Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.4 LAdmitted-Finance | ₹16.4 L | L1 | Admitted-Finance |
| 2 | L2₹17.0 L+₹64,915.50 (3.97%)Admitted-Finance | ₹17.0 L+₹64,915.50 (3.97%) | L2 | Admitted-Finance |
| 3 | L3₹24.7 L+₹8.4 L (51.2%)Admitted-Finance | ₹24.7 L+₹8.4 L (51.2%) | L3 | Admitted-Finance |
| 4 | Rejected-Technical 00 BALAJI ENTERPRISES NEW ROAD NEW ROAD RATLAM MADHYA PRADESH 457001 | RATLAM | MADHYA PRADESH | 457001 | - | - | Rejected-Technical Not Eligible for part 1 |
| Sl No | Description | Qty | Unit | ALOK KUMAR SINGH L2 | Hindustan Electric Work L3 | ANCHAL CONSTRUCTION L1 |
|---|---|---|---|---|---|---|
| 1.00Part - A ( Material) Following Material Supplied by the Contractor:- | ||||||
| 1.01 | LT Clamp | 30 | Nos. | 300 ₹9,000 | 200 ₹6,000 Lowest | 250 ₹7,500 |
| 1.02 | LT Shackle Insulator | 30 | Nos. | 50 ₹1,500 | 100 ₹3,000 | 45 ₹1,350 Lowest |
| 1.03 | Supply a of Copper L Piece for 250 KVA T/F | 18 | Nos. | 900 ₹16,200 | 1,000 ₹18,000 | 890 ₹16,020 Lowest |
| 1.04 | Supply a of Copper L Piece for 400 KVA T/F | 4 | Nos. | 900 ₹3,600 | 1,100 ₹4,400 | 890 ₹3,560 Lowest |
| 1.05 | Supply of HDPE Pipe for laying of 11KV (As per requirement) | 100 | Mtr. | 850 ₹85,000 | 750 ₹75,000 Lowest | 840 ₹84,000 |
| 1.06 | Aluminum Lug(Long Barrel) | 26 | Nos. | 250 ₹6,500 | 150 ₹3,900 Lowest | 240 ₹6,240 |
| 1.07 | Holding Clamp with Nut & Bolt | 50 | Nos. | 250 ₹12,500 | 200 ₹10,000 Lowest | 240 ₹12,000 |
| 1.08 | Tainless unit & Installation (As Per site Requriment/Estimate) | 2 | Nos. | 42,000 ₹84,000 | 45,000 ₹90,000 | 41,500 ₹83,000 Lowest |
| 1.09 | Nut & Bolt | 8 | Kg | 300 ₹2,400 | 150 ₹1,200 Lowest | 290 ₹2,320 |
Tender Value
₹12.8 L
EMD Value
₹13,000
Closing Date
8 Apr 2026, 5:00 pmClosed
SE, EDC, Ayodhya
SE, EDC Civil Lines, Ayodhya.
127 H(F)(W)/2025-26
2026_MVVNL_1132900_1
127 H(F)(W)/2025-26
Open Tender
Electrical Works
Item Wise
Ayodhya
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,540
SE, EDC, Ayodhya
₹13,000
21 Apr 2026
2 Apr 2026
9 Apr 2026
2 Apr 2026
8 Apr 2026
2 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Part - A ( Material) Following Material Supplied by the Contractor:- | |||||
| 1.01 | LT Clamp | 30 | Nos. | - | - |
| 1.02 | LT Shackle Insulator | 30 | Nos. | - | - |
| 1.03 | Supply a of Copper L Piece for 250 KVA T/F | 18 | Nos. | - | - |
| 1.04 | Supply a of Copper L Piece for 400 KVA T/F | 4 | Nos. | - | - |
| 1.05 | Supply of HDPE Pipe for laying of 11KV (As per requirement) | 100 | Mtr. | - | - |
| 1.06 | Aluminum Lug(Long Barrel) | 26 | Nos. | - | - |
| 1.07 | Holding Clamp with Nut & Bolt | 50 | Nos. | - | - |
| 1.08 | Tainless unit & Installation (As Per site Requriment/Estimate) | 2 | Nos. | - | - |
| 1.09 | Nut & Bolt | 8 | Kg | - | - |
stage.html
html • 0.03 MB
techsummary_2114697.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.31 MB
TenderForm.pdf
Tender Documents • 0.95 MB
BOQ_2114697.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .