| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹43.8 LAccepted-AOC HOUSE NO 15 GANESH MANDIR ROAD SATGAON GUWAHATI ASSAM 781 171 | KAMRUP METRO | ASSAM | 781171 | ₹43.8 L Quoted ₹44.0 L | L1 | Accepted-AOC Lowest Bidder |
| 2 | L2₹47.8 L+₹3.8 L (8.62%)Rejected-Finance P O NARANGI PIN 781026 ASSAM | NARANGI | KAMRUP METRO | ASSAM | 781026 | ₹47.8 L+₹3.8 L (8.62%) | L2 | Rejected-Finance Other than lowest bidder |
| 3 | L3₹47.9 L+₹3.9 L (8.81%)Rejected-Finance MES COLONY KUMBHIGRAM AIRPORT CACHAR ASSAM 788109 | KUMBHIGRAM | CACHAR | ASSAM | 788109 | ₹47.9 L+₹3.9 L (8.81%) | L3 | Rejected-Finance Other than lowest bidder |
| 4 | L4₹48.5 L+₹4.5 L (10.3%)Rejected-Finance OPPOSITE MERCEDES SHOWROOM NALAPARA BIHARBARI GUWAHATI 781029 ASSAM | RI BHOI | MEGHALAYA | 781029 | ₹48.5 L+₹4.5 L (10.3%) | L4 | Rejected-Finance Other than lowest bidder |
| Sl No | Description | Qty | Unit | M/S Narayan Chandra Das L2 | M/S K D ENTERPRISE L1 | Goswami Traders L3 | M/S P&R CONSTRUCTIONS L4 |
|---|---|---|---|---|---|---|---|
| 1.00 | Surface excavation not exc 30cm deep and averaging 15cm deep and getting out in soft/loose soil complete all as specified and directed. | 350 | Sqm | 80 ₹28,000 | 80 ₹28,000 | 115 ₹40,250 | 30 ₹10,500 Lowest |
| 2.00 | Excavation in trenches not exc 1.50 m wide and not exc 1.50 m deep for foundation or for shafts, wells cesspits,man holes etc not exc 10 Sqm on plan and n exc 1.5m in depth and getting out in soft / loose soil complete all as specified and as directed. | 206.03 | Cum | 350 ₹72,110.5 | 250 ₹51,507.5 | 220 ₹45,326.6 | 210 ₹43,266.3 Lowest |
| 3.00 | Excavation in trenches n.exc 1.5m wide and depth exceeding 1.5 m and not exceeding 3.00m beyond first 1.50m and getting out in soft / loose soil etc complete all as specified and as directed. | 1.08 | CUM | 380 ₹410.4 | 350 ₹378 | 220 ₹237.6 | 210 ₹226.8 Lowest |
| 4.00 | Returning , filling in of excavated soil, including spreading , levelling , watering and well ramming in layers not exc 25 cm thick complete all as specified and as directed. | 107.84 | Cum | 50 ₹5,392 Lowest | 80 ₹8,627.2 | 95 ₹10,244.8 | 120 ₹12,940.8 |
| 5.00 | Removing excavated material (Soils) to a distance exc 250 m but n exc 500m a and depositing whered directed at a level n exc 1.5m above the starting point complete all as specified and dircted. | 132.19 | Cum | 130 ₹17,184.7 | 75 ₹9,914.25 Lowest | 95 ₹12,558.05 | 170 ₹22,472.3 |
| 6.00 | Material and labour for plain cement concrete (1:4:8) type D-2, (using 40 mm graded stone aggregate) as in foundation, filling and mass concrete complete all as specified and directed. | 21.1 | Cum | 5,000 ₹1,05,500 | 4,500 ₹94,950 Lowest | 5,150 ₹1,08,665 | 5,700 ₹1,20,270 |
| 7.00 | Material and labour for hardcore of broken stones or boulders of gauge n.exc 63mm deposited,spread & levelled in layers 100mm thick, watered & rammed to a true surfaces complete all as specified and directed. | 4 | Cum | 2,200 ₹8,800 | 1,900 ₹7,600 Lowest | 2,600 ₹10,400 | 2,700 ₹10,800 |
| 8.00 | Material and labour for reinforced cement concrete M-25 design mix as in foundations, including rafts, footings, foundation beams; plinth beams bases for columns, etc. basement slabs, under-reamed piles and mass concrete complete all as specified and directed. | 80.33 | Cum | 6,700 ₹5,38,211 Lowest | 7,500 ₹6,02,475 | 6,955 ₹5,58,695.15 | 8,400 ₹6,74,772 |
| 9.00 | Material and labour for reinforced cement concrete M-25 design mix as in columns, pillars, piers, posts and struts complete all as specified and directed. | 18.21 | Cum | 6,800 ₹1,23,828 Lowest | 7,500 ₹1,36,575 | 7,150 ₹1,30,201.5 | 8,000 ₹1,45,680 |
| 10.00 | Material and labour for reinforced cement concrete M-25 design mix as in beams, seimic bands, cantilevers, bressumers and lintels complete all as specified as directed. | 17.09 | Cum | 6,800 ₹1,16,212 Lowest | 7,500 ₹1,28,175 | 7,350 ₹1,25,611.5 | 8,000 ₹1,36,720 |
Tender Value
₹48 L
EMD Value
₹96,000
Closing Date
25 Feb 2026, 6:00 pmClosed
GE Narangi
GE Narangi C/o 99 APO
ADDITION OF BOUNDARY WALL OF 222 ABOD (OFFRS MESS) AND PROVN OF MAIN ENTRANCE GATE FOR STATION CANTEEN NAARANGI UNDER GE NARANGI
2026_MES_751376_1
8159/B/E8
Open Tender
Civil Works
Item Rate
180 days
Guwahati
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
GE Narangi
₹96,000
Yes
2 May 2026
5 Feb 2026
27 Feb 2026
5 Feb 2026
25 Feb 2026
18 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Surface excavation not exc 30cm deep and averaging 15cm deep and getting out in soft/loose soil complete all as specified and directed. | 350 | Sqm | - | - |
| 2 | Excavation in trenches not exc 1.50 m wide and not exc 1.50 m deep for foundation or for shafts, wells cesspits,man holes etc not exc 10 Sqm on plan and n exc 1.5m in depth and getting out in soft / loose soil complete all as specified and as directed. | 206.03 | Cum | - | - |
| 3 | Excavation in trenches n.exc 1.5m wide and depth exceeding 1.5 m and not exceeding 3.00m beyond first 1.50m and getting out in soft / loose soil etc complete all as specified and as directed. | 1.08 | CUM | - | - |
| 4 | Returning , filling in of excavated soil, including spreading , levelling , watering and well ramming in layers not exc 25 cm thick complete all as specified and as directed. | 107.84 | Cum | - | - |
| 5 | Removing excavated material (Soils) to a distance exc 250 m but n exc 500m a and depositing whered directed at a level n exc 1.5m above the starting point complete all as specified and dircted. | 132.19 | Cum | - | - |
| 6 | Material and labour for plain cement concrete (1:4:8) type D-2, (using 40 mm graded stone aggregate) as in foundation, filling and mass concrete complete all as specified and directed. | 21.1 | Cum | - | - |
| 7 | Material and labour for hardcore of broken stones or boulders of gauge n.exc 63mm deposited,spread & levelled in layers 100mm thick, watered & rammed to a true surfaces complete all as specified and directed. | 4 | Cum | - | - |
| 8 | Material and labour for reinforced cement concrete M-25 design mix as in foundations, including rafts, footings, foundation beams; plinth beams bases for columns, etc. basement slabs, under-reamed piles and mass concrete complete all as specified and directed. | 80.33 | Cum | - | - |
| 9 | Material and labour for reinforced cement concrete M-25 design mix as in columns, pillars, piers, posts and struts complete all as specified and directed. | 18.21 | Cum | - | - |
| 10 | Material and labour for reinforced cement concrete M-25 design mix as in beams, seimic bands, cantilevers, bressumers and lintels complete all as specified as directed. | 17.09 | Cum | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.42 MB
BOQ_841528.xls
BOQ • 9.84 MB
8159Tender.pdf
Tender Documents • 0.73 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .