Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29.5 LAccepted-AOC | ₹29.5 L Quoted ₹2.9 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹29.5 LRejected-AOC | ₹29.5 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | MOHAN L2 | Sivalingam L1 |
|---|---|---|---|---|---|
| 1.00Strengthening of Road From Manguppam Colony to Manguppam BG Road Km 0/0 - 0/800 (R - 246) | |||||
| 2.00 | Clearing the scrub jungles including cutting the scrubs and removing away from site etc complete | 860.52 | Sqm | 6 ₹5,163 | 6 ₹5,163 |
| 3.00 | Picking 5 Cm to 10 cm of existing wornout BT / WBM Surface sectioning in all labour charges etc complete (1/3) | 725.83 | Sqm | 23.2 ₹16,839 | 23 ₹16,694 |
| 4.00 | Earthwork excavation in all classes of soils and subsoils including shoring and strutting with initial lead and lift etc complte, as per MOST specification asper SS20 A. | 258.16 | Cum | 140 ₹36,142 | 140 ₹36,142 |
| 5.00 | Collection and supply of Carted Earth from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS | 96.81 | Cum | 146.2 ₹14,154 | 146 ₹14,134 |
| 6.00 | Providing & Laying, spreading and compacting graded stone aggregates to Wet Mix Macadam 150mm thick specification including premixing the materials with water at OMC in mechanical mix plant carriage of mixed material by tipper to site laying in uniform layers with pavers in sub base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material, labour charges rentals for machinery, fuel and all other incidental charges etc, completed as per clause of MORTH Rev-5 | 325.32 | Cum | 2,358.67 ₹7.7 L | 2,358.67 ₹7.7 L |
| 7.00 | Applying Prime coat over WMM surface using 7 kgs of bitumen emulsion (SS1) per 10 sqm for preparatory to another bituminous construction over it including cost of bitumen emulsion including conveyance | 2,168.8 | Sqm | 84.81 ₹1.8 L | 84.81 ₹1.8 L |
| 8.00 | Applying tack coat over WMM surface using 2.50 kgs of bitumen emulsion per 10 sqm including cost of bitumen emulsion which will be supplied departmentally at section stores cost of which will be recovered at the issue rate as per the special conditions | 2,177.5 | Sqm | 19.61 ₹42,701 | 19.61 ₹42,701 |
| 9.00 | BC 25/30/40mm Thick (Grade-II) Using VG30 Bitumen Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, | 54.44 | Cum | 11,336.56 ₹6.2 L | 11,336.56 ₹6.2 L |
| 10.00 | Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous SurfaceProviding and laying of hot applied Thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 100mm, | 72 | Cum | 890 ₹64,080 | 890 ₹64,080 |
Tender Value
₹3 L
EMD Value
₹30,000
Closing Date
29 Sept 2025, 3:00 pmClosed
BLOCK DEVELOPMENT OFFICER (BP)
BLOCK DEVELOPMENT OFFICE KAVERIPAKKAM
Strengthening of Road From Manguppam Colony to Manguppam BG Road Km 0/0 - 0/800(R-246)
2025_RDTN_609470_1
A1/1235/2025
Open Tender
Civil Works
BLOCK DEVELOPMENT OFFICE
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹30,000
Yes
17 Dec 2025
27 Sept 2025
29 Sept 2025
27 Sept 2025
29 Sept 2025
27 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid