Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.7 LAccepted-AOC | ₹19.7 L | L1 | Accepted-AOC Lowest Amount Quoted |
| 2 | L2₹20.0 LRejected-AOC 44 621708 | PERAMBALUR | TAMIL NADU | 621708 | ₹20.0 L | L2 | Rejected-AOC Highest Amount Quoted |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance CHENNAI | CHENNAI | TAMIL NADU | 600001 | - | - | Not Admitted-Fee/PreQual/Technical/Finance Others-As per proceeding no:107/2026B4 DATED:09.01.2026 Your monetary limit for bidding value exceed. |
| Sl No | Description | Qty | Unit | RAJENDIRAN P S L1 | KATHIRAVAN R L2 |
|---|---|---|---|---|---|
| 1.00 | Construction of Drainage from Adidravider Street Mariyamman Kovil to Varagur Road Culvert at Pudhuvettakudi Panchayat Earth work excavation in hard gravelly soil with initial lead and lift as per SS20 B for Foundation in narrow trench. | 162.23 | m3 | 198 ₹32,121.54 | 200 ₹32,446 |
| 2.00 | Plain cement concrete in C.C.1:4:8 mix using 40mm ISS HBG Metal including cost and conveyance of all materials to site and all charges etc., | 43.26 | m3 | 5,629 ₹2.4 L | 5,750 ₹2.5 L |
| 3.00 | Supplying and erecting steel centering for sides and soffits including all labour charges etc., complete | 995.66 | m2 | 546 ₹5.4 L | 555 ₹5.5 L |
| 4.00 | Plain cement concrete in C.C.1:3:6 mix using 20mm ISS HBG Metal including cost and conveyance of all materials to site and all charges etc., | 113.71 | m3 | 6,383 ₹7.3 L | 6,450 ₹7.3 L |
| 5.00 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete | 100 | kg | 91 ₹9,100 | 92 ₹9,200 |
| 6.00 | R C.C.1:1.5:3 mix using 20mm ISS HBG Metal including cost and conveyance of all materials to site and all charges etc., | 0.91 | m3 | 9,365 ₹8,522.15 | 9,450 ₹8,599.50 |
| 7.00 | Plastering in c.m(1:4) to 20 mm thick including cost and coveyance to site and all labour charges etc complete | 185.4 | m2 | 582 ₹1.1 L | 600 ₹1.1 L |
| 8.00 | Provision for Nameboard Charges | 1 | nos | 1,000 ₹1,000 | 1,125 ₹1,125 |
| 9.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 3,00,888 ₹3.0 L | 3,05,528 ₹3.1 L |
Tender Value
₹19.7 L
EMD Value
₹20,000
Closing Date
23 Dec 2025, 3:00 pmClosed
BDO BP Veppur
Block Development office Veppur
Construction of Drainage from Adidravider Street Mariyamman Kovil to Varagur Road Culvert at Pudhuvettakudi Panchayat
2025_RDTN_634902_1
1331/2025/A2 16-12-2025 NNT
Open Tender
Civil Works
180 days
Block Development office Veppur
As per Tender Document
2 documents required · 2 mandatory
₹0
₹20,000
Yes
11 Mar 2026
20 Dec 2025
23 Dec 2025
20 Dec 2025
23 Dec 2025
20 Dec 2025
Construction of Drainage from Adidravider Street Mariyamman Kovil to Varagur Road Culvert at Pudhuvettakudi Panchayat Earth work excavation in hard gravelly soil with initial lead and lift as per SS20 B for Foundation in narrow trench.
Plain cement concrete in C.C.1:4:8 mix using 40mm ISS HBG Metal including cost and conveyance of all materials to site and all charges etc.,
Supplying and erecting steel centering for sides and soffits including all labour charges etc., complete
Plain cement concrete in C.C.1:3:6 mix using 20mm ISS HBG Metal including cost and conveyance of all materials to site and all charges etc.,
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete
R C.C.1:1.5:3 mix using 20mm ISS HBG Metal including cost and conveyance of all materials to site and all charges etc.,
Plastering in c.m(1:4) to 20 mm thick including cost and coveyance to site and all labour charges etc complete
Provision for Nameboard Charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.09 MB
BOQ_759726.xls
BOQ • 0.26 MB
Part.pdf
Tender Documents • 0.23 MB
Download all tender documents and submit your bid