| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.8 LAccepted-AOC | ₹5.8 L Quoted ₹6.1 L | L1 | Accepted-AOC AOC |
| 2 | 2₹6.2 L+₹5,480.74 (0.89%)Rejected-Finance | ₹6.2 L+₹5,480.74 (0.89%) | 2 | Rejected-Finance DUE TO HIGH RATES |
| 3 | 3₹6.4 L+₹23,251.61 (3.79%)Rejected-Finance AGRA ROAD NEAR RELIANCE OFFICE PATNA | PATNA | BIHAR | ₹6.4 L+₹23,251.61 (3.79%) | 3 | Rejected-Finance DUE TO HIGH RATES |
| 4 | 4₹7.5 L+₹1.3 L (21.9%)Rejected-Finance 134 SHANTI COLONY ETAWAH | ₹7.5 L+₹1.3 L (21.9%) | 4 | Rejected-Finance DUE TO HIGH RATES |
Tender Value
₹8.6 L
EMD Value
₹86,000
Closing Date
28 Jan 2026, 12:00 pmClosed
EXECUTIVE ENGINEER
C.D.-2, P.W.D., AGRA
Under special repair work, the road from village Budhana Block Barauli Ahir to Nagla Ishwari via Nagla Gole.
2026_CEAGR_1108543_2
78/10A/2025-26 dt 14.01.2026
Open Tender
Civil Works
Lump-sum
60 days
AGRA
Please refer Tender documents.
2 documents required · 2 mandatory
₹770
₹86,000
Yes
AGRA
13 Apr 2026
22 Jan 2026
28 Jan 2026
22 Jan 2026
28 Jan 2026
22 Jan 2026
23 Jan 2026
Providing, laying, spreading and compacting stone aggregates of 22.4-53 mm sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.Sr No. 4.8 Ref No. 405/2 (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.)
Providing and applying tack coat with bitumen VG-10 using bitumen pressure distributor at the rate of 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503. Sr No. 5.2 Ref No. 503 (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.)
Providing, laying and rolling of open - graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates using VG-10 grade Bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a smooth wheeled roller 8-10 tonne capacity, finished to required level and grades. (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.)
Providing and laying seal coat by mechanical means with VG-10 grade bitumen sealing the voids in a bituminious surface laid to the specified levels grades and cross fall using Type C as per technical specification Clause 510. (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.)
Construction of un-reinforced, plain cement concrete pavement thickness as per disign, over a prepared sub base with 43 grade cement or any other type as per Clause 1501.2.2 M-30 (Grade), coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction, expansion, construction and constructionl joints, applying debonding strips, primer, sealant, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14 days, curing compund (where specified) and water finishing to lines and grade as per drawing and technical specification clause 1501. (For Agra) as per SOR Ch. 5 Item No. 12 (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.)
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site. spreading, grading to required slope and compacted to meet requirement of Table 300.2 as per Technical Specification Clause 303.1. as per SOR Ch. 5 Item No. 21 (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.)
Construction of embankment with approved material obtained from availble land as permitted and approved by Engineer-in-Charge and as per Technical Specitaion Clause 301.3.4.1. with all lifts and leads,1000M spreading, grading to required slope and compacting to meet requirement of Tables 300.1and 300.2 as per Technical Specification clause 301.5
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.SI No- 12.1 etc. complete as per SOR Ch. 6 No- 1 (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.)
PCC 1:3:6 in Foundation Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing. etc. complete as per SOR Ch. 6 No- 3 (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.)
Class-150 (Non Modular) brick work in 1:4 cement and Coarse sand mortar in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of the work (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.)
Laying and fixing of N.P.-3 350mm dia Hume pipe in proper position as directed by E/I including cartage of pipes/collars upto 30m distance (labour only) excluding cost of pipes/collars. (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.)
Pointing on brick work with cement mortar 1:2 (1Cement : 2 Coarse Sand) (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.)
Providing and laying cement concrete in 1:2:4 (1 Cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) and curing complete, Including cost of form work. In Foundation and floors. (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.)
12mm Cement plaster with cement mortar in proportion of 1:4 cement & coarse sand of single coat for interior plastering upto floor two level including internal rounded angles chamfers, and rounded angles not exceeding 80mm. In girth and finished even and smooth. (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.)
Note - 1. GST will be paid as per rule. 2. Labour Cess 1% included in above rates and same will be deducted at the time of payment. 3. Bitumen/ Emulsion will be issued to the contractor as per Schedule "C"
stage.html
html • 0.05 MB
techsummary_2046555.pdf
BOQ Comparative Chart
xlsx
finsummary_2046555.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.99 MB
T1.pdf
Tender Documents • 1.96 MB
BOQ_2046555.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .