Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.3 LAccepted-AOC ROWRIAH KB ROAD PO CHALIHA JORHAT 785004 ASSAM | JORHAT | JORHAT | ASSAM | 785004 | L1 | Accepted-AOC Accepted Being L1 | |
| 2 | L2₹20.8 L+₹46,150 (2.27%)Rejected-Finance | L2 | Rejected-Finance Rejected | |
| 3 | L3₹21.0 L+₹66,185 (3.26%)Rejected-Finance | L3 | Rejected-Finance Rejected | |
| 4 | L4₹21.1 L+₹76,965 (3.79%)Rejected-Finance | L4 | Rejected-Finance Rejected | |
| 5 | L5₹21.1 L+₹83,375 (4.11%)Rejected-Finance | L5 | Rejected-Finance Rejected |
Tender Value
Refer Docs
EMD Value
₹37,600
Closing Date
18 Jun 2021, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GE AF JORHAT
GE AF JORHAT PIN 785005
MANNING AND OPERATION OF CENTRAL AND PACKAGE TYPE AC PLANTS AT TECH AREA UNDER GE AF JORHAT
2021_MES_446403_1
8880/E8
Open Tender
Miscellaneous Works
Item Rate
335 days
GE AF JORHAT
Please refer Tender documents.
9 documents required · 9 mandatory
₹500
GE AF JORHAT
₹37,600
Yes
13 Aug 2021
28 May 2021
21 Jun 2021
28 May 2021
18 Jun 2021
11 Jun 2021
60 days
Amount
Maintenance and Operation of CENTRAL AC PLANT 40TR with all accessories / fittings / fixtures including minor spares parts(2 Nos. 20 TR Capacity as WORKING and 1 No. 20 TR Capacity as STANDBY) (consisting of Water Cooled with Chiller Unit) for WWR at Sensitive Tech area of 10 WING with ONE OPERATOR (REFG MECH) PER SHIFT (8 HOUR) for 3 SHIFT from 0600 HOUR TO NEXT DAY 0600 HOUR including SUNDAY & HOLIDAY as required including Connecting AC Equipments comprising the following Components :– (i) Reciprocating Open Type Compressor (3 Nos.) Each of MAKE : ACCEL 20 TR Capacity and Induction Motor Each 25 HP Capacity (3 Nos.) 415 Volt 3 Phase. 2 Nos. Compressor Unit will Run at a Time and 1 No. Compressor Unit shall be kept Standby. All Compressor Unit will be brought into Operation alternatively (Each Unit for minimum 8 HOUR).
(ii)Water cooled condensing unit 3 Nos Condensing Unit (Shell & Tube Type) of Capacity 20 TR Each with Single Circuit Com-pressor including 2 Nos Monoblock Water Pump Set, Each 5.0 HP Capacity 415 Volt 3 Phase. (iii)1 No. Cooling Tower of 40 TR Capacity including blower fan and 2.0 HP Electric Motor. (iv) 1 No. AHU Unit of 40 TR Capacity with blower fan and Motor Belt Drive including Cooling Coils Washable Air Filter assembly sliding Type Washable such as Micro Vee Filter of different Size, Pre Filter and Strip Heater for Heating Arrangement, Humidifications/Dehumidification, spray pump and Fire Damper, Diffuser, grills etc. (v) All Safety Controls like LP, HP Cut Out, Solenoid Expansion Valve, Loader, all Gauges, Thermometer and Humidifier, all Water Pipe Line, Control Valve etc., and Connected Electric Panel & controls.
(vi) Make up water tank & control valve. (NOTE : The Term Daily Operation includes Minor Maintenance like adjustment of Fan Belts, all Safety Controls, cleaning Spray Nozzels, Checking of Electrical of System, Replace-ment of Fuse, washing of filters, tank and also Hourly Reading and Recording Various Data of EACH PLANT. LOG SHEETS shall be provided by the Contractor in Standard Performa to maintain Record consultation with the Engineer-in-Charge). (vii) Make up water tank, chilled water tank & valves. (NOTE : The Term Daily Operation includes Minor Maintenance like adjustment of Fan Belts, all Safety Controls, cleaning Spray Nozzels, Checking of Electrical of System, Replace-ment of Fuse, washing of filters, tanks and also Hourly Reading and Recording Various Data of EACH PLANT. LOG SHEETS shall be provided by the Contractor in Standard Performa to maintain Record consultation with the Engineer-in-Charge).
Maintenance and Operation of CENTRAL AC PLANT 15 TR : 2 Nos 7.5 TR capacity as WORKING and 1 No 7.5 TR capacity as STANDBY) for STORE SHED at Sensitive Tech area of 10 WING AF with ONE OPERATOR (REFG MECH) PER SHIFT (8 HOUR) for 3 SHIFT from 0600 HOUR TO NEXT DAY 0600 HOUR including SUNDAY & HOLIDAY as required including connecting AC Equipments comprising the following Components :– (A) CENTRAL AC PLANT 15 TR with all accessories / fittings / fixtures including minor spares parts (2 No. 7.5 TR Capacity as WORKING and 1 No. 7.5 TR Capacity as STANDBY) consisting of Water Cooled with Chiller Unit) for STORE SHED at Sensitive Tech area of 10 WING AF :- (i) Reciprocating Open Type Compressor (3 Nos.) Each of MAKE : FREEZE KING 7.5 TR Capacity and Induction Motor Each 12.5 HP Capacity (3 Nos.) 415 Volt 3 Phase. 2 Nos. Compressor Unit will Run at a Time and 1 No. Compressor Unit shall be kept Standby. All Compressor Unit will be brought into Operation alternatively (Each Unit for minimum 8 HOUR).
(ii) 3 Nos Condensing Unit (Shell & Tube Type) of Capacity 15 TR Each with Single Circuit Com-pressor including 2 Nos. Monoblock Water Pump Set, Each 2.5 HP Capacity 415 Volt 3 Phase. (iii) 1 No. Cooling Tower of 15 TR Capacity including Blower Fan and 2.0 HP Electric Motor Coupled with Belt Drive. (iv) 1 No. AHU Unit of 15 TR Capacity with Blower Fan and Motor Belt Drive including Cooling Coils Washable Air Filter Assembly Sliding Type Washable such as Micro Vee Filter of different Size, Pre Filter, and Strip Heater for Heating Arrangement and Fire Damper, Diffuser & grills. (v) All Safety Controls like LP, HP Cut Out, Solenoid Expansion Valve, Loader, all Gauges, Thermometer and Humidifier, all Water Pipe Line, Control Valve, etc., and Connected Electric Panel & controls. (NOTE :- The Term Daily Operation includes Minor Maintenance like adjustment of Fan Belts, all Safety Controls, cleaning Spray Nozzels, tank Checking of Electrical of System, Replace-ment of Fuse,washing of filters and also Hourly Reading and Recording Various Data of EACH PLANT. LOG SHEETS shall be provided by the Contractor in Standard Performa to maintain Record consultation with the Engineer-in-Charge).
Maintenance and Operation of services for PACKAGE TYPE AC PLANT 20 TR with all accessories/fittings/fixtures including minor spares parts (2 Nos. 10 TR Capacity as WORKING & 1 No. 20 TR Capacity as STANDBY) (consisting of air cooled blower fan with outer unit) for AVONIC LAB of 10 WING AF with ONE SKILLED OPERATOR (REFG MECH) PER SHIFT (of 8 HOUR each) for ONE SHIFT IN A DAY from 0600 HOUR to 1400 HOUR including SUNDAY & HOLIDAY as required basis including Connected Equipments, comprsing the following Components :– (a) Compressor Drive Packaged Unit (3 Nos), comprising of Reciprocating Scoll type Hermetically Sealed Compressor with Suction and Discharge Valve including Blower Motor. (b) Air Cooled Condenser Unit (3 Nos) (c) All Controls for Refrigerant such as Thermo-stat Expansion Valve, Humidistat, Solenoid Valve, Y Stainer and connected LT Electrical Panel controls. (d) Filter Assembly such as Pre-Filter/Micro Filter /Dust Filtration down to Particles of 5 Micron. (e) All Controls for Refrigerant such as Thermo-stat Expansion Valve, Humidistat, Solenoid Valve, Y Stainer and connected LT Electrical Panel.
(f) Filters, Diffuser grills, heaters, fire damper, humidification/dehumidification, spray pump etc (NOTE : The Term Daily Operation includes Minor Maintenance like adjustment of Fan Belts, all Safety Controls, cleaning Spray Nozzels, Checking of Electrical system, Replacement of Fuse, washing of filters and also Hourly Reading and Recording Various Data of EACH PLANT. LOG SHEETS shall be provided by the Contractor in Standard Performa to maintain Record consultation with the Engineer-in-Charge).
M & L for descaling of copper tubes of condensor suitable for 7.5 TR compressor by circulating discaling solution (diluted HCL) with pump and rodding into the tubes for removing all deposited materials, complete all as specified and directed.
All as per Item No.4 here-in-before but condenser suitable for 20 TR compressor.
S&F LP/HP Cut Out with Operating range at 0 / PSI to 30 / PSI as approved and suitable including taking down the old unserviceable one complete all as specified and directed.
S&F Oil pressure gauge as approved and suitable including taking down the old unserviceable one, complete all as specified and directed.
Supply & filling only refrigerant gas R–22 as approved and suitable for Compressor of CENTRAL & PACKAGE AC PLANT / UNIT of Various Locations, complete all as specified and directed.
RAJIB AND CO
M/S SANTOSHI TRADERS
THE SUPPLY AGENCY
M/S GOPAL ROY AND CO
M/S PAUL CONSTRUCTION
M/S D J ENTERPRISE
M/S RA ENTERPRISE
Bidder Name
M/S D J ENTERPRISE
M/S GOPAL ROY AND CO
THE SUPPLY AGENCY
M/S DHAR AND DHAR
M/S PAUL CONSTRUCTION
M/S RA ENTERPRISE
RAJIB AND CO
M/S SANTOSHI TRADERS
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .