Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹61.8 LAccepted-Finance HAMIRPUR ROAD NEAR BUS STAND UNA DISTT UNA HP | UNA | HIMACHAL PRADESH | 174301 | ₹61.8 L | L1 | Accepted-Finance Lower amount quoted |
| 2 | L2₹62.4 L+₹60,964.20 (0.99%)Rejected-Finance | ₹62.4 L+₹60,964.20 (0.99%) | L2 | Rejected-Finance Higher amount quoted |
| 3 | L3₹67.5 L+₹5.7 L (9.30%)Rejected-Finance BANIKHET NAVEEN KUMAR BANIKHET CHAMBA HIMACHAL PRADESH 176303 | CHAMBA | HIMACHAL PRADESH | 176303 | ₹67.5 L+₹5.7 L (9.30%) | L3 | Rejected-Finance Higher amount quoted |
| 4 | L4₹73.8 L+₹12.0 L (19.4%)Rejected-Finance VILLAGE AMLEHAR P O JANDAUR TEHSIL JASWAN DISTT KANGRA HP | ₹73.8 L+₹12.0 L (19.4%) | L4 | Rejected-Finance Higher amount quoted |
| Sl No | Description | Qty | Unit | Naveen Kumar L3 | Vivek Dhiman L2 | SS ENGINEERING WORKS L1 | Apex Engineering L4 |
|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in foundation trenches upto all depths in all classification of earth work such as pick work, jumper work,Chiselling or wedying out of soft and hard rock as blasting is prohibited, saturated soil including bailing out or pumping of water i/c cutting of bitumenous/concreate surface where ever required in all lifts i/c trimning and dressing of sides, levelling of beds to correct grade i/c shoring, strufing, blanking, timebering and dewatering wherever requiredstacking usable and unusable and unusable material/soil separetely and after laying jointing and testing of pipes (for pipes, pipe dust, chambers, etc.) returning the usable soil in 15cm layers by ramming asn watering and then disposing of all surplus excarted soil/unusable material as directed within all leads and lists and i/c cost as divertion of traffic, nightsigns boads, fixing coutions boards crossing ones trenchs for access to houses fencing etc. completeing in all respect within all leads and lifts as per direction of Engineer in Charge. | 1,994.62 | Cum | 250 ₹4,98,654 | 220 ₹4,38,815.52 | 158 ₹3,15,149.33 Lowest | 200 ₹3,98,923.2 |
| 2.00 | Providing and laying cement concrete 1:4:8 (1cement: 4 sand: 8 graded stone aggregate 40mm nominal size) and curing complete excluding cost of form work in foundation and plinths in all leads and lift and to the entire satisfaction of Engineer-in-charge | 6.54 | Cum | 5,100 ₹33,354 | 4,200 ₹27,468 Lowest | 4,200 ₹27,468 Lowest | 6,500 ₹42,510 |
| 3.00 | Providing and laying cement concrete 1:6:12 (1cement: 6 sand) 12 graded stone aggregate 40mm nominal size) and curing complete excluding the cost of form work in foundation and plinths in all leads and lift and to the entire satisfaction of Engineer-in-charge. | 11.94 | Cum | 4,500 ₹53,730 | 3,750 ₹44,775 | 3,250 ₹38,805 Lowest | 6,000 ₹71,640 |
| 4.00 | 2nd. class brick work using common burnt clay building bricks in foundation and plinth in cement mortor 1:4 (1cement :4 sand) in all lead and lifts and as per the direction of the Engineer-in-Charge. | 23.44 | Cum | 9,500 ₹2,22,680 | 7,000 ₹1,64,080 | 7,500 ₹1,75,800 | 5,200 ₹1,21,888 Lowest |
| 5.00 | 2nd. class brick work using common burnt clay building bricks in foundation and plinth in cement mortor 1:6 (1 cement : 6 sand) in all lead and lifts and as per the directions of the Engineer-in-Charge. | 28.63 | Cum | 9,500 ₹2,71,985 | 7,000 ₹2,00,410 | 7,500 ₹2,14,725 | 5,200 ₹1,48,876 Lowest |
| 6.00 | Filling in plinth with sand under floors including watering ramming consolidating and dressing complete under flooring complete in all respect including carriage of materials in all leads and lifts | 5.5 | Cum | 1,800 ₹9,900 | 1,100 ₹6,050 | 275 ₹1,512.5 Lowest | 1,600 ₹8,800 |
| 7.00 | P/L RCC seismic beam in cement concrete work 1:2:4(1cement:2sand: 4 graded stone aggregate 20mm nominal size & curing complete excluding the cost of form work and reinforcement for reinforced concrete work in Foundations,footings bases of columns and the like and mass concrete complete in all respect including carriage of materials in all leads and lifts | 1.01 | Cum | 7,375 ₹7,448.75 | 6,800 ₹6,868 | 4,500 ₹4,545 Lowest | 7,200 ₹7,272 |
| 8.00 | Providing and laying cement concrete work 1:2:4 (1 cement: 2 sand: 4 graded stone aggregate 20 mm nominal size) and curing complete excluding cost of from work and reinforcement for reinforced concrete work in Suspended floor roofs, landing and shelves and their support balconies, beams, girders, bressumers and contilever upto floor two level complete in all respect including carriage of materials in all leads and lifts | 9.46 | Cum | 6,800 ₹64,328 | 6,300 ₹59,598 | 4,800 ₹45,408 Lowest | 7,900 ₹74,734 |
| 9.00 | 2nd class brick work using common burnt clay building bricks in superstructure in cement mortor 1:6 (1 cement :6 sand) in all lead and lifts and as per the direction of the Engineer-in-Charge. | 19.24 | Cum | 9,500 ₹1,82,780 | 7,000 ₹1,34,680 | 7,500 ₹1,44,300 | 5,200 ₹1,00,048 Lowest |
| 10.00 | Half brick work using common burnt clay building bricks in superstructure above 1st floor level in cement mortar 1:4( 1Cement, 4 Sand ) of 2nd class bricks complete in all respect with in all leads and lifts. | 58.56 | Sqm | 1,090 ₹63,830.4 | 900 ₹52,704 | 460 ₹26,937.6 Lowest | 1,050 ₹61,488 |
Tender Value
₹69.7 L
EMD Value
₹1.3 L
Closing Date
23 Jul 2026, 11:00 amClosed
Executive Engineer JSV Flood Prot. Division Gagret
Executive Engineer JSV Flood Prot. Division Gagret
Construction of Civil work Providing, Laying jointing and Testing of Rising Main, Supply and Erection of Pumping Machinery with allied accessories, Providing laying of Distribution Network for T/well at Gondpur Banehra).
2026_HPIPH_139070_1
JSV-FPDG-2026-4212-51 dt 15.07.2026
Open Tender
Civil Works
Item Rate
180 days
Executive Engineer JSV Flood Prot. Division Gagret
Please refer Tender documents.
9 documents required · 9 mandatory
₹2,000
₹1.3 L
21 Sept 2026
15 Jul 2026
23 Jul 2026
15 Jul 2026
23 Jul 2026
15 Jul 2026
15 Jul 2026 - 23 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation trenches upto all depths in all classification of earth work such as pick work, jumper work,Chiselling or wedying out of soft and hard rock as blasting is prohibited, saturated soil including bailing out or pumping of water i/c cutting of bitumenous/concreate surface where ever required in all lifts i/c trimning and dressing of sides, levelling of beds to correct grade i/c shoring, strufing, blanking, timebering and dewatering wherever requiredstacking usable and unusable and unusable material/soil separetely and after laying jointing and testing of pipes (for pipes, pipe dust, chambers, etc.) returning the usable soil in 15cm layers by ramming asn watering and then disposing of all surplus excarted soil/unusable material as directed within all leads and lists and i/c cost as divertion of traffic, nightsigns boads, fixing coutions boards crossing ones trenchs for access to houses fencing etc. completeing in all respect within all leads and lifts as per direction of Engineer in Charge. | 0.4 | Cum | - | - |
| 2 | Providing and laying cement concrete 1:4:8 (1cement: 4 sand: 8 graded stone aggregate 40mm nominal size) and curing complete excluding cost of form work in foundation and plinths in all leads and lift and to the entire satisfaction of Engineer-in-charge | 6.54 | Cum | - | - |
| 3 | Providing and laying cement concrete 1:6:12 (1cement: 6 sand) 12 graded stone aggregate 40mm nominal size) and curing complete excluding the cost of form work in foundation and plinths in all leads and lift and to the entire satisfaction of Engineer-in-charge. | 11.94 | Cum | - | - |
| - | 2nd. class brick work using common burnt clay building bricks in foundation and plinth in cement mortor 1:4 (1cement :4 sand) in all lead and lifts and as per the direction of the Engineer-in-Charge. | 23.44 | Cum | - | - |
| - | 2nd. class brick work using common burnt clay building bricks in foundation and plinth in cement mortor 1:6 (1 cement : 6 sand) in all lead and lifts and as per the directions of the Engineer-in-Charge. | 28.63 | Cum | - | - |
| - | Filling in plinth with sand under floors including watering ramming consolidating and dressing complete under flooring complete in all respect including carriage of materials in all leads and lifts | 5.5 | Cum | - | - |
| - | P/L RCC seismic beam in cement concrete work 1:2:4(1cement:2sand: 4 graded stone aggregate 20mm nominal size & curing complete excluding the cost of form work and reinforcement for reinforced concrete work in Foundations,footings bases of columns and the like and mass concrete complete in all respect including carriage of materials in all leads and lifts | 1.01 | Cum | - | - |
| - | Providing and laying cement concrete work 1:2:4 (1 cement: 2 sand: 4 graded stone aggregate 20 mm nominal size) and curing complete excluding cost of from work and reinforcement for reinforced concrete work in Suspended floor roofs, landing and shelves and their support balconies, beams, girders, bressumers and contilever upto floor two level complete in all respect including carriage of materials in all leads and lifts | 9.46 | Cum | - | - |
| - | 2nd class brick work using common burnt clay building bricks in superstructure in cement mortor 1:6 (1 cement :6 sand) in all lead and lifts and as per the direction of the Engineer-in-Charge. | 19.24 | Cum | - | - |
| - | Half brick work using common burnt clay building bricks in superstructure above 1st floor level in cement mortar 1:4( 1Cement, 4 Sand ) of 2nd class bricks complete in all respect with in all leads and lifts. | 58.56 | Sqm | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.28 MB
Form6and8.pdf
Tender Documents • 1.06 MB
TermsandConditions.pdf
Tender Documents • 0.30 MB
BOQ_206010.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .