Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹75.6 LAccepted-AOC A 49 10 VINDHIYA COLONY PINOURA NOWROZABAD DIST UMARIA M P | NOWROZABAD | UMARIA | MADHYA PRADESH | 484555 | L1 | Accepted-AOC L1 Bidder | |
| 2 | L2₹79.0 L+₹3.4 L (4.54%)Rejected-Finance CAMP DHANPURI NO 01 DHANPURI DIST SHADOL MP | DHANPURI | SHADOL | MADHYA PRADESH | 484114 | L2 | Rejected-Finance Rejected by Tender Committee due to L2 Bidder | |
| 3 | L3₹81.5 L+₹5.9 L (7.82%)Rejected-Finance GUDHI MINES PALACHAURAI JUNNARDEO DISTRICT CHHINDWARA MADHYA PRADESH 480449 | JUNNARDEO | CHHINDWARA | MADHYA PRADESH | 480449 | L3 | Rejected-Finance Rejected by Tender Committee due to L3 Bidder | |
| 4 | L4₹85.4 L+₹9.8 L (12.9%)Rejected-Finance CAMP VINDHYA COLONY PO PINOURA DIST UMARIA MP | NOWROZABAD | UMARIA | MADHYA PRADESH | 484555 | L4 | Rejected-Finance Rejected by Tender Committee due to L4 Bidder |
Tender Value
₹95.9 L
EMD Value
₹1.2 L
Closing Date
8 Jun 2023, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Area Survey Officer Johilla Area SECL
Area Survey Dept GM OfficeJohilla Area Nowrozabad Dist Umaria MP Pin 484555
Construction of 40 Nos Isolation Stoppings in proposed depillaring panel CM-14 (14 Nos) and CM-15 (26 Nos.), repairing of 05 Nos old isolation stoppings, plastering of 53 Nos of old isolation stoppings and Construction of 01 No. ...at Vindhya UG Mine
2023_SECL_279240_1
SECL/GM/JOH/Survey/ eTender/23-24/02 dt-15/05/2023
Open Tender
Civil Works - Others
Item Rate
365 days
Vindhya UG Mine
5 documents required · 5 mandatory
₹1.2 L
18 Jul 2023
16 May 2023
10 Jun 2023
16 May 2023
8 Jun 2023
17 May 2023
16 May 2023 - 1 Jun 2023
Amount
Item Description/ Heading
Cleaning / removal of debris/ stone from UG galleries and stcking within 50 Mtr. Distance.
Groove cutting manually by using chised/pick-axe in solid coal/stone for foundation, manhole/duggi hole /pits and excavated material to be removed and stacked separately within 50 Mtr. distance. (In Soft Stonel)
Groove cutting manually by using chised/pick-axe in solid coal/stone for foundation, manhole/duggi hole /pits and excavated material to be removed and stacked separately within 50 Mtr. distance. (In Coal)
Carriage of materials by maual labour including loading, unloading and stacking for lead less than 0.50 Km. (Cost for Ist 50 Mtr.) For Lime:
Carriage of materials by maual labour including loading, unloading and stacking for lead less than 0.50 Km. (Cost for Ist 50 Mtr.) For Sand:
Carriage of materials by maual labour including loading, unloading and stacking for lead less than 0.50 Km. (Cost for Ist 50 Mtr.) For Stone aggregate below 40mm nominal size:
Carriage of materials by maual labour including loading, unloading and stacking for lead less than 0.50 Km. (Cost for Ist 50 Mtr.) For Cement :
Carriage of materials by maual labour including loading, unloading and stacking for lead less than 0.50 Km. (Cost for Ist 50 Mtr.) For Steel :
Centering and shuttering including structing, proping etc. and removal of form for: walls (any thickness) including attached pillars, butterses, plinth and string courses etc.
Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforecement- all work upto plinth level : 1:2:4 (1 Cement : 2 Coarse sand : 4 Graded stone aggregate 20 mm nominal size)
12 mm thick cement plaster (1:6, 1 Cement: 6 coarse sand) on brick work up to 5 mtr. And above in UG including curing etc. complete. (excluding cost of materials)
6 mm thick cement plaster (1:4, 1 Cement: 4 coarse sand) on RCC/PCC work up to 5 Mtr. and above in UG including curing etc. complete. (excluding cost of materials)
White washing in UG with lime to give an even shade on Old work/new work. (one coat). (excluding cost of materials)
Material rate : For Sand
Material rate : For Metal/ Stone Chips
Material rate : For Lime :
Material rate : For Cement : (50 Kg./Bag)
Materila Rate : For Twisted Steel bar:
Total impact of GST for the purpose of CTC
SURENDRA KUMAR SINGH
B AND B GROUP
S.V. KURUP
stage.html
html • 0.05 MB
technical_289095.pdf
PDF • 0.29 MB
techsummary_289095.pdf
PDF • 0.29 MB
finance_289095.pdf
PDF • 0.39 MB
BOQ Comparative Chart
xlsx • 0.01 MB
finsummary_289095.pdf
PDF • 0.48 MB
LOANIT02.pdf
PDF • 2.04 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .