Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.4 LAdmitted-Finance | -43.00% | ₹3.4 L | L1 | Admitted-Finance |
| 2 | L2₹3.6 LAdmitted-Finance | -40.40% | ₹3.6 L | L2 | Admitted-Finance |
| 3 | L3₹3.9 LAdmitted-Finance | -34.51% | ₹3.9 L | L3 | Admitted-Finance |
| 4 | L4₹4.1 LAdmitted-Finance | -31.90% | ₹4.1 L | L4 | Admitted-Finance |
| 5 | L5₹4.8 LAdmitted-Finance | -20.00% | ₹4.8 L | L5 | Admitted-Finance |
Tender Value
₹6 L
EMD Value
₹12,000
Closing Date
11 Aug 2026, 4:00 pmClosed
Xen Rew Office Kathua
Xen Rew Office Kathua
Development of park and allied works opposite pyt ghar Bhed Balode
2026_RDPR_318804_1
e-NIT No.158/REW/K of 2026-27 Dated 31/07/2026
Open Tender
Civil Works
Percentage
90 days
Kathua
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Rural Development and Panchayati Raj
₹12,000
27 Aug 2026
31 Jul 2026
12 Aug 2026
31 Jul 2026
11 Aug 2026
31 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m in -All kinds of soil | 557.62 | sqm | 24.12 | ₹13,449.79 |
| 2 | Earth work in excavation by manual Means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: in all kinds of Soils. | 7.25 | cum | 479.35 | ₹3,475.29 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:5:10 (1 cement :5 coarse sand : 10 graded stone aggregate 40 mm nominal size) . | 2.39 | cum | 4,826.5 | ₹11,535.34 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement :3 coarse sand :6 graded stone aggregate 20 mm nominal size) . | 8.21 | cum | 5,733.6 | ₹47,072.86 |
| 5 | Providing and laying in position 30 % Stone Boulders | 3.52 | cum | 937.9 | ₹3,301.41 |
| 6 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in : in 1:6 Cement Sand Mortar in superstructure above plinth upto level V | 1.06 | cum | 7,571.55 | ₹8,025.84 |
| 7 | Half Brick work with common burnt clay (non-modular) bricks of class designation 7.5 | 23.42 | sqm | 980 | ₹22,951.6 |
| 8 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | 17.21 | cum | 1,204.12 | ₹20,722.91 |
| 9 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works above plinth level 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) | 0.42 | kg | 7,788 | ₹3,270.96 |
| 10 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level . | 33.97 | kg | 123.2 | ₹4,185.1 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.94 MB
BOQ_1052610.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].