prepared sub base, with 43 grade cement or any other type as per clause 1501.2.2. M30 ( grade) coarse and fine aggregate confirming to ISS .383 maximum size of coarse aggregate not exceeding 25mm mixed in a concrete mixer including all other incidential charges etc., complete
1.D) Construction of 1.50m span RCC Slab Culvert at Ch 1710m
Earth work Excavation for Foundation of structres upto 3m depth as per drawing and techincal specification Clause 1104 including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and back filling with approved material.
Providing and laying concrete for plain/ Reinforeced concrete in open foundations complete as per drawings and MORD technical specification Cuauses 802,803,1202 & 1203 M20 M15
Providing and laying concrete for plain /Rainforced Concrete in open foundations complte as per drawings and MORD technical specification clauses 802,803,1202, & 1203 M20
Below Sill
Above Sill
Supplying, fitting and placing HYSD bar reinforcement in superstructure complete as per drawing and MORD technical specification Clauses 1002, 1010 and 1202
Providing and laying concrete for Reinforced concrete in super structure complete as per drawings and MORD technical specification Clauses 800, 1205.4 & 1205.5 (RCC M25)
Providing weepholes in abutment, wing wall, return wall with 100mm dia AC pipe extending through the full widht of strucures with slope of 1(V) : 2(H) towards drawing face complete as per drawing and techinical specification
Providing and fixing 20mm thick compressible fibre board in expansion joint complete as per dreeing and technical specifications
Providing and fixing tar paper for bearing
Backfilling behaind abutment, wing wall and return wall complete as per drawing & MORD
1.E) Construction of 1.50m span RCC Slab Culvert at Ch 6300m
Earth work Excavation for Foundation of structres upto 3m depth as per drawing and techincal specification Clause 1104 including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and back filling with approved material.
Providing and laying concrete for plain/ Reinforeced concrete in open foundations complete as per drawings and MORD technical specification Cuauses 802,803,1202 & 1203 M20 M15
Providing and laying concrete for plain /Rainforced Concrete in open foundations complte as per drawings and MORD technical specification clauses 802,803,1202, & 1203 M20 (Below Sill)
Providing and laying concrete for plain /Rainforced Concrete in open foundations complte as per drawings and MORD technical specification clauses 802,803,1202, & 1203 M20 (Above Sill)
Supplying, fitting and placing HYSD bar reinforcement in superstructure complete as per drawing and MORD technical specification Clauses 1002, 1010 and 1202
Providing and laying concrete for Reinforced concrete in super structure complete as per drawings and MORD technical specification Clauses 800, 1205.4 & 1205.5 (RCC M25)
Providing weepholes in abutment, wing wall, return wall with 100mm dia AC pipe extending through the full widht of strucures with slope of 1(V) : 2(H) towards drawing face complete as per drawing and techinical specification
Providing and fixing 20mm thick compressible fibre board in expansion joint complete as per dreeing and technical specifications
Providing and fixing tar paper for bearing
Backfilling behaind abutment, wing wall and return wall complete as per drawing & MORD
1.F) Construction of Protection Wall Km 0/0-1/0
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
Providing and laying concrete for plain/ Reinforeced concrete in open foundations complete as per drawings and MORD technical specification Cuauses 802,803,1202 & 1203 M15
Providing and laying concrete for plain /Rainforced Concrete in open foundations complte as per drawings and MORD technical specification clauses 802,803,1202, & 1203 M20 (Below Sill)
Providing and laying concrete for plain /Rainforced Concrete in open foundations complte as per drawings and MORD technical specification clauses 802,803,1202, & 1203 M20 (Above Sill)
Providing Weepholes in abutment, wing wall, return wall with 100mm dia AC pipe extending through the full width of the structures with slope of 1(V): 2(H) towards drawing face complete as per drawing and technical specification
1.G) Construction of Parapet Wall Km 0/0-1/0 & 4/0-5/0
Stone Masonry work in Cement Mortar in Foundation of Head walls complete as per drawing and MORD technical specification Clause 1109 in Cement Mortar 1: 5
Plastering with cement mortar (1:4), 15 mm thick on brickwork in substructure as per technical specification Clauses 613.4 & 1204
Providing and laying concrete for plain /Rainforced Concrete in open foundations complte as per drawings and MORD technical specification clauses 802,803,1202, & 1203 M20 (1:2:4)
Routine Maintenance after completion of work the road sufrace and shoulder to be maintained in proper condition to make them free from excessive edge drop offs, roughness, scouring and pot holes and cleaning of surface drain including culverts for frre flow of water. Relettering name boards and K.M & H.M stone and other maintenance operation required to keep the road traffic worthly at all the time for the maintenance period for the following years. As per General condition of contract para 32.2.2
For 1st Year
For 2nd Year
For 3rd Year
For 4th Year
For 5th Year
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
P.Jaisankar
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .