| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.5 LAccepted-AOC | ₹23.5 L Quoted ₹36.1 L | L1 | Accepted-AOC work sub divided at the accepted rate of L1 |
| 2 | L2₹5.4 L+₹8,047.83 (0.22%)Accepted-AOC | ₹5.4 L+₹8,047.83 (0.22%) Quoted ₹36.2 L | L2 | Accepted-AOC work sub divided at the accepted rate of L1 |
| 3 | L3₹7.2 L+₹2.0 L (5.54%)Accepted-AOC | ₹7.2 L+₹2.0 L (5.54%) Quoted ₹38.1 L | L3 | Accepted-AOC work sub divided at the accepted rate of L1 |
Tender Value
₹40.2 L
EMD Value
₹80,300
Closing Date
20 Feb 2021, 2:00 pmClosed
Executive Engineer Guwahati West Division Irrigati
Office of The Executive Engineer Guwahati West Division_Irrigation_Guwahati_8
Resectiong and CCLining of Canal M4 from Ch.300m to 600 m under renovation of Ubhati FIS under Palashbari LAC under SOPD for the year 2020_21
2021_ID_21281_1
GWDI_W_223_e_tender_2019_424 Date_15.02_21
Open Tender
Civil Works
Item Rate
180 days
village kochpara under Chayani Borduar Dev. Block
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,000
₹80,300
Yes
26 Feb 2021
17 Feb 2021
20 Feb 2021
17 Feb 2021
20 Feb 2021
17 Feb 2021
Amount
Resectiong and C.C. Lining of Canal M4 from Ch. 300.00 m to 600.00 m
Earthwork in filling in all soils in canal embankment and bed filling as per design section and grade by cart carriage for a minimum distance of 1 KM including paying compensation of earth obtained from private land if any loading, unloading, spreading the same in embankment in layers not exceeding 15 cm thick including clearing light jungle, removing trees upto 15 cm dia and uprooting roots and stumps etc. from the seat of the embankment, breaking clods not more than 10 mm cube, ramming, dressing and roughening the seat of the embankment, profiling etc. with all lift, complete as directed. (Payment will be made after deduction of 12.50% shrinkage allowance from the gross quantity). A) all type of soil except soil mixed with gravel and boulders For normal lead of 30m and lift of 1.50
Earthwork in excavation in foundation of canal structures in all types of soils as per design and drawing including dressing the foundation, shoring etc. removing the surplus spoils by head load to safe distance from the working place and depositing the required spoils in uniform layers, dressing, watering, breaking clods to not more than 10 mm cube with compensation, complete as directed at site. (Including bailing out stagnant rain water where necessary).
Preparation of sub-grade and side slope of canal lining work by uprooting vegetation roots bamboo shrubs ,banana trees etc. including cleaning etc. by sweeper where necessary filling the uprooted wholes by earth levelling ,dressing ,ramming,watering etc. level the sub grade properly to maintain the thickness of the lining slab etc. complete as directed.
Soling in foundation at all levels including filling intersides, ramming etc complete as directed and of specified thickness with 9 cm brick on flat including sand packing
River sand filling in plinth, canal bed, canal slopes, bases of structure, etc in layers not more than 150 mm thick including necessary carriage, watering etc, complete as directed as specifie
Supplying fitting fixing and laying reinforcement (TATA) in position in RCC work including cutting, bending, cranking with two piles 0.91 M (20 BWG) annealed wire hooking tying, complete as directed.
CC work in proportion 1:2:4 in foundation / abutment / piers / wing walls etc. with hard broken stone aggregate of size 6 mm to 20 mm including curing with necessary timber shuttering, scaffolding where necessary complete as directed. (Shuttering, scaffolding cost will be paid separately
RCC work in slab, abutment cap and above abutment, pier cap, pedestal, dirt wall etc. in proportion 1:1½:3 with hard broken stone aggregate of size 6 mm to 20 mm with proper reinforcement as per design including curing etc, complete as directed with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
12 mm thick cement plastering including clearing the surface and curing etc. complete as directed.in prop. 1:4.
Providing 50 mm wide expansion joints with bituminous compound mixed with coarse sand for canal work at an interval of 10 M apart including laying, fitting the compound in proper position, etc, complete as directed
SRI ANESWAR SWARGIARY
M/S ABHISHEK ENTERPRISE
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .