| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹46.9 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹50.5 L+₹3.6 L (7.61%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹50.5 L+₹3.6 L (7.68%)Rejected-AOC BHEUSA BANKATA KHAJANI DISTRICT GORAKHPUR | GORAKHPUR | GORAKHPUR | UTTAR PRADESH | L3 | Rejected-AOC L3 | |
| 4 | L4₹53.7 L+₹6.8 L (14.5%)Rejected-AOC | L4 | Rejected-AOC L4 | |
| 5 | L5₹58.6 L+₹11.7 L (25.0%)Rejected-AOC | L5 | Rejected-AOC L5 |
Tender Value
₹65.1 L
EMD Value
₹1.3 L
Closing Date
17 Nov 2023, 12:00 pmClosed
SE ICC MAHOBA
OFFICE OF THE SE ICC MAHOBA
Repair and Renovation Work of Lahchura Dam Inspection House ( Lot-1)
2023_UPIDC_859630_1
04/SE/2023-24
Open Tender
Civil Works
Item Rate
60 days
MAHOBA
nit and tender document
2 documents required · 2 mandatory
₹3,483
₹1.3 L
19 Dec 2023
6 Nov 2023
17 Nov 2023
6 Nov 2023
17 Nov 2023
6 Nov 2023
Amount
The quantities given here under are tentative. They can vary on either side upto any extant,the contractor shall have no claim on account of changes and shall be paid of the quantities as physically met at site reach of work for complete work. (Rate are excluding GST)
Earth work in foundation in Mar, Kabar, Ranker & Kanker mixed soil including all cost of material, labour, T&P etc. complete of work.
Providing and Laying P.C.C. 1:3:6 including all cost of material, labour, T&P etc. complete of work.
Providing and Laying IInd Class Brick Masonary (1:5)CM including all cost of material, labour, T&P etc. complete of work.
12.50mm thick cement plaster (1:5) over brick work including all cost of material, labour, T&P etc. complete of work.
Laying R.C.C. 1:1.5:3 (A-20, M-20) Mix including mechanical mixing, mechanical vibration, curing with all cost of labour, material, T&P etc. complete.
Steel for reinforcement its cutting, bending, binding & placing in position as per approved drawing inclduing all cost of material, labour and T&P required for proper completion of work.
Laying C.C. 1:2:4 including ramming, curing with all cost of labour, material, T&P etc. complete.
Cement Pointing (1:3)CM over stone masonary including all cost of labour, material, T&P etc. complete.
Centering & Shuttering for R.C.C. work including all cost of material, labour, T&P etc. complete of work.
Salwood Chaukhat 120x65 Double rebate including joint treated with favicol properly nailed with one coat of primer, black japan paints on wall side excluding cost of holdfast complete.
Supply and fixing of 40mm (1½") thick commercial quality Sitapur ply or other approved plywood flush shutters including stops and including fixing and adjustment of hinges, bolts, locks handles springs and/or other fittings but excluding their supply and including painting with two coats of black japan on all iron fittings if necessary and including fixing the glass panes with putty and brad glass to be 4mm thick fitting with necessary screw to be supplied departmentally.
Supply & Fixing galvanized mosquitoes proof heavy quality iron wire guage or expended metal heavy quality over windows & including supply of C.P. Teak wood battens 8 cm. x 1 cm. (3"x3/8") and including supply and fixing of necessary screws, all material, labour and tools and plants etc. required for proper completion of the work.
Providing and laying vitrified floor tiles in 600x600mm size with water absorption less than 0.08% and conforming to IS: 15622, of approved make in all colours and shades, laid on 20mm thick cement cortar 1:4, jointing with grey cement slurry @ 3.3 kg/sqm including grouting the joints with white cement and matching pitments etc., complete.
Supply and fixing 6mm (1/4'') China white glazed tiles in flooring or in skirting or dado laid with ratio 1:3 cement and approved coarse sand finished with white cement slurry, jointing and polishing complete, including supply of all material, labour, and tool and plants etc. required for proper completion of work.
Providing and Laying R.C.R. stone Masonary 1:4 CM including all cost of material, labour, T&P etc. complete of work.
Painting Two coat on wall (Burzer) including scraping old paint & cost of all material, labour and T&P required for proper finish of work.
Painting of Two coat Enamel New Jade Green (Burzer make) including scraping old paint & cost of all material, labour and T&P required for proper finish of work.
Policing of two coat Melamine (Burzer make) including Cleaning old surface & cost of all material, labour and T&P required for proper finish of work.
Dismantling existing Brick work /Stone masanory and C.C. including disposal of refuse within a distance of 60m. Includin all cost of material, labour, T&P etc. complete.
M/S G-ENGENIEERS AND CONTRACTOR
M/s Arvind Singh
SUBHASH CHANDRA CONTRACTOR
M/S RADHIKA RAMAN YADAV THEKEDAR
Sri PSSrivastav
M/s Bajrang Construction & Suppliars
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .