| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹61.5 CrAccepted-AOC NEAR OLD LIC OFFICE SARNI DISTT BETUL M P 460 447 | BETUL | MADHYA PRADESH | 460447 | L1 | Accepted-AOC Work order done | |
| 2 | L2₹62.5 Cr+₹1.0 Cr (1.67%)Rejected-Finance | L2 | Rejected-Finance EMD Refund | |
| 3 | L3₹63.1 Cr+₹1.6 Cr (2.68%)Rejected-Finance | L3 | Rejected-Finance EMD Refund | |
| 4 | L4₹65.5 Cr+₹4.0 Cr (6.56%)Rejected-Finance | L4 | Rejected-Finance EMD Refund |
Tender Value
₹75.1 Cr
EMD Value
₹37.5 L
Closing Date
14 Nov 2023, 5:30 pmClosed
Chief engineer
CE PWD REWA ZONE REWA
Construction of Rewa-Semaria Road (SH 09) Basaman Mama to Jadua via Kakredi Mainha Jarmora Kumhra Bara Bhamra Road Length 45.70 km including electrical work
2023_PWDRB_314728_1
15/Gen./2023-24
Open Tender
Civil Works - Roads
Percentage
1095 days
Rewa
please refer tender document
4 documents required · 4 mandatory
₹50,000
₹37.5 L
21 Jun 2024
11 Oct 2023
16 Nov 2023
11 Oct 2023
14 Nov 2023
11 Oct 2023
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting rankvegetation, grass, bushes, shrubs, saplings and trees girth up to 300mm, removal of stumps of trees cut earlier and disposal ofunserviceable materials and stacking of serviceable material to beused or auctioned up to a lead of 1000 metres including removal anddisposal of top organic soil not exceeding 150 mm in thickness A) In area of light jungle | 36.56 | Hect. | 22,918 | ₹8,37,882.08 |
| 2 | Scarifying existing bituminous surface to a depth of 50 mm by mechanical means Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with in all lifts and lead upto 1000 metres. . | 91,875 | cum | 5 | ₹4,59,375 |
| 3 | Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 metres.Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location with all lifts and lead upto 1000m as per relevent clauses of section-300 of specification. | 60,097.66 | Cum | 55 | ₹33,05,371.3 |
| 4 | Excavation in Hard Rock with disposal upto 1000 metres
Excavation for roadway in hard rock with rock breakers i/c breaking rock or by drilling, blasting and breaking, trimming of bottom and side slopes in accordance with requirements of lines, grades and cross sections, loading and disposal of cut road with all lifts and leads upto 1000 metres and as per relevent clauses of section-300 of specification. | 40,065.11 | Cum | 203 | ₹81,33,217.33 |
| 5 | Construction of Embankment with Material Deposited from Roadway Cutting Construction of embankment with approved materials CBR>7 deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-1, 300-2 and as per relevent clauses of section-300. | 42,068.36 | Cum | 60 | ₹25,24,101.6 |
| 6 | Embankment Construction with Material Obtained from Borrow Pits Construction of embankment with approved material having CBR>7 obtained from borrow pits with all lifts and leads, transporting to site,spreading, grading to required slope and compacting to meet requirement of table 300-1, 300-2 and as per relevent clauses of section-300. | 2,85,156.87 | Cum | 155 | ₹4,41,99,314.85 |
| 7 | Crusher Run Macadam Sub Base/Base Course
Providing crushed stone aggregate, depositing on a prepared surface by hauling vehicles, spreading and mixing with a motor grader, watering and compacting with a vibratory roller to clause 410 to form a layer of sub-base/Base in accordance to Table No. 400-14, 400-15 and as per clause of section 407 of specifications | 96,769.75 | Cum. | 1,157 | ₹11,19,62,600.75 |
| 8 | Wet Mix Macadam
Providing, laying, spreading and compacting graded stoneaggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on wellprepared surface and compacting with vibratory roller to achievethe desired density in accordance to Table No. 400-12, 400-13 and as per clause of section 406 of specifications. | 83,973.75 | Cum. | 1,493 | ₹12,53,72,808.75 |
| 9 | Construction of Shoulders with approved material/selected soil i/c excavation all lifts & leads i/c grading to required slope & camber of 4% and compacting using vibratory roller of 80 to 100 kN static weight to meet requirement as per relevant clause of 400. | 1,11,051 | Cum. | 223 | ₹2,47,64,373 |
| 10 | Prime coat Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.75 kg/sqm using mechanical means as per clause 502 of specifications. | 3,35,895 | Sqm. | 37 | ₹1,24,28,115 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_371845.xls
BOQ Document • 0.60 MB
131237677.pdf
Tender Document • 13.29 MB
131237683.pdf
Tender Document • 1.09 MB
131237690.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .