Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹6.9 LAdmitted-Finance | -33.11% | ₹6.9 L | L1 | Admitted-Finance |
| 2 | L2₹7.0 L+₹9,177.20 (1.33%)Admitted-Finance | -32.22% | ₹7.0 L+₹9,177.20 (1.33%) | L2 | Admitted-Finance |
| 3 | L3₹7.3 L+₹37,739.94 (5.47%)Admitted-Finance | -29.45% | ₹7.3 L+₹37,739.94 (5.47%) | L3 | Admitted-Finance |
| 4 | L4₹7.3 L+₹41,761.41 (6.05%)Admitted-Finance | -29.06% | ₹7.3 L+₹41,761.41 (6.05%) | L4 | Admitted-Finance |
Tender Value
₹10.3 L
EMD Value
₹1.0 L
Closing Date
30 Jun 2026, 11:00 amClosed
EO
RATH
Construction of a CC road and drain in Mohalla Sikandarpura-01 Ward-01 extending from Bhanu Pratap house to the houses of Mohit Kumar and Shyamkaran (Length 166 m Width 3-20 m)-
2026_DOLBU_1158958_1
367-6/etender/15thCFC/Awas/Dt. 08.06.26
Open Tender
Civil Works
Percentage
180 days
RATH
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,300
EO
₹1.0 L
6 Aug 2026
10 Jun 2026
30 Jun 2026
10 Jun 2026
30 Jun 2026
10 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in cutting or in embankement in ordinary soil+loading ,unloading cartage upto 3.00 km [As per S.i. No-253,231(a)235(a)] | 522.9 | Cum | 283.38 | ₹1,48,179.4 |
| 2 | Sand filling in plinth including supply of necessary quality of sand from a distance not exceeding 8km(5miles) from the side of work & including watering dressing etc. Rate to include cost of all materials labour and tools & plants etc. required for proper completion of the work.(As per S.I. No-255) | 52.73 | Cum | 1,000 | ₹52,730 |
| 3 | P/L of C.C in 1:6:12 (1 cement :6 f.sand:12 stone ballast) including supply of all materials T&P etc labour required for the proper completion of the work. (As per S.i. No-273) | 71.95 | Cum | 3,700 | ₹2,66,215 |
| 4 | P/L of C.C in 1:11/2 :3 (1 -cement :11/2 c.sand. 3- 20 mm gauge stone grit ) including supply of all materials T&P etc labour required for the proper completion of the work.(As per S.i. No-279 b ) | 61 | Cum | 6,100 | ₹3,72,100 |
| 5 | Making Construction joint with maxphalt seat board including all material, labour and T&P etc. | 135.57 | Rm | 55 | ₹7,456.35 |
| 6 | Supply and laying of 125 micron polythene including all material, labour and T&P etc. | 406.7 | Sqm | 20 | ₹8,134 |
| 7 | Class -150 brick work in 1:4 cement and coares sand mortar.(As per S.I. No-305) | 22.91 | Cum | 5,300 | ₹1,21,423 |
| 8 | 12mm thick plaster on brick work in 1:4 cement and coare sand mortar.(As per S.i. No-584) | 99.6 | Sqm | 130 | ₹12,948 |
| 9 | Mild steel in heavy size.( I Section beam channel M.B.-150) | 5.6 | Qtl | 6,600 | ₹36,960 |
| 10 | Sign Board all complete. | 1 | No. | 5,000 | ₹5,000 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
cancelled_1.pdf
pdf • 0.14 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.43 MB
BOQ_2172105.xls
BOQ • 0.28 MB
FDROnlineNsC.pdf
PDF • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .