| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.4 CrAccepted-AOC | ₹12.4 Cr | L1 | Accepted-AOC As Per Tender Condition |
| 2 | L2₹12.5 Cr+₹10.4 L (0.84%)Rejected-Finance | ₹12.5 Cr+₹10.4 L (0.84%) | L2 | Rejected-Finance As Pet Tender Condition |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 4 | Not Admitted-Fee/PreQual/Technical NEAR VIJAY MARUTI TEMPLE DHULE ROAD AMALNER DIST JALGAON 425401 | AMALNER | JALGAON | MAHARASHTRA | 425401 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹11.8 Cr
EMD Value
₹5.9 L
Closing Date
14 Feb 2022, 5:00 pmClosed
Executive Engineer, P.W. Division Amalner
Executive Engineer, P.W. Division Amalner
Construction of Major Bridge Across Bori River between MDR-3 Karankheda to Mudi and approached Taluka Amalner District Jalgaon
2022_PWR_757218_1
E-TENDER NOTICE NO.27 FOR 2021-22 OF PWD AMALNER
Open Tender
Civil Works
Percentage
540 days
P.W.Sub.(Const.)Dn.Amalner
Please refer Tender documents.
9 documents required · 9 mandatory
₹3,540
₹5.9 L
Chief Engineer, Public Works Region, Nashik
28 Sept 2025
18 Jan 2022
15 Feb 2022
18 Jan 2022
14 Feb 2022
18 Jan 2022
9 Feb 2022
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation for foundation in earth, soils of all types, sand, gravel, soft murum including shoring and strutting, dewatering as necessary and disposing off excavated stuff as directed etc. complete. ( By Mechanical Means ) | 14,969.68 | Cubic Metre | 86 | ₹12,87,392.48 |
| 2 | Dewatering on BHP basis by using water pump including diversion of stream, providing cofferdams, earthern bunds etc. as may be necessary for foundation and other parts of the the works and pumping out water during and after excavation as may be required by using 5.0 to
9.0 BHP pump etc. complete. (prior approval of Superintending Engineer will be necessary) | 752 | Hour | 189 | ₹1,42,128 |
| 3 | Providing and laying in situ / ready mix controlled grade of M25 of trap /granite /quartzite
/gneiss metal for RCC works in cut off walls / curtain walls including necessary scaffolding, centering, compacting by vibrator, finishing and curing etc. complete. (with fully automatic micro processor based PLC with SCADA enabled with reversible drum type mixer/ concrete batch mix plant (pan mixer) with fine agreegates of required specifications ( VSI sand finely washed etc ), excluding reinforcement) | 1,137.25 | Cubic Metre | 7,782.76 | ₹88,50,943.81 |
| 4 | Providing and laying in situ / ready mix M-30 controlled reinforced cement concrete of trap metal for raft slab including "V" haunches, formwork, scaffolding, compaction by vibrating, finishing curing etc. complete. concrete batch mix plant / pan mixer with fine agreegates of required specifications ( VSI sand finely washed etc ) etc. complete. (excluding reinforcement).
a) RCC Grade with reversible drum type mixer/ concrete batch mix plant (pan mixer) . | 1,379.69 | Cubic Meter | 6,695.85 | ₹92,38,197.29 |
| 5 | Providing and filling sand in foundation trenches / below Raft as per drawing and technical specifications etc. complete. (Coarse Sand and Gravel ) | 1,840.85 | Cubic Metre | 3,220.51 | ₹59,28,475.83 |
| 6 | Providing and laying in situ / ready mix / ready mix M-15 cement concrete of trap/ granite/ quartzite/ gneiss metal in foundation including necessary centering, formwork, bailing out water, compacting and curing etc. complete. (with fully automatic micro processor based PLC with SCADA enabled with reversible drum type mixer/ concrete batch mix plant (pan mixer) with natural /artifical sand) | 238.59 | Cubic Metre | 5,954.6 | ₹14,20,708.01 |
| 7 | Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40Kilogrameach complete as per drawings and Technical specifications etc. complete. (boulder laid without wire crates) | 1,228.73 | Cubic Metre | 1,901.03 | ₹23,35,852.59 |
| 8 | Providing and laying in situ / ready mix M-30 plain cement concrete of trap /granite/quartzite/ gneiss metal for cast in citu piers, abutment, returns, wings etc. including provision of "V" shaped false joints to form suitable panels on the faces to approve design with compacting by vibrating and curing complete, including plywood/steel form work centering ( excluding dewatering by means of pump) and including bailling out water and curing finishing in CM 1:3 etc. complete. as directed by engineer in charge basic rate shall be increased for height above 5.00 m in followinh manners\ (With Concrete Mixer)With fine agreegates of required specifications ( VSI sand finely washed etc ) i) Height up to 5 m, normal rate. | 250.57 | Cubic Meter | 8,085.85 | ₹20,26,071.43 |
| 9 | Providing and laying in situ / ready mix M-30 plain cement concrete of trap /granite/quartzite/ gneiss metal for cast in citu piers, abutment, returns, wings etc. including provision of "V" shaped false joints to form suitable panels on the faces to approve design with compacting by vibrating and curing complete, including plywood/steel form work centering ( excluding dewatering by means of pump) and including bailling out water and curing finishing in CM 1:3 etc. complete. as directed by engineer in charge basic rate shall be increased for height above 5.00 m in followinh manners
ii) Height 5 to 7.50 m, add 5 percent extra over basic rate. | 30.75 | Cubic Meter | 8,462.5 | ₹2,60,221.88 |
| 10 | Providing and laying in situ / ready mix M-30 cement concrete of trap /granite/quartzite/ gneiss metal for cast in citu R.C.C. solid piers,column etc . including provision of V shaped false joints to form suitable panels on the faces to approve design with compacting by vibrating and curing complete. Including plywood/steel formwork, centering ( excluding dewatering by means of pump) and including bailling out water and including CM 1:3 curing complete.
i) Height up to 5 m, normal rate. | 607.73 | Cubic Meter | 8,127.85 | ₹49,39,538.28 |
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
BOQ_1303545.xls
BOQ Document • 0.42 MB
90953729.pdf
Tender Document • 1.33 MB
27_1.pdf
Tender Document • 2.18 MB
90953731.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .