Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹19.7 LAdmitted-Finance | +0.00% | ₹19.7 L | L1 | Admitted-Finance |
| 2 | L2₹19.9 L+₹21,886.18 (1.11%)Admitted-Finance | +1.11% | ₹19.9 L+₹21,886.18 (1.11%) | L2 | Admitted-Finance |
| 3 | L3₹20.2 L+₹44,363.88 (2.25%)Admitted-Finance | +2.25% | ₹20.2 L+₹44,363.88 (2.25%) | L3 | Admitted-Finance |
| 4 | L4₹20.3 L+₹59,151.84 (3.00%)Admitted-Finance | +3.00% | ₹20.3 L+₹59,151.84 (3.00%) | L4 | Admitted-Finance |
| 5 | Rejected-Technical | - | - | - | Rejected-Technical Reject |
Tender Value
₹19.7 L
EMD Value
₹19,717
Closing Date
15 Apr 2026, 3:00 pmClosed
EE RWS ZP AHILYANAGAR
EE RWS ZP AHILYANAGAR
PROVIDING SANITATION FACILITIES MEASURES AT DISTRICT RESOURSE CENTRE AKOLNER TAL AND DIST. AHILYANAGAR
2026_AHMED_1293055_1
ZP/RWS/TENDER/2025-26/2nd call
Open Tender
Civil Works
Percentage
180 days
AHILYANAGAR
AS PER NIT
2 documents required · 2 mandatory
₹1,180
₹19,717
Yes
23 Jun 2026
7 Apr 2026
16 Apr 2026
7 Apr 2026
15 Apr 2026
7 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Sub Estimate A :Toilets and Reparing Work
Excavation for foundation / pipe trenches in earth, soils of all types, sand, gravel and soft murum, including removing the excavated material upto a distance of 50 metres and lifts as below, stacking and spreading as directed, normal dewatering,preparing the bed for foundation and excluding backfilling, etc. complete. (Bd-A-1/259) | - | Cum. | - | - |
| - | Dismantling brick masonry in lime or cement mortar and stacking the materils as directed with all leads, lifts etc | - | Cum. | - | - |
| - | Removing doors and windows with frames and stacking the materials as directed with all leads, lifts etc. complete | - | Nos | - | - |
| - | Removing cement tiles, or marble or polished shahabad floor or dado without bed concrete including stacking the materials as directed with all leads, lifts etc. complete | - | Sqm | - | - |
| - | Dismantling the R.C.C. Work 1:2:4 and sorting out the materials such as steel etc. as directed and stacking them within the specified lead as directed etc. complete. | - | Cum. | - | - |
| - | Providing dry/ trap/ granite/ quartzite/ gneiss rubble stone soling 15 cm to 20 cm thick including hand packing and compacting,etc.complete.(Bd-A-12/264) | - | Cum. | - | - |
| - | Providing and laying in situ Cement Concrete M-15 of trap/ granite / quartzite / gneiss metal for foundation and bedding including bailing out water, form work, compaction, curing, etc. complete. (Cement 5.90 bags / cum) a) In PCC M-100 | - | Cum. | - | - |
| - | Providing and casting in situ C.C. of trap /granite/ quartzite / gneiss metal of approved quality for RCC works as per detailed drawings and designs or as directed by Engineer-in-charge including normal dewatering, centering, form work, compaction, finishing the formed surfaces with C.M. 1:3 of sufficient minimum thickness to give a smooth and even surface wherever necessary or roughening if special finish is to be provided and curing, etc.complete. (By weigh batching and mix design for M-250 and M-300 only. Use of L&T, A.C.C., Ambuja, Birla Gold, Manikgad, Rajashree, etc. cement is permitted.) (Excluding M.S. or Tor reinforcement) | - | Cum. | - | - |
| - | Providing and casting in situ C.C. of trap / granite/ quartzite / gneiss metal of approved quality for RCC works as per detailed drawings and designs or as
directed by Engineer-in-charge including normal dewatering, centering, form work, compaction, finishing the formed surfaces with C.M. 1:3 of sufficient minimum thickness to give a smooth and even surface wherever
necessary or roughening if special finish is to be provided and curing, etc. complete. (By weigh batching and mixdesign for M-250 and M-300 only. Use of L&T, A.C.C., Ambuja, Birla Gold,Manikgad, Rajashree, etc. cement ispermitted.) (Excluding M.S. or Torreinforcement)
In RCC M-200 | - | Cum. | - | - |
| - | Filling in plinth and floors murum bedding in trenches with approved murum from excavated materials from foundation 15cm to 20cm layers including watering and compaction complete | - | Cum. | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.26 MB
BOQ_2222175.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .