Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.4 LAdmitted-Finance | ₹16.4 L | L1 | Admitted-Finance |
| 2 | L2₹17.0 LAdmitted-Finance | ₹17.0 L | L2 | Admitted-Finance |
| 3 | L3₹24.7 LAdmitted-Finance | ₹24.7 L | L3 | Admitted-Finance |
| 4 | Rejected-Technical 0 MELROSE BYPASS NETAJI COLONY ALIGARH ALIGARH UTTAR PRADESH 202001 | ALIGARH | UTTAR PRADESH | 202001 | - | - | Rejected-Technical Not Eligible for part 1 |
| Sl No | Description | Qty | Unit | ALOK KUMAR SINGH L2 | Hindustan Electric Work L3 | ANCHAL CONSTRUCTION L1 |
|---|---|---|---|---|---|---|
| 1.00Part - A ( Material) Following Material Supplied by the Contractor:- | ||||||
| 1.01 | LT Clamp | 30 | Nos. | 300 ₹9,000 | 200 ₹6,000 | 250 ₹7,500 |
| 1.02 | LT Shackle Insulator | 30 | Nos. | 50 ₹1,500 | 100 ₹3,000 | 45 ₹1,350 |
| 1.03 | Supply a of Copper L Piece for 250 KVA T/F | 18 | Nos. | 900 ₹16,200 | 1,000 ₹18,000 | 890 ₹16,020 |
| 1.04 | Supply a of Copper L Piece for 400 KVA T/F | 4 | Nos. | 900 ₹3,600 | 1,100 ₹4,400 | 890 ₹3,560 |
| 1.05 | Supply of HDPE Pipe for laying of 11KV (As per requirement) | 100 | Mtr. | 850 ₹85,000 | 750 ₹75,000 | 840 ₹84,000 |
| 1.06 | Aluminum Lug(Long Barrel) | 26 | Nos. | 250 ₹6,500 | 150 ₹3,900 | 240 ₹6,240 |
| 1.07 | Holding Clamp with Nut & Bolt | 50 | Nos. | 250 ₹12,500 | 200 ₹10,000 | 240 ₹12,000 |
| 1.08 | Tainless unit & Installation (As Per site Requriment/Estimate) | 2 | Nos. | 42,000 ₹84,000 | 45,000 ₹90,000 | 41,500 ₹83,000 |
| 1.09 | Nut & Bolt | 8 | Kg | 300 ₹2,400 | 150 ₹1,200 | 290 ₹2,320 |
Tender Value
₹12.8 L
EMD Value
₹13,000
Closing Date
8 Apr 2026, 5:00 pmClosed
SE, EDC, Ayodhya
SE, EDC Civil Lines, Ayodhya.
127 H(F)(W)/2025-26
2026_MVVNL_1132900_1
127 H(F)(W)/2025-26
Open Tender
Electrical Works
Ayodhya
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,540
SE, EDC, Ayodhya
₹13,000
21 Apr 2026
2 Apr 2026
9 Apr 2026
2 Apr 2026
8 Apr 2026
2 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1Part - A ( Material) Following Material Supplied by the Contractor:- | ||||||
| 1.01 | LT Clamp | 30 | Nos. | - | - | BI01010001010000000000000515BI0100001113 |
| 1.02 | LT Shackle Insulator | 30 | Nos. | - | - | BI01010001010000000000000515BI0100001114 |
| 1.03 | Supply a of Copper L Piece for 250 KVA T/F | 18 | Nos. | - | - | BI01010001010000000000000515BI0100001115 |
| 1.04 | Supply a of Copper L Piece for 400 KVA T/F | 4 | Nos. | - | - | BI01010001010000000000000515BI0100001116 |
| 1.05 | Supply of HDPE Pipe for laying of 11KV (As per requirement) | 100 | Mtr. | - | - | BI01010001010000000000000515BI0100001117 |
| 1.06 | Aluminum Lug(Long Barrel) | 26 | Nos. | - | - | BI01010001010000000000000515BI0100001118 |
| 1.07 | Holding Clamp with Nut & Bolt | 50 | Nos. | - | - | BI01010001010000000000000515BI0100001119 |
| 1.08 | Tainless unit & Installation (As Per site Requriment/Estimate) | 2 | Nos. | - | - | BI01010001010000000000000515BI0100001120 |
| 1.09 | Nut & Bolt | 8 | Kg | - | - | BI01010001010000000000000515BI0100001121 |
stage.html
html • 0.03 MB
techsummary_2114697.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.31 MB
TenderForm.pdf
Tender Documents • 0.95 MB
BOQ_2114697.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid