Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹4.3 L
EMD Value
₹4,400
Closing Date
27 Nov 2026, 3:00 pmDue today
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
ZONAL OFFICER
ZONE-X
Demolition and ReConstruction of the Damaged Compound Wall and Provision of New Play Equipment at ICDS Centres Nos. 101, 102 and 103 in Division-132, Unit-31, Zone-10.
2026_CoC_728915_1
Z.O.X.C.No.E2/KKM/587/01/2026
Open Tender
Civil Works
Works
KODAMBAKKAM
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹4,400
20 Nov 2026
20 Nov 2026
27 Nov 2026
20 Nov 2026
27 Nov 2026
20 Nov 2026
90 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling - Brick / Stone Masonry in cement mortar walls under 3m high | 8 | CUM | 302.96 | ₹2,423.68 |
| 2 | Dismantling RCC by manual / by using deploying machineries | 2.25 | CUM | 4,610.31 | ₹10,373.2 |
| 3 | Installation of Vertical Bored cast in situ RCC pi...eparately ) Grade of Concrete: M25 300 mm dia pile | 18.3 | R/M | 1,564.54 | ₹28,631.08 |
| 4 | Earth work Open excavation by Mechanical Means for... the departmental officers. (Excluding Refilling) | 3.45 | CUM | 199.33 | ₹687.69 |
| 5 | Supplying and filling in foundation, basement, etc...tion and as directed by the departmental officers. | 1 | CUM | 391.95 | ₹391.95 |
| 6 | Cement Concrete 1:5:10 (One cement, Five crushed ...partmental officers - Mixing by mechanical means | 1 | CUM | 5,756.01 | ₹5,756.01 |
| 7 | Supplying, fabricating and placing in position Rib...nt and binding wire) Upto plinth / Basement level | 280 | KGS | 96.53 | ₹27,028.4 |
| 8 | Supplying, fabricating and placing in position Rib...t and binding wire) Above plinth / Basement level | 150 | KGS | 98.7 | ₹14,805 |
| 9 | Supplying and erecting steel centering including n...l be given after the concrete is laid). FOUNDATION | 14.5 | SQM | 756.34 | ₹10,966.93 |
| 10 | Supplying and erecting steel centering including n...shall be given after the concrete is laid). COLUMN | 17.5 | SQM | 669.67 | ₹11,719.22 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.45 MB
BOQ_874776.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .