Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.3 LAccepted-AOC ASANSOL T P ROAD USHAGRAM BARDHAMAN WEST BENGAL 713303 | ASANSOL | BARDHAMAN | WEST BENGAL | 713303 | L1 | Accepted-AOC L1 | |
| 2 | Rejected-Technical KHANDRA BARDHAMAN 713363 WEST BENGAL INDIA | KHANDRA | BARDHAMAN | WEST BENGAL | 713363 | - | Rejected-Technical Not as per NIT and L2 | |
| 3 | Rejected-Technical 59 R G S ROAD USHAGRAM DURGAMANDIR ASANSOL BARDHAMAN 713303 WEST BENGAL INDIA | ASANSOL | BARDHAMAN | WEST BENGAL | 713303 | - | Rejected-Technical Not as per NIT and L3 |
Tender Value
₹4.9 L
EMD Value
₹6,100
Closing Date
21 Oct 2024, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Area Engineer(EnM)
Sodepur Area
Repairing and Rewinding of 350kW,3.3kV,1487RPM, Kirloskar make Sq. Cage Induction motor Installed with K-1 series pump of Pit Bottom pumping station of Chinakuri Mine-I Colliery under Sodepur Area.
2024_ECL_319018_1
ECL/SDPA/EnM/24/e-Tender/853 Date.01.10.2024
Open Tender
Miscellaneous Works
Item Rate
15 days
Sodepur Area
Please refer Tender documents.
5 documents required · 5 mandatory
₹6,100
2 May 2025
9 Oct 2024
22 Oct 2024
9 Oct 2024
21 Oct 2024
9 Oct 2024
9 Oct 2024 - 14 Oct 2024
Amount
Items Description
Repairing and Rewinding of 350kW,3.3kV,1487RPM, Kirloskar make Sq. Cage Induction motor Installed with K-1 series pump of Pit Bottom pumping station of Chinakuri Mine-I Colliery under Sodepur Area.
Dismantling of Complete Motor
Cleaning & Decarbonizing of core slots
Supply of New Electrolyte grade Supper Enamelled Copper Strips
Insulation with F class insulation materials of stator coil with varnish after proper backing
Supply of tape suitable for HT motor
Supply of Varnish suitable for HT motor
Supply of thinner suitable for HT motor
Taking out of the coils from the stator slots
Formation of coils with the converted DG Copper Conductor
Interlayer insulation of the coil to be done with Kaftans tape
Labour charges for insulation of overhauling portion of the coils with GMP & GM tape
Inserting of the coils into the core slots in chronological manner
Supply and Fixing of the silicon based glass wedge
Fabrication of both sides bearing housing of the motor after making pattern MS casting machining appropriate size as per original size
Final assembling of the motor in all respect and testing by appropriate supply voltage
Less: Old scrap value.
Overhead cost & Others
Add: CMPF @ 12%
Add: Bonus @ 8.33%
Add: Pension @ 7%
Both side Transportation and Handling Charge
Total impact of GST for the purpose of CTC
ROY ENTERPRISE
KEKA ARMATURE REPAIRING SHOP
techsummary_330670.pdf
PDF • 1.82 MB
finsummary_330670.pdf
PDF • 1.82 MB
E1529787.pdf
PDF • 1.82 MB
BOQ Comparative Chart
xlsx • 0.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .