Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance AT NIUNTI PO KARANJA PS KARANJIA DIST KEONJHAR | KARANJIA | KEONJHAR | ODISHA | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹6.7 L
EMD Value
₹6,656
Closing Date
28 Jun 2026, 5:00 pmClosed
Executive Officer, Balasore Municipality
Executive Officer, Balasore Municipality
Constn. of 1st floor of DIC market Complex in W.N-09
2026_ORULB_131363_39
BM_08_2026_27
Open Tender
Civil Works - Roads
Percentage
60 days
Balasore Municipality
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,000
₹6,656
Yes
22 Jun 2026
10 Jun 2026
29 Jun 2026
10 Jun 2026
28 Jun 2026
10 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | R.C.C. Work with M-20 using 20 mm & down grade HGCB Stone chips incluiding hoisting, laying,curing etc. complete but excluiding cost of steel reinforcement in 1st floor | 1.57 | Cum | 6,556.87 | ₹10,301.17 |
| 2 | Supplying , fitting , fixing & placing uncoating bar reinforcement complete as per drawing & technical specification complete in 1st floor | 1.73 | Qntl | 9,402.61 | ₹16,249.12 |
| 3 | Rigid and smooth centring,shuttering for RCC works in Roof Slab for 1st floor | 17.96 | Sqm | 923.03 | ₹16,573 |
| 4 | 12mm thk Plastering in CM (1:6) in 1st floor | 407.98 | Sqm | 200.58 | ₹81,832.63 |
| 5 | 6mm thk Plastering in CM (1:4) to RCC Surface in 1st floor | 104.33 | Sqm | 221.94 | ₹23,153.89 |
| 6 | 2.5cm thk grading concrete in (1:2:20 using 6mm size hgcb chips incl all cost in 1st floor | 113.75 | Sqm | 405.69 | ₹46,147.24 |
| 7 | Colouring with 2 coat plastic emulsion paint over 1 coat primer in new wall in 1st floor | 512.31 | Sqm | 189.66 | ₹97,163.77 |
| 8 | Supplying and Fixing of Rolling Shutter in 1st floor | 1,440 | Kg | 115 | ₹1,65,600 |
| 9 | Fixing Tiles in floor treads or steps and landing on 25mm thk Cement Mortar in (1:1) incl all cost incl vitrified tile cost | 104.33 | Sqm | 1,449.7 | ₹1,51,239.95 |
| 10 | Provision for Electrifcation | 1 | No | 52,000 | ₹52,000 |
stage.html
html • 0.05 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.79 MB
BOQ_595341.xls
BOQ • 0.23 MB
3rdcorrigendum.pdf
PDF • 0.56 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .