| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹65.0 LAccepted-AOC | ₹65.0 L | L1 | Accepted-AOC L1 |
| 2 | Not Admitted-Fee/PreQual/Technical SEYNAMVILAI IN NEYYOOR TOWN PANCHAYAT | MADURAI | TAMIL NADU | 625001 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | WORKS CONTRACT S FRANCIS L1 |
|---|---|---|---|---|
| 1.00Earth work excavation and depositing on bank with initial lead 10m and lift of 2.0m in the following classification of all soils, bailing out water wherever necessary including providing danger lights etc., and as directed as per specification SS 20B | ||||
| 2.00 | All Soil | 81.48 | m3 | 256 ₹20,858.88 |
| 3.00 | Plain Cement concrete 1:4:8 (one cement, four sand and eight course aggregate of 40mm size hard blue granite broken stone) for levelling course for foundation including the cost of mixing, placing the concrete in position, consolidating finishing | 36.19 | m3 | 5,450 ₹2.0 L |
| 4.00Reinforced cement concrete M30 design mix using 10mm and 20mm Hard Broken Stone. The rates excluding the cost of supplying, fabricating and placing in opposition of MS / RTS Grills for reinforcement and centering, strutting & shuttering, etc complete | ||||
| 5.00 | (i) below 1.50m to 4.50m depth from G.L | 8.49 | m3 | 8,520 ₹72,334.80 |
| 6.00 | Below G.L upto 1.50m depth | 8.42 | m3 | 8,520 ₹71,738.40 |
| 7.00 | Above G.L upto 4.50m height | 11.3 | m3 | 8,658 ₹97,835.40 |
| 8.00 | Above 4.50m to 7.32m ht., from G.L | 2.52 | m3 | 8,661 ₹21,825.72 |
| 9.00 | Above 7.32m to 10.98m ht., from G.L | 10.35 | m3 | 8,938 ₹92,508.30 |
| 10.00 | Above 10.98m to 14.64m ht., from G.L | 10.35 | m3 | 9,216 ₹95,385.60 |
Tender Value
₹79 L
EMD Value
₹79,000
Closing Date
11 Feb 2026, 3:00 pmClosed
Executive Officer
Reethapuram Town Panchayat
Construction of 2.00 LL capacity of OHT 16.00 m Staging at Shajan Mahal in Reethapuram Town Panchayat
2026_DTP_650841_1
282/2025/A1
Open Tender
Civil Works - Water Works
180 days
Reethapuram Town Panchayat
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹79,000
Yes
Reethapuram Town Panchayat
26 May 2026
4 Feb 2026
11 Feb 2026
4 Feb 2026
11 Feb 2026
4 Feb 2026
6 Feb 2026
Earth work excavation and depositing on bank with initial lead 10m and lift of 2.0m in the following classification of all soils, bailing out water wherever necessary including providing danger lights etc., and as directed as per specification SS 20B
All Soil
Plain Cement concrete 1:4:8 (one cement, four sand and eight course aggregate of 40mm size hard blue granite broken stone) for levelling course for foundation including the cost of mixing, placing the concrete in position, consolidating finishing
Reinforced cement concrete M30 design mix using 10mm and 20mm Hard Broken Stone. The rates excluding the cost of supplying, fabricating and placing in opposition of MS / RTS Grills for reinforcement and centering, strutting & shuttering, etc complete
(i) below 1.50m to 4.50m depth from G.L
Below G.L upto 1.50m depth
Above G.L upto 4.50m height
Above 4.50m to 7.32m ht., from G.L
Above 7.32m to 10.98m ht., from G.L
Above 10.98m to 14.64m ht., from G.L
Above 14.64m ht., to 18.30m ht.,
Above 18.30m ht., to 21.96m ht.,
Centering for soffits of reinforced cement concrete slabs or plain surface including strutting upto 3m ht., using MS sheet of size 90cm x 60cm and BG. 10 gauge stiffened with welded MS angles of size 25mm x 2mm x 3mm laid over silver oak (country wood)
Upto 3.30m ht., from G.L
Circular column upto 3.30m ht., from floor level
From 3.30m to 4.30m ht.
From 7.30m ht., to 8.30m ht.
From 11.30m to 12.30m ht.
From 15.30m to 16.30m ht.
Centering for square column - upto 3.30m ht.
From 3.30m to 4.30m ht.,
From 4.30m to 5.30m ht.,
From 5.30m to 6.30m ht.,
From 6.30m to 7.30m ht.,
From 7.30m to 8.30m ht.,
From 8.30m ht., to 9.30m ht.,
From 9.30m ht., to 10.30m ht.,
From 10.30m ht., to 11.30m ht.,
From 11.30m ht., to 12.30m ht.,
From 12.30m ht., to 13.30m ht.,
From 13.30m ht., to 14.30m ht.,
From 14.30m ht., to 15.30m ht.,
Curved Surface
Centering for curved surface
Upto 0-3.30 m(from floor slab working platform)
Supplying, fabricating and placing in position of RTS grills for reinforcement for various members including cost of steel for all RCC works etc., complete as per standard specifications and as directed by Engineer-in-charge. The rate to include the cost
Painting two coats with approved cement paint best quality over the outer wall surface including cost of cement paint etc. complete complying with standard specification etc., complete as per standard specifications and as directed by Engineer-in-charge
Providing Cut stone set in CM 1:3 (one cement and three sand) using well dressed cut stone supporting inlet pipe of size 0.30 x 0.30 x 0.15m for service reservoir etc., complete as per standard specifications and as directed by Engineer-in-charge
|Supplying and fixing in position of RCC |(1:1.5:3) in side access ladder of |following size using 20mm size HBS jelly |including cost of all materials,|centring, shuttering,strutting,|fabrication and placing in position of |reinforcement, finishing, curing etc.,|complete and as directed by Departmental Officers.
Construction of RCC spiral staircase in RCC 1:1.5:3 (1 Cement : 1.5 Sand : 3 Coarse Aggregate) using 20 mm HBGS of 1.80 m diameter of required height for approach to the roof of Service Reservoir with RCC Handrails including earthwork excavation, providing CC 1:4:8 mix, RCC footing 1:1.5:3 mix, GL platform etc., and also including cost of steel reinforcement, fabrication charges, scaffolding, centering, precasting charges, cement, painting etc. complete as per standard specifications and as directed by Engineer. The staircase shall be braced to the column of service reservoir at suitable interval. (in the BOQ, quantity column the exact height to be mentioned from GL to roof slab bottom to get total value of work to be done.
Supplying and fixing of RCC 1:1.5:3 (1 Cement : 1.5 Sand : 3 Coarse Aggregate) using 20 mm HBGS for RCC Handrails of 0.91 m height over the top of roof slab of approved pattern and design including the cost of reinforcement, centering, precasting, finishing etc complete
Supplying and fixing in position of 0.60 x 0.60m water tight CI manhole frame and cove of approved pattern at the roof slab and as directed. The manhole frame and cover should be of light duty and confirming to IS: 1726-1974
Supply and fixing in position of enamel water level indicator with all accessories of approved pattern and design etc., complete as per standard specifications and as directed by Engineer-in-charge (WD-M1383) Vol II 95
Providing and fixing of RCC 1:2:4 (one cement, two sand and four course aggregate of 20mm size hard blue granite broken stone) for ventilators of approved pattern including cost of cement, reinforcement, centering, shuttering, strutting etc., complete 0.30m dia
Pipe Connection (Inlet, Outlet, Over flow, Scour & Civil work) ( Vide separate sheet)
Labour charges for Painting TWAD Board Emblem in accordance with the size and specifications as approved by the Board on the Service Reservoirs including cost of all consumables, one coat of base paint, scaffolding charges including painting NRDWP Logo on the Service Reservoirs.
Refilling the foundation with excavated Soil (other than sand) in layers of not more than 15cm thick, watering, well ramming, consolidating, complying with standard specification and as directed by Departmental Officers.
Labour for cutting open road for laying water mains or sewer (BT Roads)
Plain Cement concrete 1:2:4 (one cement, two sand and four aggregates) using 20mm ISS HBG metal including cost of all materials and labour charges for mixing, laying, compacting and curing etc, complete as per standard specifications. TNDSS NO: 30 V,VI (S3) VII-3
Supply and delivery of 110 mm HDPE pipe PN 10 including all taxes conveyance charges etc complete
Lowering the 110 mm HDPE pipe
Jointing the 110 mm HDPE pipe
Earth work excavation for pipe line including all cost of materials and labour cost etc.,
Refilling the excavated earth to site from site including all cost of material and labours cost etc.,
Pipe Specials
110 mm 90 degree bend
80 mm DI D/F Gate valve for Scour in 110 mm HDPE main
40 mm CI Double Air Valve in 110 mm HDPE main
100 mm DI D/F Gate Valve in 110 mm HDPE main
Testing of pipes for water supply with hydraulic testing equipment by filling with water (including cost of water) and testing to recommended pressure in convenient stretches and attending the bursts if any occured during the test, excluding the cost of pipes but including other incidential and operational charges etc.,
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.14 MB
BidOHT79.pdf
Tender Documents • 0.27 MB
BOQ_780404.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid