| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.0 LAccepted-AOC ANDHRA POWER HOUSE DIVISION HPSEBL CHIRGAON 171208 | SHIMLA | HIMACHAL PRADESH | 171208 | 1 | Accepted-AOC Awarded to L1. | |
| 2 | 2₹5.4 L+₹41,934.25 (8.43%)Rejected-Finance R O VILL AIMA P O TEHSIL PALAMPUR DISTT KANGRA H P | 2 | Rejected-Finance L2 | |
| 3 | 3₹5.5 L+₹54,238.70 (10.9%)Rejected-Finance | 3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | JAI KRISHAN L3 | subhash chand Govt Contractor L2 | Rajesh Kumar L1 |
|---|---|---|---|---|---|---|
| 1.00Civil works of APH | ||||||
| 1.01 | Excavation in foundation trenches etc, in earth work , lift up to 1.50 mtrs, stacking the excavated soil not more then 3meters clears from the edge of excavation and returning the stacked soil in 15 cm layers when required in to plinths side of foundations etc, consolidating each deposited layers by ramming and watering and disposing of all surplus excavated earth as directed with in a lead of 20.00 Mtrs.(Pick work/ Jumper work 50% each) | 2.5 | P.Cum | 450 ₹1,327.5 | 455 ₹1,342.25 | 400 ₹1,180 Lowest |
| 1.02 | R/R masonry /polygonal ruble masonry ( un coursed / brought to coursed )with hard stone of approved quality in foundation and plinth including leveling up with cement concrete 1:6:12( 1 cement: 6 sand: 12 graded stone aggregate of 20mm nominal size ) at plinth level in cement mortar 1:6 | 34 | P.Cum | 6,500 ₹2,60,780 | 6,500 ₹2,60,780 | 6,000 ₹2,40,720 Lowest |
| 1.03 | Providing/Laying cement concrete 1:2:4 (1 cement 2 sand:4 graded stone aggregate20mm nominal size ) and curing complete excluding cost of form work in foundation &plinth. | 9 | P.Cum | 7,800 ₹82,836 | 7,600 ₹80,712 | 7,370 ₹78,269.4 Lowest |
| 1.04 | Steel work in single section including cutting hoisting fixing in position and applying a priming coat of red lead paint and painting with approved steel paint (two or More coat). In R.S Joist / Channels / angles/tees , square or rectangular hollow tubes etc. complete in all respect. | 940 | P.Kg | 140 ₹1,55,288 | 138 ₹1,53,069.6 | 125 ₹1,38,650 Lowest |
| 1.05 | Fencing with angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 m (minimum), between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earth work and concrete work to be paid for separately). Payment to be made per metre cost of total length of barbed wire used With G.I. barbed wire | 920 | P.Rmtr | 30 ₹32,568 | 22 ₹23,883.2 | 19 ₹20,626.4 Lowest |
| 1.06 | Supplying and fixing welded M.S wire mesh 25mmx 25mmx2mm thick fencing as per design complete by welding electrical plant to any type of standard rails, stringing bolt or welding etc, including applying a priming coat of red lead paint and painting with approved steel paint ( two or more coat) complete in all respect as directed by the Engineer In-charge. | 30 | P. Sqmtr | 540 ₹19,116 | 560 ₹19,824 | 515 ₹18,231 Lowest |
Tender Value
₹4.2 L
EMD Value
₹4,230
Closing Date
9 Oct 2025, 10:30 amClosed
RE Andhra
RE Andhra
As per NIT
2025_HPSEB_116741_1
APHD/2025-25-02
Open Tender
Power/Energy Projects/Products
Item Rate
Work
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
Yes
₹4,230
Yes
22 Oct 2025
3 Oct 2025
9 Oct 2025
3 Oct 2025
9 Oct 2025
3 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .