Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.3 CrAccepted-AOC | ₹9.3 Cr | L1 | Accepted-AOC Being Lowest |
| 2 | L2₹9.3 Cr+₹7.0 L (0.76%)Rejected-Finance | ₹9.3 Cr+₹7.0 L (0.76%) | L2 | Rejected-Finance Other than L1 |
| 3 | L3₹10.1 Cr+₹84.9 L (9.18%)Rejected-Finance | ₹10.1 Cr+₹84.9 L (9.18%) | L3 | Rejected-Finance Other than L1 |
| 4 | L4₹12.5 Cr+₹3.3 Cr (35.4%)Rejected-Finance 70 VARDHMAN NAGAR A P O SHYAM NAGAR AJMER ROAD JAIPUR PIN 342019 | JAIPUR | 342019 | ₹12.5 Cr+₹3.3 Cr (35.4%) | L4 | Rejected-Finance Other than L1 |
| 5 | Rejected-Technical | - | - | Rejected-Technical Bidder not fulfills NIT criteria |
| Sl No | Description | Qty | Unit | M/S Prasad Construction Company L3 | M/S DB TRADING CO L2 | Pioneer Enterprises L4 | SPAAN Infratech L1 |
|---|---|---|---|---|---|---|---|
| 0.00NOTE:- (Applicable for all parts/items/):- The bidders/contractors are advised to read tender document, all drawings & all corrigendum/ amendments and General conditions of contracts before entry/quoting the rates. | |||||||
| 1.00SCHEDULE ‘A’ Part-I(A) (BUILDING & STRUCTURE WORKS) | |||||||
| 1.01 | Construction of OFFICE AND ADMINISTRATION ACCN ,(G+1),RCC framed structure, brick wall construction with ATT and water proofing roof treatment including built in furniture complete all as specified and shown on drawings. | 1 | Each Block | 2,17,67,200 ₹2,17,67,200 Lowest | 2,37,35,000 ₹2,37,35,000 | 2,89,00,000 ₹2,89,00,000 | 2,20,84,555 ₹2,20,84,555 |
| 1.02 | Construction of JCO SINGLE LIVING ACCN, ORs & HAV ETC single storey,RCC framed structure, brick wall construction with ATT and water proofing roof treatment including built in furniture complete all as specified and shown on drawings. | 1 | Each Block | 53,44,510 ₹53,44,510 Lowest | 55,63,800 ₹55,63,800 | 75,25,000 ₹75,25,000 | 55,85,507 ₹55,85,507 |
| 1.03 | Construction of RELIGIOUS INSTITUTE single storey,RCC framed structure, brick wall construction with ATT and water proofing roof treatment including built in furniture complete all as specified and shown on drawings. | 1 | Each Block | 49,16,020 ₹49,16,020 | 42,00,000 ₹42,00,000 Lowest | 49,50,000 ₹49,50,000 | 49,14,599 ₹49,14,599 |
| 1.04 | Construction of GARAGE & PETROL STORE single storey,RCC framed structure, brick wall construction with ATT and water proofing roof treatment including built in furniture complete all as specified and shown on drawings. | 1 | Each Block | 28,08,540 ₹28,08,540 | 17,00,000 ₹17,00,000 Lowest | 20,75,000 ₹20,75,000 | 19,61,215 ₹19,61,215 |
| 1.05 | Construction of CBET, TRADE ALLOCATION TEST & BARRACK FOR CANDIDATE,(G+1),RCC framed structure, brick wall construction with ATT and water proofing roof treatment including built in furniture complete all as specified and shown on drawings. | 1 | Each Block | 1,40,68,410 ₹1,40,68,410 | 81,06,000 ₹81,06,000 Lowest | 1,82,00,000 ₹1,82,00,000 | 1,39,83,114 ₹1,39,83,114 |
| 1.06 | Construction of PARADE CUM ENROLLING SHED single storey with MS truss and roof sheet complete all as specified and shown on drawings.
Note for serial item No. 1.01 to 1.06:
(i) Boring of pile and cast-in-situ of pile including its concrete and reinforcement shall be measured and paid separately under relevant Schedule.
(ii) Cost of pile cap including RCC, reinforcement and form work & its earthwork are included in the quoted amount of building. | 1 | Each Block | 19,53,620 ₹19,53,620 | 8,50,500 ₹8,50,500 Lowest | 17,50,000 ₹17,50,000 | 21,31,299 ₹21,31,299 |
| 2.00 | Lumpsum price workedout by the tenderer for CAST-IN-SITU PILE as listed in Schedule ‘A’ Part-I(B) | 1 | Lump-sum | 74,70,923 ₹74,70,923 | 85,20,000 ₹85,20,000 | 1,01,78,968.4 ₹1,01,78,968.4 | 70,94,120 ₹70,94,120 Lowest |
| 3.00 | Lumpsum price worked out by the bidder/ tenderer for SITE CLEARANCE, SITE DEVELOPMENTS & EARTH WORKS as listed in Schedule 'A' Part-II. | 1 | Lump-sum | 12,77,947.66 ₹12,77,947.66 | 13,50,000 ₹13,50,000 | 11,61,770.6 ₹11,61,770.6 Lowest | 13,37,895 ₹13,37,895 |
Tender Value
₹8.7 Cr
EMD Value
₹7.6 L
Closing Date
30 Apr 2026, 6:00 pmClosed
CE SHILLONG ZONE
HQ CE SHILLONG ZONE, SPREAD EAGLE FALLS, SHILLONG, MEGHALAYA 793011
PROVISION OF OTM ACCN FOR ARO AT JORHAT UNDER GE JORHAT
2026_MES_757941_1
89860/JOR/E8
Open Tender
Civil Works
Lump-sum
540 days
JORHAT
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,000
GE JORHAT
₹7.6 L
25 Jul 2026
26 Mar 2026
2 May 2026
26 Mar 2026
30 Apr 2026
23 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | SCHEDULE ‘A’ Part-I(A) (BUILDING & STRUCTURE WORKS) | - | - | - | - |
| - | Construction of OFFICE AND ADMINISTRATION ACCN ,(G+1),RCC framed structure, brick wall construction with ATT and water proofing roof treatment including built in furniture complete all as specified and shown on drawings. | - | Each Block | - | - |
| - | Construction of JCO SINGLE LIVING ACCN, ORs & HAV ETC single storey,RCC framed structure, brick wall construction with ATT and water proofing roof treatment including built in furniture complete all as specified and shown on drawings. | - | Each Block | - | - |
| - | Construction of RELIGIOUS INSTITUTE single storey,RCC framed structure, brick wall construction with ATT and water proofing roof treatment including built in furniture complete all as specified and shown on drawings. | - | Each Block | - | - |
| - | Construction of GARAGE & PETROL STORE single storey,RCC framed structure, brick wall construction with ATT and water proofing roof treatment including built in furniture complete all as specified and shown on drawings. | - | Each Block | - | - |
| - | Construction of CBET, TRADE ALLOCATION TEST & BARRACK FOR CANDIDATE,(G+1),RCC framed structure, brick wall construction with ATT and water proofing roof treatment including built in furniture complete all as specified and shown on drawings. | - | Each Block | - | - |
| - | Construction of PARADE CUM ENROLLING SHED single storey with MS truss and roof sheet complete all as specified and shown on drawings.
Note for serial item No. 1.01 to 1.06:
(i) Boring of pile and cast-in-situ of pile including its concrete and reinforcement shall be measured and paid separately under relevant Schedule.
(ii) Cost of pile cap including RCC, reinforcement and form work & its earthwork are included in the quoted amount of building. | - | Each Block | - | - |
| - | Lumpsum price workedout by the tenderer for CAST-IN-SITU PILE as listed in Schedule ‘A’ Part-I(B) | - | Lump-sum | - | - |
| - | Lumpsum price worked out by the bidder/ tenderer for SITE CLEARANCE, SITE DEVELOPMENTS & EARTH WORKS as listed in Schedule 'A' Part-II. | - | Lump-sum | - | - |
| - | Lumpsum price worked out by the bidder/ tenderer for ROAD, PATH AND CULVERT as listed in Schedule 'A' Part-III. | - | Lump-sum | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.21 MB
TENDER.pdf
Tender Documents • 7.88 MB
BOQ_848978.xls
BOQ • 0.49 MB
DRAWINGS.pdf
Additional Documents • 28.57 MB
89860dtcorr02.pdf
PDF • 0.23 MB
89860dtcorr01.pdf
PDF • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .