Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹28.7 LAccepted-AOC | ₹28.7 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹28.8 LRejected-Finance | ₹28.8 L | L2 | Rejected-Finance High price |
| Sl No | Description | Qty | Unit | MR.VIJAAY, CONTRACTOR L1 | MS SURIYA CONSTRUCTION L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation in all clauses of soil with initial lead and lift except hard rock requiring blasting as per SS 20B for foundation etc., complete. | 205.01 | Cum | 263 ₹53,917.63 | 270 ₹55,352.70 |
| 2.00 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum. | 55.05 | Cum | 5,633 ₹3.1 L | 5,650 ₹3.1 L |
| 3.00 | Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement including conveyance of all materials to site and proper centering etc complete. | 0.01 | Cum | - | - |
| 4.00 | For Shuttering - Below Sill Level | 155.25 | Sqm | 547 ₹84,921.75 | 550 ₹85,387.50 |
| 5.00 | For Shuttering - Above Sill Level | 305.23 | Sqm | 547 ₹1.7 L | 550 ₹1.7 L |
| 6.00 | For Deck Slab Centering | 102.04 | Sqm | 1,095 ₹1.1 L | 1,100 ₹1.1 L |
| 7.00 | Cement concrete 1:3:6 mix using 40mm ISS HBG metal including all cost and conveyance and all labour charges etc., complete. | 213.54 | Cum | 5,903 ₹12.6 L | 5,910 ₹12.6 L |
| 8.00 | Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum. | 48.15 | Cum | 9,243 ₹4.5 L | 9,250 ₹4.5 L |
| 9.00 | Supplying, Fabricating and placing in position of MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with standard specification. | 4,291.5 | Kg | 91.63 ₹3.9 L | 92 ₹3.9 L |
| 10.00 | Cement concrete 1:2:4 mix using 20mm ISS HBG metal including all cost and conveyance and all labour charges etc., complete. | 6.43 | Cum | 6,924 ₹44,521.32 | 6,950 ₹44,688.50 |
Tender Value
Refer Docs
EMD Value
₹34,400
Closing Date
4 Feb 2026, 3:00 pmClosed
Block Development officer (B.Pt), Kalakad
Block Development office, Kalakad
Construction of Minor Bridge Sengalakurchi supply channel near thathaparai in Malaiyadiputhur Panchayat
2026_RDTN_646560_1
A2/4113/2025 Minds
Open Tender
Chemicals/Minerals
Malaiyadipudur
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹34,400
3 Mar 2026
23 Jan 2026
4 Feb 2026
23 Jan 2026
4 Feb 2026
2 Feb 2026
Earth work excavation in all clauses of soil with initial lead and lift except hard rock requiring blasting as per SS 20B for foundation etc., complete.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement including conveyance of all materials to site and proper centering etc complete.
For Shuttering - Below Sill Level
For Shuttering - Above Sill Level
For Deck Slab Centering
Cement concrete 1:3:6 mix using 40mm ISS HBG metal including all cost and conveyance and all labour charges etc., complete.
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum.
Supplying, Fabricating and placing in position of MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with standard specification.
Cement concrete 1:2:4 mix using 20mm ISS HBG metal including all cost and conveyance and all labour charges etc., complete.
Supplying and filling with excavated earth including all cost and conveyance and all labour charges for watering, ramming etc., complete.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.64 MB
BOQ_775011.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid