Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹9.3 CrAccepted-AOC 1849 JUGRAJPUR SACHENDI KANPUR KANPUR NAGAR UTTAR PRADESH 208023 UDYAM UP 43 0012110 | KANPUR NAGAR | UTTAR PRADESH | 208023 | ₹9.3 Cr | 1 | Accepted-AOC l1 |
| 2 | 2₹9.8 Cr+₹48.1 L (5.18%)Rejected-AOC RAM NAGAR NEW BUS STAND NARWANA 126116 | NARWANA | JIND | HARYANA | 126116 | ₹9.8 Cr+₹48.1 L (5.18%) | 2 | Rejected-AOC l2 |
| 3 | 3₹10.5 Cr+₹1.2 Cr (13.2%)Rejected-AOC 48 GF SECTOR 1 HUDA NARNAUL MAHENDRAGARH HARYANA 123001 | NARNAUL | MAHENDRAGARH | HARYANA | 123001 | ₹10.5 Cr+₹1.2 Cr (13.2%) | 3 | Rejected-AOC l3 |
| 4 | 4₹10.6 Cr+₹1.3 Cr (14.2%)Rejected-AOC NEAR AANGANBADI CENTRE VPO THOBA DHANI TESHIL DISTT FATEHABAD 125050 | HISAR | HARYANA | 125050 | ₹10.6 Cr+₹1.3 Cr (14.2%) | 4 | Rejected-AOC l4 |
| 5 | 5₹11.0 Cr+₹1.7 Cr (18.9%)Rejected-AOC 259 JAY RAM NAGAR KHAMBHAPUR ROAD FATEHPUR FATEHPUR UTTAR PRADESH 212601 | FATEHPUR | UTTAR PRADESH | 212601 | ₹11.0 Cr+₹1.7 Cr (18.9%) | 5 | Rejected-AOC l5 |
| Sl No | Description | Qty | Unit | m/s omparkash contractor L5 | M/S LAXMI CONSTRUCTION CO. L6 | jaipal singh s/o sardara singh L9 | M/S SHREE BALAJI BUILDERS L7 | Raghbir Singh Contractor L2 | Pali Ram Contractor L3 | The Tibba Dana Sher Co Op L and C Society Limited L8 | M/s Balaji Construction Co. L1 | Shree Salasar Associates L4 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | SCRUBBING BRUSHING AND CLEANING SURFACE OF EXISTING LINING FOR LAYING C.CONC M-15 | 2,19,013.97 | Sqm | 7 ₹15,33,097.79 | 3.96 ₹8,67,295.32 | 4.55 ₹9,96,513.56 | 4.03 ₹8,82,626.3 | 3.51 ₹7,68,739.03 | 4.55 ₹9,96,513.56 | 4 ₹8,76,055.88 | 2.5 ₹5,47,534.93 Lowest | 3.78 ₹8,27,872.81 |
| 2.00 | Lining with design mix concrete of grade M-15 with minimum cement content 240kg/cum, 100 mm thick in curve portion and side slope Using Paver including Curing and rendering with cement sand (1:3) slurry 3mm thick over existing tile lining, as per directions of Engineer-in-charge. | 2,19,013.97 | Sqm | 375 ₹8,21,30,238.75 | 338.88 ₹7,42,19,454.15 | 386.5 ₹8,46,48,899.41 | 344.4 ₹7,54,28,411.27 | 299.88 ₹6,56,77,909.32 | 331 ₹7,24,93,624.07 | 400 ₹8,76,05,588 | 289 ₹6,32,95,037.33 Lowest | 322.65 ₹7,06,64,857.42 |
Tender Value
₹12.6 Cr
EMD Value
₹25.3 L
Closing Date
3 Sept 2025, 5:00 pmClosed
NITIN BHARGAVA
M/Garh W.S. Divn. M/Garh
Estimate for Balance work of Rehabilitation of Narnaul Branch from km. 0.000 to 21.488
2025_HRY_465116_1
2025BD7F8EB9 049B 476B 8871 6F8CED49EA7A141IRR
Open Tender
Civil Works
Works
365 days
BERI BUCHOLI CHITLANG DULANA KHERA MEGHANWAS
4 documents required · 4 mandatory
₹20,000
₹25.3 L
Yes
O/o Executive Engineer
11 Feb 2026
13 Aug 2025
4 Sept 2025
13 Aug 2025
3 Sept 2025
13 Aug 2025
13 Aug 2025 - 3 Sept 2025
20 Aug 2025
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.73 MB
BOQ_542920.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .