Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 LAccepted-Finance | L1 | Accepted-Finance Accepted |
| Sl No | Description | Qty | Unit | Sri Venkatakrishna Engineering Works L1 |
|---|---|---|---|---|
| 1.00 | Excavation for pole upto 8.00m length by using JCB/Manual | 19 | per pit | 500 ₹9,500 Lowest |
| 2.00 | Erection of RCC, REC, PSC poles upto 8.00m length by using Crane / Manual | 19 | per pole | 550 ₹10,450 Lowest |
| 3.00 | Excavation for pole above 8.00m length by using JCB/Manual | 13 | per pit | 600 ₹7,800 Lowest |
| 4.00 | Erection of RCC, REC, PSC poles above 8.00m length by using Crane / Manual | 13 | per pole | 650 ₹8,450 Lowest |
| 5.00 | Excavation of Stay pit of 4.5 ' to 5 ' depth using JCB / Manual | 7 | per pit | 500 ₹3,500 Lowest |
| 6.00 | Erection of stay set complete with fixing up stay wire Eye, Bow, Guy Shackle, Binding etc. | 7 | Each set | 500 ₹3,500 Lowest |
| 7.00 | V cross arm 3.5 feet /11KV Tapping "X" arm | 18 | per Loc | 210 ₹3,780 Lowest |
| 8.00 | Fixing of LT 3 phase cross arm | 1 | per Cross arm | 120 ₹120 Lowest |
| 9.00 | Fixing of LT S phase cross arm | 5 | per Cross arm | 80 ₹400 Lowest |
| 10.00 | Fixing of shackle with MP | 21 | per | 50 ₹1,050 Lowest |
Tender Value
Refer Docs
Closing Date
25 Sept 2026, 2:00 pmClosed
EE Sholinghur
EE Sholinghur
Works Contract for Kaveripakkam section
2026_EB_703976_1
EESHR/016/2026-2027
Limited
Electrical Works
Works
180 days
Kaveripakkam
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Exempted
29 Sept 2026
11 Sept 2026
28 Sept 2026
11 Sept 2026
25 Sept 2026
11 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation for pole upto 8.00m length by using JCB/Manual | 19 | per pit | - | - |
| 2 | Erection of RCC, REC, PSC poles upto 8.00m length by using Crane / Manual | 19 | per pole | - | - |
| 3 | Excavation for pole above 8.00m length by using JCB/Manual | 13 | per pit | - | - |
| 4 | Erection of RCC, REC, PSC poles above 8.00m length by using Crane / Manual | 13 | per pole | - | - |
| 5 | Excavation of Stay pit of 4.5 ' to 5 ' depth using JCB / Manual | 7 | per pit | - | - |
| 6 | Erection of stay set complete with fixing up stay wire Eye, Bow, Guy Shackle, Binding etc. | 7 | Each set | - | - |
| 7 | V cross arm 3.5 feet /11KV Tapping "X" arm | 18 | per Loc | - | - |
| 8 | Fixing of LT 3 phase cross arm | 1 | per Cross arm | - | - |
| 9 | Fixing of LT S phase cross arm | 5 | per Cross arm | - | - |
| 10 | Fixing of shackle with MP | 21 | per | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.63 MB
BOQ_846118.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .