Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹245.5 CrAccepted-AOC | ₹245.5 Cr | L1 | Accepted-AOC Being the lowest and reasonable Tender |
| 2 | L2₹269.8 CrRejected-Finance | ₹269.8 Cr | L2 | Rejected-Finance Not being the lowest |
| 3 | L3₹276.0 CrRejected-Finance PLOT NO 65 SECTOR 18 OPP HIPA SARHAUL GURUGRAM 122 001 | ₹276.0 Cr | L3 | Rejected-Finance Not being the lowest |
| 4 | Rejected-Technical | - | - | Rejected-Technical Not eligible as per NIT criteria |
Tender Value
₹277 Cr
EMD Value
₹15 L
Closing Date
16 Aug 2023, 6:00 pmClosed
Chief Engineer Navy Mumbai
26, Assaye Building, Colaba, Mumbai-400005
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) OF PROVISION OF DEFICIENT MD ACCN FOR SAILORS 416 DUs, G PLUS 29 FLOORS AT WORLI, MUMBAI
2023_MES_597234_1
87924/E8
Open Tender
Civil Works
1461 days
Worli
As per Tender Documents
9 documents required · 9 mandatory
₹3,000
GE (P) NW No. 2 Mumbai
₹15 L
Yes
HQ CE Navy Mumbai office
14 Nov 2023
22 May 2023
18 Aug 2023
22 May 2023
16 Aug 2023
2 Aug 2023
22 May 2023 - 5 Jun 2023
5 Jun 2023
Amount
Design and Construction of Multi-storeyed Deficient Sailors Married Accomodation in Two Towers {each tower (G+29) Floors for 208 DUs} total for 416 DUs including Multi-level Car & 2 Wheeler parking, etc., at Worli, Mumbai, complete, all as detailed in scope of work and other documents of tender, complete all as specified and directed.
MANNING & OPERATION OF LIFTS (REFER ANNEXURE-XX)
Manning & Operation of fully automatic electrically operated passenger lift of provided make, type and 16 passengers lifts - 10 Nos, covering total 30 floors, speed 2.5m/sec, SS lift installed in the subject project as per tender by placing 02 x lift operators in 1st & 2nd shifts and 01 operator in night shift for both the towers (Total number of lift operators are 05 nos.) on all days including Sundays and holidays (1st Shift-0600 hrs to 1400 hrs and 2nd Shift-1400 hrs to 2200 hrs and night shift-2200 hrs to 0600 hrs) including taking care of all lifts from any pilferage or damage etc. Period of manning & operation shall be 60 months (24 months during Defects Liability Period and 36 months after DLP) from the date of completion of the project, complete all as mentioned below and all as specified and directed:-
11 months after completion of work
11 months after completion of BoQ Sl. item No. 2.02 here-in-before
11 months after completion of BoQ Sl. item No. 2.03 here-in-before
11 months after completion of BoQ Sl. item No. 2.04 here-in-before
11 months after completion of BoQ Sl. item No. 2.05 here-in-before
05 months after completion of BoQ Sl. item No. 2.06 here-in-before
MANNING & OPERATION OF WATER SUPPLY INSTALLATIONS , FIRE FIGHTING INSTALLATIONS & DG SET (REFER ANNEXURE-XXII)
Manning & Operation of water supply installation consisting of Fire fighting installations, electrically operated pump sets (for fresh water and for treated grey water) of different capacities including DG set installed in the subject project as per tender by placing one FGM and one valve man in each shift and maintenance of log book, taking care of pumps / valves / overflow of tanks, other minor repairs and leakages daily in three shifts from 0600 hrs to 1400 hrs, 1400 hrs to 2200 hrs and 2200 hrs to 0600 hrs including cleaning, daily maintenance, testing onsite water parameters using pH tester, chloroscope, TDS meter etc.Period of manning & operation shall be 60 months from the date of completion of the project. (TOTAL number of FGM required per day are 03 nos.) on all days including Sundays and Gazetted holidays during the defects liability period of the project and for 03 years after the defects liability period of the project, complete all as mentioned below and all as specified and directed:-
11 months after completion of work
11 months after completion of BoQ Sl. item No. 3.02 here-in-before
11 months after completion of BoQ Sl. item No. 3.03 here-in-before
11 months after completion of BoQ Sl. item No. 3.04 here-in-before
11 months after completion of BoQ Sl. item No. 3.05 here-in-before
05 months after completion of BoQ Sl. item No. 3.06 here-in-before
COMPREHENSIVE MAINTENANCE OF LIFTS (REFER ANNEXURE-XXI)
Comprehensive maintenance as per OEM manual and repairs of fully automatic electrically operated passenger lift of provided make and 16 Passengers, 1088kg, covering total 30 floors, speed 2.5m/sec, SS lift installed in the subject project as per tender for lifts (Total 10 Passengers Lifts), comprising of all devices and accessories through out 36 months on all days including holidays for period of 03 years after expiry of defects liability period, complete all as mentioned below and all as specified and directed.
One year after expiry of defects liability period
One year after completion of BoQ Sl. item No. 4.02 here-in-before
One year after completion of BoQ Sl. item No. 4.03 here-in-before
COMPREHENSIVE MAINTENANCE OF WATER SUPPLY INSTALLATIONS , FIRE FIGHTING INSTALLATIONS & DG SET (REFER ANNEXURE-XXIII)
Comprehensive annual maintenance including all repairs / replacement and preventive maintenance / servicing of Complete water supply installations, fire fighting and fire alarm installation and DG set-01 No all as provided & installed under subject work throughout for a period of 03 (Three) years) including Sundays and holidays after expiry of defects liability period, complete all as mentioned below and all as specified and directed.
One year after expiry of defects liability period
One year after completion of BoQ Sl. item No. 5.02 here-in-before
One year after completion of BoQ Sl. item No. 5.03 here-in-before
COMPREHENSIVE MAINTENANCE OF ELECTRIC SUPPLY WORKS (REFER ANNEXURE-XXVI)
Annual Comprehensive maintenance including all repairs / replacement and preventive maintenance / servicing of Complete electric works consisting of point wiring, light fittings, ceiling fans, exhaust fans, switches, sockets, modular box and cover plate, MCBs (SP/SPN), DBs, submain wiring and telephone & TV wiring, LT cables, junctions, LT panels, earthing, aviation light, lightning protection, MCCBs, rising bus trunking, tap off boxes etc all as required throughout for a period of 03 (Three) years including Sundays and holidays after expiry of defects liability period, complete all as mentioned below and all as specified and directed.
One year after expiry of defects liability period
One year after completion of BoQ Sl. item No. 6.02 here-in-before
One year after completion of BoQ Sl. item No. 6.03 here-in-before
COMPREHENSIVE MAINTENANCE OF BUILDINGS INCLUDING POLISHING OF FURNITRE
Comprehensive maintenance and repairs including replacement of materials of Buidings & Structures (Annexure - I) and connected services of Internal water supply works covered under Annexure - III, Road / Path / Hardstanding / Culvert works covered under Annexure-XII, Sewage Disposal covered under Annexure - XV, Area drainage covered under Annexure - XVI, Compound Wall works covered under Annexure-XVII, Retaining Wall works covered under Annexure-XVIII, Arboriculture covered under Annexure - XIX and Polishing of Furniture covered under BoQ through out 12 months on all days including holidays for a period of 03 years after expiry of defects liability period, complete all as mentioned below and all as specified and directed.
One year after expiry of defects liability period
One year after completion of BoQ Sl. item No. 7.02 here-in-before
One year after completion of BoQ Sl. item No. 7.03 here-in-before
NOTES :- (i) Rates quoted under Sch A shall be for both materials and labour complete unless mentioned otherwise. (ii) Fire fighting system consists of all component including staircase pressurisatuion system (as applicable) shall be chcked and testing in the presence of user rep once a month in the first week of the month, as per standard laid down procedure and IS code of practice. Any defect noticed and rectification required shall be attended urgently but not later than 48 hours. After rectification, the system will be agains checked and tested to entire satisfaction of users and MES authorities. Failure to rectify the noticed defect beyond 48 hours shall invite a penalty of ₹10,000.00 per day. In case of rectification of defects beyond 07 days, the same shall be carried out at the risk and cost of contractor and amount will be deducted from the contractor. A record of monthly checking and testing and jointly signed by users rep and MES rep and contractor rep shall be maintained and forwarded to MES authorities once in a quarter. (iii) Repairs / replacement and preventive maintenance/servicing of fire fighting system shall consists of fire alarm system comprising oif intelligent addressable type automatic fire detectors, alarms and voice controls, smoke and heat detectors, sprinklers, piping network valves and hydrants, control and mimic panels, staircase pressurisation (as applicable), motors, fan etc.,
(iv) Repairs / replacement and preventive maintenance / servicing including consumables like bulbs/tubes etc., of internal electrification consisting of point wiring, light fittings, ceiling fans, exhaust fan, switches, sockets, modular box and cover plates, MCBs (SP/SPN), DBs, submain wiring and telephone/TV wiring. (v) The contractor shall maintain a team of electricians at the premises to attend the day-to-day complain. This shall be in addition to the manning and operation staff required to be provided in terms of provisions made in the contract. The team of trained man-power shall be as below (minimum) :- Electrician - 01 No & Helper - 01 No (vi) The contractor shall maintain a minimum invertory of spares, stores, tools and plants for attending the complaints quickly and avoid incovenience and penalty (vii) The failure of the contractor to carryout requisite repairs / replacement of the items / components / service as a whole or in part on account of fault / breakdown occuring in any service and beyond the stipulated time as mentioned below, shall invite penalty as per the details given below and the same shall be deducted from the due payments of contractor. (viii) For breakdown in electricity in a quarter or cluster of quarters, the same shall be attended within 06 hours (maximum). A penalty @ ₹1,000.00 per hour thereafter shall be levied in case of delay beyond 06 hours. (ix) Major breakdown of electricity in a cluster of multiple floors, the same shall be attended within 12 hours. Beyond 12 hours, penalty @ ₹5,000.00 per hour shall be levied on the contractor. In case, the contractor fails to attend such a complain even beyond 24 hours, then the department shall get the repair done at the risk and cost of the contractor and repair cost incurred to the department shall be recovered from the contractor, apart from the pro-rate penalty charges as mentioned above.
MANNING & OPERATION OF STP (REFER ANNEXURE-XXIV)
Manning & Operation of STP installation consisting of Electro Mechanical components like sewage pump sets, air blowers, valves, filter feed pumps, DMF, ACF, chlorine dozers, sludge transfer pumps etc of different capacities installed in the subject project as per schedule by deploying 01 x FGM (Skilled) and 01 x FGM (mate) in 03 shifts of 8 hours each on all days including Sundays and holidays (1st Shift-0600 hrs to 1400 hrs, 2nd Shift-1400 hrs to 2200 hrs and 3rd Shift 2200 hrs to 0600 hrs)and maintenance of log book, taking care of pumps / valves / overflow of tanks, other minor repairs and leakages daily in three shifts for 05 (five) years from the date of completion of the project. (TOTAL number of FGM required per day are 06 nos.), complete all as mentioned below and all as specified and directed:-
11 months after completion of work
11 months after completion of BoQ Sl. item No. 8.02 here-in-before
11 months after completion of BoQ Sl. item No. 8.03 here-in-before
11 months after completion of BoQ Sl. item No. 8.04 here-in-before
11 months after completion of BoQ Sl. item No. 8.05 here-in-before
05 months after completion of BoQ Sl. item No. 8.06 here-in-before
COMPREHENSIVE MAINTENANCE OF STP (REFER ANNEXURE-XXV)
Comprehensive annual maintenance as per OEM manual and repair / replacement of defective parts of STP Plant 160 KLD installed in the subject project as per schedules and supply of MBBR media, sodium hypochlorite, jaggery, Urea etc as required for efficient sewage treatment throughout for a period of 03 (Three) years including Sundays and holidays after expiry of defects liability period (DLP), complete all as mentioned below and all as specified and directed.
One year after expiry of defects liability period
One year after completion of BoQ Sl. item No. 9.02 here-in-before
One year after completion of BoQ Sl. item No. 9.03 here-in-before
FURNITURE
Supply only Almirah medium steel, as per drawing No. FD-1032, complete all as specified and directed.
Supply only Bed hard, as per drawing No. FD/E6/MAP-II/08(R), complete all as specified and directed.
Supply only Chair Easy, as per drawing No. FD-229, complete all as specified and directed.
Supply only Chair dining JCOs/Ors, as per drawing No. FD/MAP-II/05, complete all as specified and directed.
Supply only Chair verandah JCOs / Ors, as per drawing No. FD-256, complete all as specified and directed.
Supply only Chair writing, as per drawing No. FD-280, complete all as specified and directed.
Supply only Charpoy folding IP hard top, as per drawing No. FD-388(R), complete all as specified and directed.
Supply only Charpoy IP hard top, as per drawing No. FD/MAP-II/01, complete all as specified and directed.
Supply only Peg table, as per drawing No. FD-384, complete all as specified and directed.
Supply only Rack shoe steel, as per drawing No. FD/E6/MAP/02(R), complete all as specified and directed.
Supply only Table bed side, as per drawing No. FD/E6/MAP/15(R), complete all as specified and directed.
Supply only Table centre, as per drawing No. FD-274, complete all as specified and directed.
Supply only Table dining 1200mm x 900mm, as per drawing No. FD/MAP-II/03, complete all as specified and directed.
Supply only Table dressing ladies, as per drawing No. FD/MAP-II/07, complete all as specified and directed.
Supply only Dressing Mirror, as per drawing No. FD/E6/MAP/16, complete all as specified and directed.
Supply only Table 900mm x 600mm, as per drawing No. FD-283, complete all as specified and directed.
Som Projects Pvt. Ltd.
Varindera Constructions Limited
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.07 MB
Download all tender documents and submit your bid