Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.2 CrAdmitted-Finance | -39.79% | ₹2.2 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.3 Cr+₹8.9 L (4.10%)Admitted-Finance R O FIRDOUS COLONY BUCHPORA SRINAGAR | SRINAGAR | JAMMU AND KASHMIR | 190001 | -37.32% | ₹2.3 Cr+₹8.9 L (4.10%) | L2 | Admitted-Finance |
| 3 | L3₹2.3 Cr+₹17.6 L (8.09%)Admitted-Finance | -34.92% | ₹2.3 Cr+₹17.6 L (8.09%) | L3 | Admitted-Finance |
| 4 | L4₹2.4 Cr+₹18.5 L (8.52%)Admitted-Finance | -34.66% | ₹2.4 Cr+₹18.5 L (8.52%) | L4 | Admitted-Finance |
| 5 | L5₹2.4 Cr+₹23.2 L (10.7%)Admitted-Finance | -33.37% | ₹2.4 Cr+₹23.2 L (10.7%) | L5 | Admitted-Finance |
Tender Value
₹3.6 Cr
EMD Value
₹7.2 L
Closing Date
2 Jun 2026, 4:00 pmClosed
Executive Engineer RNb Dalgate DIvision Sgr
Executive Engineer RNb Dalgate DIvision Sgr
Upgradation of Infrastructure of Cooperative Training Institute Srinagar.
2026_PWDJK_309645_1
Nit-06 of RNB/1201-1204/2026-27 dtd.09-05-2026
Open Tender
Civil Works
Percentage
540 days
Cooperative Training Institute Srinagar
as per Nit/SBD
8 documents required · 8 mandatory
₹5,500
Executive Engineer RNb Dalgate DIvision Sgr
₹7.2 L
Superintending Engineer RNB Circle Sgr South
2 Jul 2026
9 May 2026
3 Jun 2026
10 May 2026
2 Jun 2026
13 May 2026
12 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil : | 1,052 | Cum | 217.67 | ₹2,28,988.84 |
| 2 | P/L stone soling (Hand packed) stone soling (size 150mm-230mm) before laying of mat, compacted consolidation rammed and filling the voids with fine sand all complete including carriage upto site of work with all head loads. | 236.7 | Cum | 805.08 | ₹1,90,562.44 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 65.7 | Cum | 4,409.24 | ₹2,89,687.07 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement: 3 coarse sand : 6 graded stone aggregate 20 mm nominal size). | 43.66 | Cum | 4,858.98 | ₹2,12,143.07 |
| 5 | Providing and laying in position machine batched and machine mixed design mix M-25grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in- charge. Note: - Cement in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is content considered payable or recoverable separately. All works upto plinth level. | 328.57 | Cum | 6,797.54 | ₹22,33,467.72 |
| 6 | Providing and laying in position machine batched and machine mixed design mix M-25grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in- charge. Note: - Cement in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is content considered payable or recoverable separately. All works above plinth level upto floor V level | 263.12 | Cum | 7,976.31 | ₹20,98,726.69 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form work for: | - | - | - | - |
| 8 | a) Foundations, footings, bases for columns etc. | 310.1 | Sqm | 242.67 | ₹75,251.97 |
| 9 | b) Columns, pillars, piers, abutments, posts and struts. | 560.7 | Sqm | 629.28 | ₹3,52,837.3 |
| 10 | c) Suspended floors, roofs, landings, balconies and access platforms. | 670 | Sqm | 608.64 | ₹4,07,788.8 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.60 MB
Tendernotice_2.pdf
PDF • 1.47 MB
BOQ_1002282.xls
BOQ • 0.60 MB
Ext06cooperative.pdf
PDF • 0.38 MB
CCor06cooperativesigned.pdf
PDF • 0.79 MB
Adddendum06cooperative.pdf
PDF • 0.55 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .