Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.1 LAccepted-AOC | L1 | Accepted-AOC Bid Stands L1 | |
| 2 | L2₹10.8 L+₹69,493 (6.86%)Rejected-AOC | L2 | Rejected-AOC Bid Stands L2 | |
| 3 | L3₹11.4 L+₹1.3 L (12.4%)Rejected-AOC | L3 | Rejected-AOC Bid Stands L3 | |
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹11.4 L
EMD Value
₹22,859
Closing Date
5 Jun 2026, 4:00 pmClosed
Exe. Engineer, Alipurduar Highway Division
O/o. the Exe. Engineer, Alipurduar Highway Division, P.W.(R)Dte., Manna Dey Street, College Halt, Alipurduar- 736 122
Falakata-Madarihat road potholes repairing work stretches from 6.50km. to 7.00km., 10.00km. to 14.50km. under Alipurduar Highway Division in the district of Alipurduar during the year 2026-27.
2026_WBPWD_5014243_1
WBPWD(R)/AHD/EE/NIT- 01(e)/2026-27
Open Tender
CIVIL WORKS
Percentage
21 days
Falakata-Madarihat Road
Please refer Tender documents.
7 documents required · 7 mandatory
₹22,859
Yes
24 Jun 2026
21 May 2026
8 Jun 2026
21 May 2026
5 Jun 2026
21 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Repairing pot-holes and making up small depressions with ramming or power rolling including screening, cleaning chips or metals and washing, drying as necessary and heating the chips or metal where necessary, cutting pot holes to regular shapes with vertical edges, cleaning the disintegrated materials, heating matrix and applying tack coat (including sides), finishing the top of repaired surface levelled with adjoining area, including cost and carriage of stone aggregates and matrix, including cost of applying tack coat. [Tack coat is to be considered included] ) i) With premixed Chips or Bajrees with 54kg of bitumen per m3 of loose net volume of stone chips using concrete mixer machine. (The payment is to be made on the basis of loose net volume of stone materials consumed in the work) (b) Using Mobile HMP (Light duty) (Using PAKUR VARIETY STONE) | 162.29 | m3 | 4,524.34 | ₹7,34,255.14 |
| 2 | B. Providing and laying Premixed Seal Coat (Type B) with approved quality sand/grit @ 0.6 m3/ 100 m2 and bitumen binder on thoroughly cleaned black top surface coated with tack coat, including heating and mixing cleaned sand/grit (100 % passing through 2.36 mm sieve and retained on 180 micron sieve) uniformly with bitumen binder, laying and spreading the mix at an uniform rate using suitable means, brushing the surface, if necessary, to ensure uniformity, followed by rolling with power roller including the cost and carriage of binder and aggregates, cost of heating the binder and aggregates and all other incidental charges, cost of fuel and lubricants, including hire charges of machineries, tools & plants required for construction and quality control complete as per Clause 511 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). II By Manual Means With Hot Bitumen Binder (@ 6.80 kg / 10 sqm.) (Using PAKUR VARIETY STONE) | 2,746.44 | m2 | 45.11 | ₹1,23,891.91 |
| 3 | Tack Coat Providing and applying tack coat with Cationic Bitumen Emulsion of approved grade conforming to IS: 8887-1978 on the prepared surface cleaned with Hydraulic broom, moistening the surface including cost and carriage of emulsion, hire charges of machinery and labour, cost of fuel and lubricants all complete as per Clause 503 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (i) On Bituminous Surface (Using Bitumen Emulsion at the rate of 0.20 to 0.30 kg per sqm.) | 2,746.44 | m2 | 10.08 | ₹27,684.12 |
| 4 | Dressing and chilchalling Road flanks including cutting and filling with earth up to 150mm. average thickness finished with outward cross-grade of 1 in 30. | 6,000 | m2 | 12.2 | ₹73,200 |
| 5 | Add GST @ 18% on Rs. 09,59,031.17 i.e. total amount over item no. 1 to 04 | 9,59,031.17 | % | 18 | ₹1,72,62,561.06 |
| 6 | Add Labour Welfare Cess @ 1% of Rs. 11,31,656.78 i.e. total amount Item No. 1 to 05 | 11,31,656.78 | % | 1 | ₹11,31,656.78 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.05 MB
Tendernotice_2.pdf
PDF • 0.17 MB
Tendernotice_3.pdf
PDF • 0.52 MB
Tendernotice_4.pdf
PDF • 0.90 MB
BOQ_5082224.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .