Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹24.5 LAdmitted-Fee/PreQual/Technical/Finance | -36.84% | ₹24.5 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹24.7 L+₹19,027.41 (0.78%)Admitted-Fee/PreQual/Technical/Finance | -36.35% | ₹24.7 L+₹19,027.41 (0.78%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹24.8 L+₹32,230.10 (1.31%)Admitted-Fee/PreQual/Technical/Finance | -36.01% | ₹24.8 L+₹32,230.10 (1.31%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹25.6 L+₹1.0 L (4.18%)Admitted-Fee/PreQual/Technical/Finance | -34.20% | ₹25.6 L+₹1.0 L (4.18%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹26.1 L+₹1.5 L (6.24%)Admitted-Fee/PreQual/Technical/Finance | -32.90% | ₹26.1 L+₹1.5 L (6.24%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹38.8 L
EMD Value
₹77,660
Closing Date
1 Jun 2026, 6:00 pmClosed
Executive Engineer Sgr Core
Office of the Executive Engineer Sgr Core
Construction of Single Storey Three (03) Room HDOs Office building at Zakura FPN Nursery
2026_PWDJK_310525_1
06 of RNB//Sgr-Core/2026-27
Open Tender
Civil Works
Percentage
120 days
Srinagar
Please refer NIT
3 documents required · 3 mandatory
₹1,100
Executive Engineer Sgr Core
₹77,660
11 Jun 2026
21 May 2026
2 Jun 2026
21 May 2026
1 Jun 2026
21 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling roofing including ridges, hips valleys and gutters etc., and stacking the material within 50 meters lead of .G.S. Sheet | 28.57 | SQM | 125.35 | ₹3,581.25 |
| 2 | Dismantling wood work in frames, trusses, purlins and rafters upto 10 meters span and 5 meters height including stacking the material within 50 meters lead Of sectional area 40 sqcm. and above | 3.04 | cum | 3,488.65 | ₹10,605.5 |
| 3 | Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 meters lead : Of area of 3 sqm. and below | 7 | each | 285.25 | ₹1,996.75 |
| 4 | Demolishing brick work manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge In cement mortar | 18.35 | CUM | 1,458.45 | ₹26,762.56 |
| 5 | Demolishing stone rubble masonry manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge In lime mortar | 9.84 | CUM | 820.4 | ₹8,072.74 |
| 6 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge: 1:3:6 or richer mix (i/c equivalent design mix) | 3.57 | CUM | 1,725.2 | ₹6,158.96 |
| 7 | Earth work in bulk excavation by MECHANICAL means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) Including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil. | 70.37 | CUM | 187.3 | ₹13,180.3 |
| 8 | Supply and laying stone solling graded material ( Quarry ) I/C Consolidation in layers ,I/C Cost and carraiage of materials from source to the site. | 54.69 | CUM | 950 | ₹51,955.5 |
| 9 | Supplying and filling in plinth with fine sand under floors including, watering, ramming, consolidating and dressing complete. | 20.16 | CUM | 1,204.5 | ₹24,282.72 |
| 10 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement: 4 coarse sand: 8 graded stone aggregate 40 mm nominal size). | 13.55 | CUM | 5,202.9 | ₹70,499.3 |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.58 MB
BOQ_1004431.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .