Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-AOC | ₹1.1 Cr | L1 | Accepted-AOC PROPER |
| 2 | L2₹1.2 Cr+₹6.2 L (5.40%)Rejected-AOC GOROIMARI BAZAR TUKRAPARA CHHAYGAON KAMRUP R ASSAM | CHHAYGAON | KAMRUP R | ASSAM | ₹1.2 Cr+₹6.2 L (5.40%) | L2 | Rejected-AOC Not Qualified for AOC |
| 3 | L3₹1.2 Cr+₹7.6 L (6.67%)Rejected-AOC | ₹1.2 Cr+₹7.6 L (6.67%) | L3 | Rejected-AOC Not Qualified for AOC |
| 4 | L4₹1.3 Cr+₹14.8 L (13.0%)Rejected-AOC | ₹1.3 Cr+₹14.8 L (13.0%) | L4 | Rejected-AOC Not Qualified for AOC |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹1.4 Cr
EMD Value
₹2.9 L
Closing Date
20 Jun 2020, 2:00 pmClosed
Chief Engineer,W.R.Deptt
O/O Chief Engineer Water Resources Department Chandmari
Immediate measures to recoupment of Brahmaputra dyke on Left Bank in between Sontoli Charali and Rangapani (in bewteen Ch. 44.50 km and Ch. 46.50km) under SDRF for 2019-20.
2020_DoWR_17859_1
GHY.WEST/2019-20/SDRF-II/I
Open Tender
Civil Works
Works
60 days
MIRZA
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,000
The Executive Engineer, Ghy. West W R Division
₹2.9 L
Yes
7 Nov 2020
10 Jun 2020
20 Jun 2020
10 Jun 2020
20 Jun 2020
12 Jun 2020
Amount
Earth work in embankment by truck carriage in ordinary/normal soil excluding sandy and rocky soil free from roots & vegetation and filling in uniform layers not exceeding 22cm. thick including ploughing or roughening or benching the seats, removing all debries, breaking clods up to 2.5cm cube, dressing as per design section including payment of forest royalty if any, etc. complete as directed.(10% deduction will be made from the section measured quantities of the completed and compacted on account of shrinkage) For initial lead beyond ½ Km and up to 4.00 Km and for all lifts
Turfing with grass sods of largest possible rectangles of 12 cm. minimum thickness placed closely including dressing earth pagging with Jati bamboo split, watering till the grass grows for a lead up to 90m and all lifts.
Ashit Roy
SULTAN MAMUD
MOONMOON ROY
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .