Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
Refer Docs
EMD Value
₹14,000
Closing Date
22 Oct 2026, 3:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
BLOCK DEVELOPMENT OFFICER BP, SETHUBAVACHATRAM
BLOCK DEVELOPMENT OFFICE BP, SETHUBAVACHATRAM
Construction of Public distribution shop (Angadi ) building at Kaivanavayal in umathanadu panchayat under SFC District Panchayat
2026_RDTN_711496_1
1687/2026/A2
Open Tender
Civil Works - Others
Works
90 days
UMATHANADU
Please refer Tender documents.
9 documents required · 9 mandatory
₹0
₹14,000
7 Oct 2026
7 Oct 2026
22 Oct 2026
7 Oct 2026
22 Oct 2026
7 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of New Public Distribution shop(Angadi) building at Kaivanavayl in Umathanadu Panchayat | - | - | - | - |
| 2 | Earthwork excavation for foundation in all soils and sub soils and to full depth as may be directed except in rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth in layers of not more than 15cm thick, well rammed and consolidated and depositing the surplus earth within the compound in places shown by the departmental officers with initial lead and lift etc.,including levelling the sites complete complying with standard specifications and as directed. | 40.15 | Cu.m | - | - |
| 3 | Collection and supply of metal sand from approved quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete, | 6.25 | Cu.m | - | - |
| 4 | C.C.(1:4:8) Mix using 40mm ISS & HBG metal including cost & conveyance & Labour charge etc. complete. | 9.94 | Cu.m | - | - |
| 5 | Brick work in CM 1:5 mix using country bricks ground moulded of size 83/4"x41/4"x21/4" for the following including curing etc., complete complying with standard specifications. Rate for 10m3 | 6.46 | cu.m | - | - |
| 6 | Walls Above Basement (Super Structure) | 14.6 | cu.m | - | - |
| 7 | Supplying and erecting centering shuttering including necessary supports for plane etc., complete. For Foundation and basement | 46.26 | sq.m | - | - |
| 8 | For Column,Lintel slabs | 119.03 | sq.m | - | - |
| 9 | Supplying and fabrication of steel including cost and conveyance of bending to shape and tying in position and forming grills for all R.C.C works including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing | 1.96 | MT | - | - |
| 10 | Reinforced Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs wherever necessary and bearing surfaces of walls , sides and bottom of the slabs, beams etc., as directed by the departmental officers complete complying with standard specifications. Foundation to basement | 9.05 | Cu.m | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.86 MB
UMATHANADUTENDER.pdf
Tender Documents • 0.84 MB
PriceBid.pdf
Additional Documents • 0.30 MB
TechnicalBid.pdf
Additional Documents • 0.49 MB
BOQ_854789.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .