Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹47.3 LAccepted-AOC SHOP NO 10 BMC SHOPPING CENTRE MITHA NAGAR GOREGAON WEST MUMBAI 400 104 | MUMBAI | MUMBAI SUBURBAN | MAHARASHTRA | 400104 | ₹47.3 L Quoted ₹48.7 L | L1 | Accepted-AOC Being Lowest Tenderer |
| 2 | L2₹57.2 L+₹8.5 L (17.5%)Rejected-Finance | ₹57.2 L+₹8.5 L (17.5%) | L2 | Rejected-Finance Being Other than Lowest Tenderer |
| 3 | L3₹57.9 L+₹9.2 L (18.9%)Rejected-Finance PLOT NO 1134 1196 MORIVALI VILLAGE TAL AMBARNATH DIST THANE AMBERNATH 421505 | AMBERNATH | THANE | MAHARASHTRA | 421505 | ₹57.9 L+₹9.2 L (18.9%) | L3 | Rejected-Finance Being Other than Lowest Tenderer |
| 4 | L4₹58.8 L+₹10.1 L (20.7%)Rejected-Finance SHOP NO 106 1ST FLOOR ASHOKA SHOPPING CENTRE LT ROAD MUMBAI 400001 | MUMBAI | MUMBAI | MAHARASHTRA | 400001 | ₹58.8 L+₹10.1 L (20.7%) | L4 | Rejected-Finance Being Other than Lowest Tenderer |
| 5 | L5₹59.5 L+₹10.9 L (22.3%)Rejected-Finance | ₹59.5 L+₹10.9 L (22.3%) | L5 | Rejected-Finance Being Other than Lowest Tenderer |
| Sl No | Description | Qty | Unit | R J ENTERPRISES L6 | sapana enterprises L7 | Maruti Abhiyantriki L5 | pk Enterprises L4 | Chakshu Enterprise L8 | Shree Ayyappa Engineering L1 | shubham construction L2 | shakti engineering and electrical works L3 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Labour only for repair/maintenance of ventilation blowers/industrial exhaust fan and control panel in a month incl. cleaning of blower fan, supply and return air duct and drain tap, cleaning & servicing of dampers linkages for free operation, adjustment of belt tension/replacement of same, if required oiling and greasing of blower motor testing functioning of thermostate and sensors complete. Checking/Testing functioning of installation, cleaning of pre filters with water without damaging including repair of worn out connection cable lugs & connectors, replacement of unserviceable electrical accessories of LT panel complete all as directed.
Note :- The Electrical accessories i.e voltmeter, amperemeter, single phase preventor, contactors, relays, timers, MCBs and MCCBs, cables as required are measured and paid separately under relavant items here-in-after. | 50 | Each Job | 6,200 ₹3,10,000 | 6,500 ₹3,25,000 | 3,000 ₹1,50,000 | 3,500 ₹1,75,000 | 6,000 ₹3,00,000 | 3,725 ₹1,86,250 | 2,500 ₹1,25,000 Lowest | 2,500 ₹1,25,000 Lowest |
| 2.00M&L for dismantling electric motor of any make ,3 phase 415V after disconnecting the electric connection of ventillation blower/heavy duty exhaust fan of following capacity, opening the motor for rewinding using super enamelled copper wire of suitable gauge to match with the existing winding wire as per manufacturer's design including varnishing & baking, drying and re-assembling the motor, refixing its original location with proper alignment, making electric connection and testing complete including transporting to workshop for rewinding and back to installation after completion of rewinding work complete all as directed. | |||||||||||
| 2.01 | 37/50 KW/ HP | 1 | Each | 37,523 ₹37,523 | 37,532 ₹37,532 | 37,519 ₹37,519 | 37,541 ₹37,541 | 37,536 ₹37,536 | 27,935 ₹27,935 Lowest | 37,527 ₹37,527 | 35,000 ₹35,000 |
| 2.02 | 30/40 KW/ HP | 3 | Each | 30,023 ₹90,069 | 30,032 ₹90,096 | 30,019 ₹90,057 | 30,041 ₹90,123 | 30,036 ₹90,108 | 22,350 ₹67,050 Lowest | 30,027 ₹90,081 | 29,000 ₹87,000 |
| 2.03 | 22.5/30 KW/ HP | 4 | Each | 22,523 ₹90,092 | 21,000 ₹84,000 | 21,000 ₹84,000 | 29,000 ₹1,16,000 | 22,536 ₹90,144 | 16,760 ₹67,040 Lowest | 18,000 ₹72,000 | 22,523 ₹90,092 |
| 2.04 | 18.5/25 KW/ HP | 2 | Each | 18,773 ₹37,546 | 18,782 ₹37,564 | 18,769 ₹37,538 | 17,000 ₹34,000 | 18,786 ₹37,572 | 13,965 ₹27,930 Lowest | 15,000 ₹30,000 | 18,773 ₹37,546 |
| 2.05 | 15/20 KW/HP | 4 | Each | 14,935 ₹59,740 | 12,000 ₹48,000 | 15,016 ₹60,064 | 15,015 ₹60,060 | 14,000 ₹56,000 | 11,175 ₹44,700 | 11,000 ₹44,000 Lowest | 15,036 ₹60,144 |
| 2.06 | 11/15KW/ HP | 3 | Each | 12,435 ₹37,305 | 12,000 ₹36,000 | 12,516 ₹37,548 | 12,515 ₹37,545 | 12,536 ₹37,608 | 9,310 ₹27,930 Lowest | 12,465 ₹37,395 | 12,536 ₹37,608 |
| 2.07 | 7.5/10KW/ HP | 2 | Each | 7,435 ₹14,870 | 6,000 ₹12,000 | 8,000 ₹16,000 | 3,200 ₹6,400 Lowest | 7,536 ₹15,072 | 5,587 ₹11,174 | 8,000 ₹16,000 | 7,536 ₹15,072 |
| 2.08 | 3.5/4/5 KW/ HP | 2 | Each | 4,735 ₹9,470 | 2,000 ₹4,000 Lowest | 3,000 ₹6,000 | 4,818 ₹9,636 | 3,000 ₹6,000 | 4,800 ₹9,600 | 4,765 ₹9,530 | 3,000 ₹6,000 |
Tender Value
₹49 L
EMD Value
₹98,000
Closing Date
21 Jul 2026, 6:50 pmClosed
LT COL ANIL KUMAR S
GARRISON ENGINEER NW KUNJALI DR HOMI BHABHA ROAD NAVY NAGAR COLABA MUMBAI 400005
8333 REPAIR MAINTANANCE OF VENTILATION SYSTEM, TRAYS AND ALLIED ITEMS AT VARIOUS JETTIES OF NAVAL DOCKYARD UNDER GE(NW) KUNJALI, MUMBAI
2026_MES_775381_1
8333/E8
Open Tender
Civil Works
Item Rate
183 days
GE (NW) KUNJALI
ALL AS PER TENDER DOCUMENT
8 documents required · 8 mandatory
₹500
GE (NW) KUNJALI
₹98,000
Yes
15 Sept 2026
30 Jun 2026
23 Jul 2026
10 Jul 2026
21 Jul 2026
14 Jul 2026
30 Jun 2026 - 10 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Labour only for repair/maintenance of ventilation blowers/industrial exhaust fan and control panel in a month incl. cleaning of blower fan, supply and return air duct and drain tap, cleaning & servicing of dampers linkages for free operation, adjustment of belt tension/replacement of same, if required oiling and greasing of blower motor testing functioning of thermostate and sensors complete. Checking/Testing functioning of installation, cleaning of pre filters with water without damaging including repair of worn out connection cable lugs & connectors, replacement of unserviceable electrical accessories of LT panel complete all as directed.
Note :- The Electrical accessories i.e voltmeter, amperemeter, single phase preventor, contactors, relays, timers, MCBs and MCCBs, cables as required are measured and paid separately under relavant items here-in-after. | 50 | Each Job | - | - |
| 2M&L for dismantling electric motor of any make ,3 phase 415V after disconnecting the electric connection of ventillation blower/heavy duty exhaust fan of following capacity, opening the motor for rewinding using super enamelled copper wire of suitable gauge to match with the existing winding wire as per manufacturer's design including varnishing & baking, drying and re-assembling the motor, refixing its original location with proper alignment, making electric connection and testing complete including transporting to workshop for rewinding and back to installation after completion of rewinding work complete all as directed. | |||||
| 2.01 | 37/50 KW/ HP | 1 | Each | - | - |
| 2.02 | 30/40 KW/ HP | 3 | Each | - | - |
| 2.03 | 22.5/30 KW/ HP | 4 | Each | - | - |
| 2.04 | 18.5/25 KW/ HP | 2 | Each | - | - |
| 2.05 | 15/20 KW/HP | 4 | Each | - | - |
| 2.06 | 11/15KW/ HP | 3 | Each | - | - |
| 2.07 | 7.5/10KW/ HP | 2 | Each | - | - |
| 2.08 | 3.5/4/5 KW/ HP | 2 | Each | - | - |
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.63 MB
8333TENDERDOCUMENT.pdf
Tender Documents • 1.85 MB
BOQ_868255.xls
BOQ • 2.18 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .