Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹6.4 LAccepted-AOC | L-1 | Accepted-AOC The work is awarded to L-1 bidder | |
| 2 | Rejected-Technical NEAR GAYATRI MANDIR ADARSH NAGAR KUSMUNDA KORBA CG 495454 | KORBA | CHHATTISGARH | 495454 | - | Rejected-Technical DUE TO L-5 BIDDER. | |
| 3 | Rejected-Technical 0 | - | Rejected-Technical DUE TO L-6 BIDDER. | |
| 4 | Rejected-Technical | - | Rejected-Technical DUE TO L-3 BIDDER. | |
| 5 | Rejected-Technical | - | Rejected-Technical DUE TO L-2 BIDDER. |
Tender Value
₹11.1 L
EMD Value
₹13,900
Closing Date
6 Aug 2022, 5:00 pmClosed
GM CIVIL GEVRA AREA
Office of the General Manager , SECL, Gevra Area, PO Gevra Project, Distt.- Korba (CG)Contact No. 9425534061
Extension of road divider wall near west MTK Junction at Gevra Project of Gevra Area
2022_SECL_251139_1
SECL /GA/ GM(C) / ETN/ 22-23 /75 dtd. 23.07.22
Open Tender
Civil Works - Others
Item Rate
90 days
Gevra Area
Please refer Tender documents.
3 documents required · 3 mandatory
₹13,900
3 Oct 2022
26 Jul 2022
8 Aug 2022
26 Jul 2022
6 Aug 2022
27 Jul 2022
26 Jul 2022 - 30 Jul 2022
Amount
Item Description/ Heading
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III) : 6 graded stone aggregate 20 mm nominal size)
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
Brick work in cement mortar 1:6 (1 cement : 6 coarse sand) with fly ash bricks of size 230 x 110 x 70 mm having crushing strength of 75 Kg / Sqm to 100 Kg / Sqm as per the specification in foundation and plinth level.
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Cold twisted bars
Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete
Dry stone pitching 22.5 cm thick including supply of stones and preparing surface complete.
12 mm cement plaster of mix : 1:6 (1 cement: 6 coarse sand)
Finishing walls with water proofing cement paint of required shade : New work (Two or more coats applied @ 3.84 kg/10 sqm)
Earth work in excavation by mechanical means (Hydraulic excavator) over areas (exceeding 30 cm in depth 1.5m in width as well as 10 sqm on plan) including disposal of escavated earth with lead of 2.00 Km and all lift disposed earth to be levelled and neatly dressed. All kind of soil. (like spillage / OB muck, slush earth etc.)
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.
Total impact of GST for the purpose of CTC
RANN CONSTRUCTION
RAJ KISHORE PANDEY
SHREE KRISHNA TRADERS AND TRANSPORTER
ABKASH SINGH
Manoj Kumar
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_259509.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .