| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹42.5 LAccepted-AOC 3788 SHAH GANJ GB ROAD NEW DELHI 110006 | NORTH | DELHI | 110006 | L1 | Accepted-AOC AOC | |
| 2 | L2₹44.0 L+₹20,135 (0.46%)Rejected-AOC FLAT NO 93 POCKET 03 SECTOR 11 DWARKA NEW DELHI 110 075 | NEW DELHI | SOUTH WEST DELHI | DELHI | 110075 | L2 | Rejected-AOC Rejected other than L1 | |
| 3 | L3₹44.0 L+₹28,364 (0.65%)Rejected-AOC FLAT NO 151 BLOCK NO 1 DIAMOND SQUARE CGHS LTD PLOT NO 13A SECTOR 6 DWARKA NEW DELHI 110075 | NEW DELHI | SOUTH WEST DELHI | DELHI | 110075 | L3 | Rejected-AOC Rejected other than L1 | |
| 4 | L4₹44.9 L+₹1.2 L (2.69%)Rejected-AOC | L4 | Rejected-AOC Rejected other than L1 | |
| 5 | L5₹46.7 L+₹2.9 L (6.71%)Rejected-AOC | L5 | Rejected-AOC Rejected other than L1 |
| Sl No | Description | Qty | Unit | M/S Anand Enterprises L1 | M/S S.K.Electricals L4 | Commercial Traders L6 | BRIJ MOHAN LAL AND CO. L3 | M/S VEDHANT ASSOCIATES L5 | M/S PRADEEP ENTERPRISES L2 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00Schedule-A | |||||||||
| 1.01M&L for Opening of condenser cover of both sides including disconnecting of water pipe line for inlet and outlet of the condenser of each plant. Removing scale/sludge precipitated in the copper tube by push and pull method with iron rod connected with steel wire brush of suitable size as per condenser copper tube size for entire length of condenser by scraping down . Closing both side of condenser and circulating the descaling soulation in all tube of three condensers of each plant through the circulating pump and allows holding it for 30 minutes for chemical descaling. Opning the condenser both sides and clean with iron rod connected with nylon brush of suitable size as per condenser copper tube size at the entire length of condenser to ensure descaling process has been completed then closing the condenser at both end and circulating clean water in all tubes including condenser of each plant and drain out the process will continue till the satisfaction of Engr-in-Charge then fixing new gasket for both ends of the three condenser of each plant tighten with new nut and bolt for the following plants :-(For every three months 01 time descaling to be done due to removal of high TDS ) | |||||||||
| 1.02 | Old Parachute building AC Plant 16 BRD-3 x30 TR Capacity | 3 | Each job | 40,000 ₹1,20,000 | 45,000 ₹1,35,000 | 18,000 ₹54,000 | 35,000 ₹1,05,000 | 7,500 ₹22,500 Lowest | 40,000 ₹1,20,000 |
| 1.03 | Radar Lab AC Plant at 13 BRD-3 x 50 TR Plant Capacity | 3 | Each job | 40,000 ₹1,20,000 | 51,000 ₹1,53,000 | 18,000 ₹54,000 | 35,000 ₹1,05,000 | 7,500 ₹22,500 Lowest | 40,000 ₹1,20,000 |
| 1.04 | Communication Lab AC Plant at 13 BRD- 3 x 75 TR Plant capacity | 3 | Each job | 40,000 ₹1,20,000 | 58,000 ₹1,74,000 | 18,000 ₹54,000 | 35,000 ₹1,05,000 | 10,000 ₹30,000 Lowest | 40,000 ₹1,20,000 |
| 1.05 | Std & Call Lab AC Plant at 13 BRD- 3 x 11 TR Plant Capacity | 3 | Each job | 40,000 ₹1,20,000 | 38,000 ₹1,14,000 | 12,000 ₹36,000 | 35,000 ₹1,05,000 | 7,000 ₹21,000 Lowest | 40,000 ₹1,20,000 |
| 1.06 | New Parachute building at 13 BRD - 3 x 35 TR Plant Capacity | 3 | Each job | 40,000 ₹1,20,000 | 40,000 ₹1,20,000 | 9,500 ₹28,500 | 35,000 ₹1,05,000 | 5,500 ₹16,500 Lowest | 40,000 ₹1,20,000 |
| 2.00 | M&L for Pressure testing for entire system of the following AC plant confirming of all condensers compressor and circulating system with CO2/Nitrogen gas and retain to allow the pressure for three days. If found any leakage or reduction in the scale of pressure to be located and assure the leakage immediately by brazing/soldering/welding to be taken to stop the leakage premanently :-
(a) Old Parachute building AC Plant 16 BRD-3 x30 TR Capacity. (b) Radar Lab AC Plant at 13 BRD-3 x 50 TR Plant Capacity. (c) Communication Lab AC Plant at 13 BRD- 3 x 75 TR Plant capacity. (d) Std & Call Lab AC Plant at 13 BRD- 3 x 11 TR Plant Capacity. (e) New Parachute building at 13 BRD - 3 x 35 TR Plant Capacity. | 9 | Each job | 9,500 ₹85,500 | 18,900 ₹1,70,100 | 8,500 ₹76,500 | 8,000 ₹72,000 Lowest | 9,000 ₹81,000 | 9,000 ₹81,000 |
| 3.00Cleaning cooling tower by applying wire brush and chemicals by removing the deposited impurities such as silt, dust particles mud/ sand inside the dome and around the fins, wiremesh, main shaft etc and other connected items complete all as specified for the following plants- | |||||||||
| 3.01 | Old Parachute building AC Plant 16 BRD-3 x30 TR Capacity. | 3 | Each job | 18,500 ₹55,500 | 8,000 ₹24,000 Lowest | 9,000 ₹27,000 | 16,000 ₹48,000 | 8,000 ₹24,000 Lowest | 20,000 ₹60,000 |
Tender Value
₹45 L
EMD Value
₹90,000
Closing Date
30 Jun 2026, 6:00 pmClosed
GE (AF) Gurgaon No 1
GE (AF) Gurgaon No 1 Near Atul Kataria Chowk Gurgaon
CA NO. GE AF NO.1 / GUR-52 / 2026-27 REPAIR/MAINT OF CENTRALISED AC PLANT OF CAPACITY 3X75TR, 3X55TR, 3X35TR, 3X30TR, 3X12.5TR, DEHUMIDIFIER, AND OTHER CONNECTED WKS AT 13 BRD AND 16 BRD UNDER GE (AF) GURGAON NO-01
2026_MES_770924_1
GE(AF) No 1/GUR-52/2026-27
Open Tender
Miscellaneous Works
Item Rate
180 days
GE (AF) Gurgaon No 1
ALL AS PER NIT
10 documents required · 10 mandatory
₹500
GE (AF) Gurgaon No 1
₹90,000
Yes
13 Aug 2026
10 Jun 2026
2 Jul 2026
10 Jun 2026
30 Jun 2026
23 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Schedule-A | |||||
| 1.01 | M&L for Opening of condenser cover of both sides including disconnecting of water pipe line for inlet and outlet of the condenser of each plant. Removing scale/sludge precipitated in the copper tube by push and pull method with iron rod connected with steel wire brush of suitable size as per condenser copper tube size for entire length of condenser by scraping down . Closing both side of condenser and circulating the descaling soulation in all tube of three condensers of each plant through the circulating pump and allows holding it for 30 minutes for chemical descaling. Opning the condenser both sides and clean with iron rod connected with nylon brush of suitable size as per condenser copper tube size at the entire length of condenser to ensure descaling process has been completed then closing the condenser at both end and circulating clean water in all tubes including condenser of each plant and drain out the process will continue till the satisfaction of Engr-in-Charge then fixing new gasket for both ends of the three condenser of each plant tighten with new nut and bolt for the following plants :-(For every three months 01 time descaling to be done due to removal of high TDS ) | - | - | - | - |
| 1.02 | Old Parachute building AC Plant 16 BRD-3 x30 TR Capacity | 3 | Each job | - | - |
| 1.03 | Radar Lab AC Plant at 13 BRD-3 x 50 TR Plant Capacity | 3 | Each job | - | - |
| 1.04 | Communication Lab AC Plant at 13 BRD- 3 x 75 TR Plant capacity | 3 | Each job | - | - |
| 1.05 | Std & Call Lab AC Plant at 13 BRD- 3 x 11 TR Plant Capacity | 3 | Each job | - | - |
| 1.06 | New Parachute building at 13 BRD - 3 x 35 TR Plant Capacity | 3 | Each job | - | - |
| 2 | M&L for Pressure testing for entire system of the following AC plant confirming of all condensers compressor and circulating system with CO2/Nitrogen gas and retain to allow the pressure for three days. If found any leakage or reduction in the scale of pressure to be located and assure the leakage immediately by brazing/soldering/welding to be taken to stop the leakage premanently :-
(a) Old Parachute building AC Plant 16 BRD-3 x30 TR Capacity. (b) Radar Lab AC Plant at 13 BRD-3 x 50 TR Plant Capacity. (c) Communication Lab AC Plant at 13 BRD- 3 x 75 TR Plant capacity. (d) Std & Call Lab AC Plant at 13 BRD- 3 x 11 TR Plant Capacity. (e) New Parachute building at 13 BRD - 3 x 35 TR Plant Capacity. | 9 | Each job | - | - |
| 3Cleaning cooling tower by applying wire brush and chemicals by removing the deposited impurities such as silt, dust particles mud/ sand inside the dome and around the fins, wiremesh, main shaft etc and other connected items complete all as specified for the following plants- | |||||
| 3.01 | Old Parachute building AC Plant 16 BRD-3 x30 TR Capacity. | 3 | Each job | - | - |
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.27 MB
BOQ_863315.xls
BOQ • 2.55 MB
TenderDocument52.pdf
Tender Documents • 1.50 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .