| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAccepted-AOC | ₹1.5 Cr | L1 | Accepted-AOC Admitted |
| 2 | L2₹1.5 Cr+₹23,750.01 (0.16%)Rejected-AOC | ₹1.5 Cr+₹23,750.01 (0.16%) | L2 | Rejected-AOC Rejected |
Tender Value
₹1.5 Cr
EMD Value
₹1.5 L
Closing Date
10 Jan 2025, 3:00 pmClosed
The Project Director DRDA Krishnagiri
DRDA Krishnagiri
Krishnagiri DT Uthangarai Block Under NABRD XXX 2024-2025 Strengthening of the road from Keelkuppam- Thannerpanthal road to Perumalnaickanpatti at Kallavi (R-154) Package No_ TN 04 KRI 63
2024_RDTN_515115_1
RocNo_8058_2023_R3_18_12_2024
Open Tender
Civil Works - Roads
Item Rate
180 days
Uthangarai
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹1.5 L
DRDA Krishnagiri
13 May 2025
28 Dec 2024
10 Jan 2025
28 Dec 2024
10 Jan 2025
28 Dec 2024
31 Dec 2024
Amount
Strengthening of the road from Keelkuppam- Thannerpanthal road to Perumalnaickanpatti Km 0/0-2/810 H/o.Kallavi (R-154)
Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.
Picking existing BT Surface including all labour and materials etc complete
Providing and Laying Gravel to 100mm Compacted thick including cost & conveyance of Gravel From Approved sources to work site including labour for Spreading, watering and comp-acting by power roller to achieve the required proctor density at 100 % compaction.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WBM/WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat WMM Surface (treated with primer) at 2.5 KG of RS-1 Bitumen Emulsion / 10 Sqm including labour for spraying, hire charges for bitumen sprayer etc., comp
Providing and laying Bituminous Macadam based on job mix formula mixed in hot mix plant of drum type in one layer for overlay as shown in drawing using paving Bitumen 60/70 penetration grade as per IS 73 amd aggregate conforming to grading
BITUMINOUS CONCRETE 25MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Providing wearing coat for CC Pavement Ch 2079-2275
Construction of Un-reinforced, dowel jointed at expansion and construction Joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other types as per Clause 1501.2.2 M30(Grade), Coarse an
Road Marking with hot applied thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface
Provision of 15 nos. rumble strips covered with premium bituminous carpet, 15-20mm high at centre at approved locations to control speed, marked with white strips of road marking paint
Provision of KM Stone
Provision of HM Stone
Provision for Name Board & Citizen Information Board
Provision for Sign Board
Maintenance
For 1st year maintenance
For 2nd year maintenance
For 3rd year maintenance
For 4th year maintenance
For 5th year maintenance
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Alagesan Contractor (BID ID -1228527)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .