Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 1442 WAZIR NAGAR KOTLA MUBARAKPUR NEW DELHI DELHI 110003 | NEW DELHI | DELHI | 110003 | Admitted-Finance |
| 2 | Rejected-Technical | Rejected-Technical No experience |
| 3 | Rejected-Technical 25 KARAMBHUMI SAMASGARH ROAD SAMAGARH BHOPAL MADHYA PRADESH 462044 | BHOPAL | MADHYA PRADESH | 462044 | Rejected-Technical No experience |
| 4 | Rejected-Technical | Rejected-Technical No experience |
Tender Value
₹69 L
EMD Value
₹1.4 L
Closing Date
13 Jan 2025, 5:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The Director, ICAR-NRRI Cuttack
ICAR-NRRI Cuttack
Construction of Rapid Generation Advancement Facility (Speed Breeding) of existing structure at NRRI, Cuttack-6
2024_DARE_841162_1
40/Civil/Tech/2024-25
Open Tender
Civil Works
Works
45 days
ICAR-NRRI CUTTACK
Please refer Tender documents.
12 documents required · 12 mandatory
₹0
₹1.4 L
Yes
28 Jan 2025
23 Dec 2024
14 Jan 2025
23 Dec 2024
13 Jan 2025
23 Dec 2024
Amount
Rapid Generation Advancement Facility (Speed Breeding) of existing structure at NRRI, Cuttack-6.
Dismantling work of Existing structure Size: 57’ x 47’ (Included many Chambers with Civil Construction)
Earth work in ordinary soil for foundation within 1.5 mt. initial lift & 50 m initial lead
Sand filling in foundation & plinth, well-watered and rammed
PCC (1:4:8) using 2.5 to 4cm size crusher broken granite metal
PCC work in C.C. (1:2:4) using 12 to 20mm crusher broken hard granite chips.
RCC work in C.C. (1:2:4) using 12 to 20mm crusher broken hard granite chips.
Supply, Cutting, bending & binding of M S rod for RCC work.
Brick work with Fly ash bricks in cement mortar (1:6).
12mm thick cement plastering in prop (1:4) CM
Rigid and Smooth centering & shuttering for Concreting work.
Supply, fitting and fixing Vitrified floor tiles in floors of size 600mm x600mm of approved make conforming to IS13755 laid on 20mm thick (1:4) CM & finishing joints with matching grout complete etc.
Electric wiring for entire facility: All wires will be of copper and desired load and switches (Anchor/Hovels) imported make, extra switches also provided as standby, each feature has own electric line MCB (Anchor/Hovels) and will be under ground in PVC pipe complete set with A grade work. complete set.
RGA (Rapid Generation Advance) facility for existing Structure Dismantling chamber & Upgrading chamber work Total Area - 234sqm In Divided 3 Chamber, one Corridor & one Screen House • Chamber No 1 – Climate Control Chamber Size 12m x 6m Length : 15.6m Width : 15 m Center Height : 4.8 m Side Height : .4 m Shape : Venlo • Chamber No 2- Dark Chamber Size 6m x 6m • Chamber No 3 – Climate Control Chamber Size 6m x 6m • Existing Cold Chamber shifting to Corridor area size 9.4’ x9.4’ x 8’(LxWxH) • Screen House Size: 3.6m x15m • Corridor Area 12m x3m Length : 15.6m Width : 15 m Center Height : 4.8 m Side Height : .4 m Shape : Venlo 1. STRUCTURE: Frame: All galvanized steel is used and design as per IS875 standards to take withstand of wind speed 100 km. /hour. End wall and side wall framing Aluminum corner trims, aluminum ridge bar and Galvanized gutter trim Brackets & fasteners as required to assemble frame. Pipe: Pipes sections to be used for different Structural Member should be as follows: Columns: 80 mm × 50 mm in 2mm thick hot dip galvanized pipe. Top Rafter 40mm x 40mm x2mm Trusses: 50mm x 50mm x 2mm thick. with 10mm bar Gutter: 6m Long, 248mm wide and 1.5mm thick molding hot galvanized steel plate GIRT: 50 mm x 50mm x2 mm Purlins: 40mm ×40mmx 2mm thick. All G.I pipes are galvanized. Nuts and other metallic parts: This includes all the elements required for joining and water tighten components (such as fittings, clamps, screws, and nuts plated against corrosion). Pre -entry room & doors: Ante Room/Vestibule: The chamber should have a specific Pre-Entry Room of size- 3m x3 m x2.43m (L×W×H), made by polycarbonate sheet 6 mm and galvanized tubular frame, where all the other spare items can be stored/ dumped out qty 1
Sliding Door for Pre-Entry Room, Chamber 1 ,2 & 3: size 1.2 m. wide & 2m. Tall single door complete with polycarbonate sheet glazing, top & bottom tracks, jambs, flashings & installation hardware. Qty 5 Sliding Door for Screen House: 1 m. wide & 2m. Tall single door complete with polycarbonate sheet glazing, top & bottom tracks, jambs, flashings & installation hardware. Qty1
Cladding: Size 15.6m x 15 =234 sq.m complete structure Roof, end walls, & sidewalls of the Chamber -sets and buffer room for rigid covering 6mm thick clear multiwall high quality polycarbonate sheet, Aluminum Profile, EPDM gasket, Silicon sealant, and accessories. Roof and Side wall covers by 6mm; UV stabilized clear polycarbonate sheet (double layered). Details. Are giving below: • Sheet thickness 6mm • Structure 2 TS • Approx. Weight g/m2 1300 • Light Transmission 81% • K Valve 3 False ceiling for Chamber No 2 • False ceiling: Providing and fixing of 6mm-8mm insulated panel with frame. • Blackout System for Inside the Chamber Cladding of Screen House: Top Structure Covered with 6 mm PC Sheet & all three Side Covered with GI Net
Side Ventilation mechanism & windows Chamber No 1 :- One side of Chamber No 1 Manual opening & closing PC Sheet Framing with gear mechanism, driving shaft ,rack pinion ,covered with 40 mesh nylon net from inside to prevent insect entry inside the chamber , generally used during power failure , windows lift up to 1 m wide & length as per chambers length Chamber No 3 - Ventilation: widow Type ventilation for Climate Control Chamber Size 2’ x2’ qty 4
Manual Grid Mechanism: for Dark Chamber &Climate Control Chamber No 3 Grid Mechanism for light movement in RGA Facility chambers: Grid mechanism customized modules with Manual, swive pulley, special cable drum with S.S. wire rope. (each chamber 1 grid mechanism)
HMI Panel One Unit for Both chamber 2 & 3 Control system which can monitor and Temperature, Humidity and light, It maintains chamber climate by optimum controlling of chamber equipment’s like cooling fan, heaters, ventilation, internal screen lights etc. It is also including switching system for operating chamber equipment with suitable relays, contractors, and safety devices - 7”/10” HMI with Feather buttons, Data logging Feature - PLC system with inbuilt analog module for sensor connection - Multi- Set point programming. - Multistage cooling /heating control • Sensor for Temperature & RH: Range: Range 0-50 °C and 0- 100%. , Type : 4- 20 mA • Sensor for Light Sensor: Range: 0- 20 KLUX, Type: 4-20 mA. • Light Spectrum control 10-100% OUTPUTS: • Light Control: Control Cycle: ON/ OFF, multiple stages • Accuracy: ±10 sec/day Temperature controller: Cooling Control: • Control type: PID, Multiple stage control • Temp. Range: 0.1 to 59.9°C. • Accuracy: ±1°C. • Hysteresis: 0.4°C Heaters Control: • Control Type: ON/OFF, Multiple stages • Temp. Range: 0.1 to 59.9°C. • Hysteresis: 0.4°C Humidity Control • Control type: ON/OFF • Range: 50% to 90%. (Real RH: ±2%. ±1 digit (at 45%).
Control system for Chamber no 1 & Cold Chamber Microclimate Control Panel for Temperature, Humidity, and light operating option and, volt meter, RYB indicator etc. • Technical feature of Temperature Control System • Accuracy: ±1°C.
Cooling System for Dark Chamber no. 2 & Climate Control Chamber no. 3 Air conditioner units should be provided, which are responsible to maintain the required temperature range 25ºC to 35ºC ± 1ºC (Required Air conditioning Industrial Branded AC with higher (5*) saving of electricity, make Bluestar/Carrier/Hitachi or equivalent) For Dark Chamber No 2: 4 ton or more capacity, one or more number as per requirement For Climate control chamber 3: 4 ton or more capacity, two or more number as per requirement Cooling System for Cold Chamber Air conditioner one or more units as per requirement (2 Ton or more capacity) should be provided, which should be responsible to maintain the required temperature range 4ºC to 35ºC ± 1ºC
Evaporative Cooling System for Climate Control Chamber No 1 5ft height x lengthwise evaporative cooling pad complete with all necessary framing material of Aluminum required supporting distribution & returning piping. • Gutters, down spout end caps & drip pan, plumbing kit as per Required pump 440 volt - 3 phase 50 cycles, Drilled PVC piping cap, pad retainer, all suspension hardware. • Metalflashingsasrequiredtosealpadtoventopening,4"thick Evaporative cooling pad material. • Pad Area: lengthwise × 5’ x 4’’ (w x h x Thickness) • Construction Material: Aluminum Profiles: Tray Sides, Top Etc. Plastic Profiles: Water Distribution tray. Cooling Media: 100mm thick • At velocities of 1 to 3 M/s to give efficiency from 60 to 95%. Filtration: 25 to 55mm viscous filter for 30 m efficiency. Miscellaneous: Fasteners, Galvanized, Rivet- aluminum. 40 Mesh Nylon: for extra protection from dust, fitted behind the pad. Slow Speed Axial Flow Fan (branded) - 36 " single speed belt driven exhaust fan, 440V, 50 cycles, 3 phase) with Louvers opening /closing assembly Qty2
Energy saving screen system: Reflective, thermal-aluminum-screen silver with Manual operated expanding & retracting mechanism for Climate Control Chamber No 1 & 3
TURBO HUMIDIFIER FOGGER Heavy Duty for Dark Chamber no 2 Based on Ultraschall technology, the Turbo Humidifier Fogger generates very fine water particles of about 0.01 to 0.5µ which are plant friendly. The Fogger should be free from nozzles which get choked more often because of certain compounds present even in filtered water. The fogger should be also free from double or single splash plates. By using Turbo Humidifier Fogger the pants should get excellent fine fog for growth. 1. It should be very helpful for the growth of plants. 2. The Humidifier should increase the humidity level and thus enhances the growth of cuticle in plants inside the chamber • Temp. 15°C to 35°C, • RH up to 90%. It should be operated i.e. can be automatically switched on-off by attaching it with any of humidity controllers and setting desired humidity on the controller. R.O. (reverse water osmosis) should be only used. Specification Voltage : 230 V AC Phase : Single Power : 600watt Fog out let Hole : 110 mm Number of Out let Hole : 01 Size : 665 x 375 x 400mm (L x W x H) RO Water capacity : 8L/H Fog Particle : .1 to .5 µ0
Humidification system for chamber no 3 Ultrafine fogging system with SS nozzles, hi - pressure pump, screen filter, polymer water tank and accessories. Ultra humidifier with RO System for micro fogging & ultra-fogging
Fogging system for chamber No 1: Fogging Nozzles, lateral pipe with supporting wire, pump with screen filter, water tank 1000 Ltr etc.
Benching System for Chamber no 2 (Dark Chamber) qty 3 • Top Moveable Bench: Size:1.2m wide x 3.5m long x 18" height Legs galvanized steel (legs base fixed in concrete) 2 Roller spacers (galvanized) Steel expended metal bench top approximate 3/4"- 1" diamond shape & G. I Supporting frame Benches. Bench: Size:1.2m wide x 3.5m long x 18" height Benching System for Chamber 3 (Climate Control Chamber) qty 4 • Benching with Caster wheel: Size:1m wide x 2 m long x 24" height Legs galvanized steel expended metal bench top approximate 3/4"- 1" diamond shape & G. I Supporting frame Benches. Bench: Size:1m wide x 2 m long x 24" height.
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .